Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP4A : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-R�WP4A� C�

UIT-R�WP4A

Utilizaci�n Eficaz de la Orbita y del Espectro para el SFS y el SRS

Resultados :915 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 765 ]
Proposed modifications to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz � China (People's Republic of) AI1.5 2018-06-26
[ 764 ]
Proposed modifications to working document towards draft CPM text for WRC-19 agenda item 1.5 � China (People's Republic of) AI1.5 2018-06-26
[ 763 ]
Proposal for updates to preliminary draft CPM text for WRC-19 agenda item 7 - Issue A � China (People's Republic of) AI7 2018-06-26
[ 762 ]
Views and proposals on the studies of the WRC-19 agenda item 9.1, issue 9.1.2 � China (People's Republic of) AI9.1 2018-06-26
[ 761 ]
Proposed modifications to preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9 � China (People's Republic of) AI9.1 2018-06-26
[ 760 ]
Proposed modifications to working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9 � China (People's Republic of) AI9.1 2018-06-26
[ 759 ]
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 1.6 � China (People's Republic of) AI1.6 2018-06-26
[ 758 ]
Proposed modifications to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz � China (People's Republic of) AI1.5 2018-06-26
[ 757 ]
[Draft] working document - Simplified regulatory regime for non-GSO satellites with short duration mission � South Africa (Republic of) , Netherlands (Kingdom of the) , Rwanda (Republic of) , Zimbabwe (Republic of) 2018-06-26
[ 756 ]
Revisions to working document on WRC-19 agenda item 1.5 - Operation of Earth Stations in Motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz � Institute of Electrical and Electronics Engineers, Inc. 2018-06-26
[ 755 ]
Proposals regarding WRC-19 agenda item 7, Issue K - Difficulties for part B examinations under 4.1.12 or 4.2.16 of RR Appendices 30 and 30A and 6.21 c) of RR Appendix 30B � Asia Satellite Telecommunications Co. Ltd. (AsiaSat) AI7 2018-06-26
[ 754 ]
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 1.6 � United States of America AI1.6 2018-06-26
[ 753 ]
Sharing study relating (I/N) to spectral efficiency of satellite networks using adaptive coding and modulation (ACM) � Canada AI1.6 2018-06-25
[ 752 ]
Update to EESS compatibility study in the 50 GHz range under agenda item 1.6 � Canada AI1.6 2018-06-25
[ 751 ]
Revision to sharing study between GSO and non-GSO FSS systems in the 50/40 GHz bands - WRC-19 agenda item 1.6 � Canada AI1.6 2018-06-25
[ 750 ]
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue I � Canada AI7 2018-06-25
[ 749 ]
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A � Canada AI7 2018-06-25
[ 748 ]
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue H � Canada AI17 2018-06-25
[ 747 ]
Elements for the preliminary draft CPM text for WRC-19 agenda item 1.6 � Canada AI1.6 2018-06-25
[ 746 ]
Establishment of Correspondence Group for review of V-band GSO reference links - WRC-19 agenda item 1.6 � Canada AI1.6 2018-06-25
[ 745 ]
Revisions for the draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9 � Canada AI19.1 2018-06-25
[ 744 ]
Revisions for the draft CPM text for WRC-19 agenda item 1.5 � Canada AI1.5 2018-06-25
[ 743 ]
FSS protection criteria to be used in studies for WRC-19 agenda items 1.13 and 1.14 for bands between 24.25 and 86 GHz � Brazil (Federative Republic of) AI1.16, AI1.14, AI1.13 2018-06-25
[ 742 ]
Proposed executive summary for the working document towards draft CPM text for WRC-19 agenda item 7 - Issue I � Brazil (Federative Republic of) AI7 2018-06-25
[ 741 ]
Proposed executive summary for the working document towards draft CPM text for WRC-19 agenda item 7 - Issue H � Brazil (Federative Republic of) AI7 2018-06-25
[ 740 ]
Proposed executive sumary for the working document towards draft CPM text for WRC-19 agenda item 1.5 � Brazil (Federative Republic of) AI1.5 2018-06-25
