Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP7D : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-R�WP7D� C�

UIT-R�WP7D

Radioastronom�a

Resultados :183 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 33 ]
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B, 7C and 7D (copy to Working Parties 3M and 6B for information) - WRC-15 Agenda item 1.6 � WP 4A 2012-10-05
[ 32 ]
+Ann.1-6
Report on the September 2012 meeting of Working Party 7D - (Manta, Ecuador 24-28 September 2012) � Chairman, WP 7D 2012-09-28
[ 31 ]
Final List of Participants - Working Party 7D (Manta, Ecuador, 24-28 September 2012) � Director, BR 2012-09-27
[ 30 ]
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 Agenda item 1.10 � WP 4C 2012-09-18
[ 29 ]
Working document towards a preliminary draft new Recommendation on the measurement of data loss � Netherlands (Kingdom of the) 2012-09-15
[ 28 ]
Analysis of the impact of unwanted emissions of EESS SAR opersating at 9 GHz into radioastronomy stations operating in the bend 10.6-10.7 GHz � Germany (Federal Republic of) , Committee on Radio Astronomy Frequencies , France 2012-09-14
[ 27 ]
Proposed modifications to working document towards a preliminary draft new Report ITU-R S.[R1.FSS] � Russian Federation 2012-09-14
[ 26 ]
Draft revision of Recommendation ITU-R RA.1417 - A radio-quiet zone in the vicinity of the L2 Sun-Earth Lagrance point � Japan 147/7 2012-09-14
[ 25 ]
Allocation of the band 77.5-78 GHz to the radiolocation service to support automotive short-range high-resolution radar operations WRC-15 Agenda item 1.18 � Germany (Federal Republic of) 2012-09-13
[ 24 ]
Document for information - Protection of radio astronomy observatories in the 76-81 GHz band from atmospheric attenuation and ring-fencing � Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science 2012-09-11
[ 23 ]
Working document toward a preliminary draft new Report - Measurements of 78-79 GHz automotive radar emissions received by a Radio Astronomy Observatory � Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science 2012-09-11
[ 22 ]
Report of RAG activities � Chairman, SG 7 2012-09-07
[ 21 ]
(Rev.1)
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and Joint Task Group 4-5-6-7 - Handbook on ITU-R propagation prediction methods for interference and sharing studies � WP 3M 2012-06-29
[ 20 ]
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS) � WPs 1A and 1B 2012-06-25
[ 19 ]
Liaison statement to CISPR and ITU-R Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - A database for the protection of radio services � WP 1A 2012-06-19
[ 18 ]
Liaison statement to ITU-R WPs 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (copy to ITU-R WP 3L and to ITU-T SGs 5, 9 and 15 for information and/or action if any) - Developments on coexistence of wired telecommunication (including PLT) and radiocommunication systems � WP 1A 2012-06-19
[ 17 ]
Liaison statement to Study Groups 3, 4, 5, 7 and relevant Working Parties - Active services operating above 275 GHz � SG 1 2012-06-15
[ 16 ]
Liaison statement to Working Parties 4C, 5A, 7B, and 7D (copy to Working Parties 3M and 6B for information) - WRC-15 Agenda item 1.6 � WP 4A 2012-06-11
[ 15 ]
Liaison statement to ITU-R WPs 3K, 3M, 4A, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and the International Maritime Organization (IMO) and International Association of Marine AIDS to Navigation and Lighthouse Authorities (IALA) - World Radiocommunication Conference (WRC-15) Agenda item 1.15 � WP 5B 2012-06-06
[ 14 ]
Liaison statement to relevant Working Parties of Study Group 5 on further studies on cognitive radio systems (CRS) (copy for information to relevant Working Parties of Study Groups 1, 4, 6 and 7) � WP 5A 2012-06-05
[ 13 ]
Liaison statement to Working Parties 5B, 5C and 5D (copy to Working Parties 1B, 4A, 4B, 4C, 6A, 7B, 7C, 7D for information) - Preparations for WRC-15 Agenda item 1.3 in response to decisions of CPM15-1 � WP 5A 2012-06-05
[ 12 ]
Liaison statement to ITU-R Working Parties 1B, 7B, 7C and 7D - WRC-15 Agenda item 1.18 � WP 5B 2012-06-01
[ 11 ]
Recommendations ITU-R F.1245-2 and ITU-R F.1336-3 to be brought to the attention of Study Groups 4 and 7 � SG 5 2012-06-01
[ 10 ]
Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (copy to Working Party 1A, Working Party 3K, Working Party 3M, Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5C, Working Party 5D and Working Party 7C for information) � WP 5B 2012-06-01
[ 9 ]
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D (Copy to Working Parties 4B and 3M for information) - WRC-15 Agenda item 1.10 � WP 4C 2012-05-28
[ 8 ]
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D (Copy to Working Parties 4B and 3M for information) - WRC-15 Agenda item 1.10 � WP 4C 2012-05-28
[ 7 ]
Report to be brought to the attention of Study Groups 4 and 7 � SG 5 2012-05-09
[ 6 ]
Question to be brought to the attention of Study Groups 4, 5, 6 and 7 � SG 1 2012-05-09
[ 5 ]
Study Group 5 Question ITU-R 212-4/5 to be brought to the attention of Study Groups 1, 4 and 7 � BR Study Groups Department 2012-04-24
[ 4 ]
Recommendation ITU-R F.758-5 to be brought to the attention of Study Groups 4, 6 and 7 � SG 5 2012-04-24
[ 3 ]
Questions ITU-R 1-5/5 and 252/5 to be brought to the attention of Study Groups 1, 4, 6 and 7 � SG 5 2012-04-24
[ 2 ]
Liaison statement to Study Groups 4, 5, 6 and 7, and Working Parties 4A, 4B, 4C, 5A, 5B, 5C 5D, 6A, 7B, 7C and 7D - Preparations for WRC-15 Agenda items 1.1 and 1.2 in response to decisions of CPM15-1 � Chairman, JTG 4-5-6-7 2012-03-26
[ 1 ]
Documents to be carried over from the 2007-2011 study period � WP 7D 2012-01-26
Resultados :183 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2015-10-23