[ 739 ]
Comments on Annex 17 to Working Party 4A Chairman's Report - Studies relating to the bringing into use of frequency assignments for all non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services � Iran (Islamic Republic of) 2018-06-25
[ 738 ]
Comments on Annex 33 to Working Party 4A Chairman's Report - Preliminary draft CPM text or WRC-19 agenda item 7 - Issue A � Iran (Islamic Republic of) AI7 2018-06-25
[ 737 ]
Criteria for the protection of fixed and broadcasting satellite services in studies under WRC-19 agenda items 1.13, 1.14 and 1.16 � United Arab Emirates AI1.16, AI1.14, AI1.13 2018-06-25
[ 736 ]
Proposed changes to example ESIM Resolution of Annex 29 Document 4A/675 Working Party 4A Chairman's Report - Working document toward draft CPM text for WRC-19 agenda item 1.5 � Australia AI1.5 2018-06-25
[ 735 ]
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A � Indonesia (Republic of) AI7 2018-06-25
[ 734 ]
Proposed modifications on working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.3 � Indonesia (Republic of) AI9.1 2018-06-25
[ 733 ]
Modifications to preliminary draft CPM text for WRC-19 agenda item 7 - Issue C (Issue C4) � Korea (Republic of) AI7 2018-06-25
[ 732 ]
Modifications to preliminary draft CPM text for WRC-19 agenda item 7 - Issue C (Issue C7) � Korea (Republic of) AI7 2018-06-25
[ 731 ]
Modifications to working document towards draft CPM text for WRC-19 agenda item 7 - Issue M � Korea (Republic of) AI7 2018-06-25
[ 730 ]
Modifications to working document towards draft CPM text for WRC-19 agenda item 7 - Issue N � Korea (Republic of) AI7 2018-06-25
[ 729 ]
Proposed modification to working document towards draft CPM text for WRC-19 agenda item 1.5 � Korea (Republic of) , New Zealand AI1.5 2018-06-25
[ 728 ]
Proposals for modification of preliminary draft CPM text for WRC-19 agenda item 7 - Issue H � Russian Federation AI7 2018-06-22
[ 727 ]
Compatibility studies between FSS in the 51.4-52.4 GHz band (Earth-to-space) and EESS (passive) in the 52.6-53 GHz band � Russian Federation AI19.1 2018-06-22
[ 726 ]
Proposals on WRC-19 agenda item 1.4 in relation draft CPM text � Russian Federation AI1.4 2018-06-22
[ 725 ]
Proposed revisions to the working document towards preliminary draft CPM text for WRC-19 agenda item 1.6 � Russian Federation AI1.6 2018-06-22
[ 724 ]
Proposed amendments to example Resolution [AI 1.5/XXX] for WRC-19 agenda item 1.5 � Russian Federation AI1.5 2018-06-22
[ 723 ]
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Radio Regulations � WP 1A 2018-06-21
[ 722 ]
Liaison statement to CISPR and ITU-T Study Group 5 on EMC standards and limits (copy to ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further Reports of Disturbances to Radiocommunication systems � WP 1A 2018-06-21
[ 721 ]
Reply liaison statement to Working Party 7A (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 6B, 6C, 7B, 7C, and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" and UTC application in IMT systems � WP 5D 2018-06-21
[ 720 ]
Liaison statement to Working Party 4A (copy for information to Working Party 6A) - Draft CPM text for agenda item 9.1, issue 9.1.2 � WP 5D 2018-06-21
[ 719 ]
Liaison statement to Working Parties 1C, 4A, 4B, 7C and 7D - Countering interference from broadcasting-satellite receiving equipment into EESS (passive) remote sensors � WP 1A 2018-06-21
[ 718 ]
Liaison statement to Working Party 4A (copy for information to Working Parties 4C and 7C) - Comments on "Guidelines for reporting harmful interference to GSO satellite networks" � WP 1C 2018-06-21
[ 717 ]
Review of draft CPM text on WRC-19 agenda item 1.4 � Papua New Guinea AI1.4 2018-06-20
[ 716 ]
Discussion on the limit for provisional entry in the Region 1 and 3 lists of Appendixes 30 and 30A related to WRC-19 agenda item 7 - Issue G, Method B � Bulgaria (Republic of) AI7 2018-06-19
Resultados :915 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2019-10-18