Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP5C : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-R�WP5C� C�

UIT-R�WP5C

Sistemas fijos inal�mbricos; sistemas por ondas decam�tricas y otros sistemas por debajo de 30 MHz en los servicios fijo y m�vil terrestre

Resultados :437 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 287 ]
Proposed revision of working document towards preliminary draft new Recommendation ITU-R F.[FS DEPLOY] - Deployment scenarios of point-to-point systems in the fixed service � Japan 252/5 2014-05-12
[ 286 ]
Working document toward a preliminary draft new Report ITU-R F.[FS USE-TRENDS] � Viet Nam (Socialist Republic of) 2014-05-12
[ 285 ]
Report on the Correspondence Group on fixed service use and future trends - Fixed service use and future trends � Chairman, CG FS-trends 2014-05-12
[ 284 ]
Comments for inclusion in a liaison statement to Working Party 4A regarding WRC-15 agenda item 1.8 � United States of America 2014-05-09
[ 283 ]
Proposed draft reply liaison statement to Working Party 5B WRC-15 agenda item 1.17 � United States of America 2014-05-09
[ 282 ]
Proposed revisions to working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] � United States of America 2014-05-09
[ 281 ]
Proposed revisions to preliminary draft new Report ITU-R F.[FS USE-TRENDS], "Fixed service use and future trends" � United States of America 2014-05-09
[ 280 ]
Statistical information on point-to-point fixed service deployment in Poland � Orange Polska S.A. , Poland (Republic of) 2014-05-09
[ 279 ]
Progress Report of Joint Correspondence Group Activity � Chairman, JCG 5A/5C 2014-05-08
[ 278 ]
Review of the Study Group 5 Questions assigned to the Working Parties � Chairman, SG 5 2014-05-08
[ 277 ]
Studies on WRC-15 agenda item 1.16 in particular a compatibility with fixed service for which 160 MHz band is allocated on a primary basis � Russian Federation 2014-05-08
[ 276 ]
Preliminary draft revision Report ITU-R F.2108 - "Fixed service system parameters for different frequency bands" � Russian Federation 2014-05-08
[ 275 ]
Proposed supplement towards Handbook on frequency-adaptive communication systems and networks in the MF/HF bands � China (People's Republic of) 2014-05-07
[ 274 ]
Guidance on studies related to fixed point-to-point wireless systems used in packet-based networks � Canada 2014-05-06
[ 273 ]
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5C, 5D, ITU-T Study Group 15 Question 1 and ITU-T Study Group 13 Question 15 - Access technology for broadband telecommunications including IMT, for developing countries � ITU-D SG 2 2014-04-29
[ 272 ]
Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan � ITU-T SG 15 2014-04-22
[ 271 ]
Liaison statement on considerations on wired telecommunication systems being developed under G.fast � ITU-T SG 15 2014-04-22
[ 270 ]
Liaison statement on development of a draft new Report ITU-R F.[FS.IMT/BB] � ITU-T SG 15 2014-04-17
[ 269 ]
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4B, 4C, 5A, 5C and 5D) - Development of draft new Recommendation on main functionalities of consumer receivers for worldwide broadcasting roaming � WP 6A 2014-04-11
[ 268 ]
Liaison statement to Working Party 1A - Copy to Working Parties 1C, 5A, 5B, 5C and ITU-T Study Group 5 - Recommendations ITU-T K.60 and K.mhn - Coexistence of wired and wireless communication systems � WP 6A 2014-04-10
[ 267 ]
Liaison statement to Working Party 5A (copy for information to Working Parties 5C and 5D) - The use of mobile broadband networks for Electronic news gathering (ENG) applications in the mobile service � WP 6A 2014-04-10
[ 266 ]
Liaison statement on fixed service backhaul networks for IMT and other terrestrial mobile broadband systems � ITU-T SG 13 2014-04-07
[ 265 ]
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10 � WP 4C 2014-03-24
[ 264 ]
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5B, 5C and 7B - WRC-15 agenda item 1.9.2 � WP 4C 2014-03-24
[ 263 ]
Liaison statement to Working Party 5C - Studies to assist coordination between RDSS and MSS and the fixed service in the 2 483.5-2 500 MHz band � WP 4C 2014-03-07
[ 262 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 5A and 7B for information) WRC-15 agenda item 1.9.1 � WP 4A 2014-03-07
[ 261 ]
Liaison statement to Working Party 5C - WRC-15 agenda item 1.8 � WP 4A 2014-03-07
[ 260 ]
Liaison statement to Working Party 5C - WRC-15 agenda item 1.6 � WP 4A 2014-03-07
[ 259 ]
Liaison Statement/r on the ITU-T G.fast physical layer specification (ITU-T G.9701) (reply to ITU-R liaison statement 21) � ITU-T SG 15 2014-03-03
[ 258 ]
Liaison statement to ITU-T Study Group 13 Question 15/13, ITU-R Working Parties 5C and 4B - Work Progress on development of Handbook on Global Trends in IMT- ITU-R [IMT.HANDBOOK] � WP 5D 2014-02-28
[ 257 ]
Liaison statement to Working Party 1B (copy to Working Parties 5A, 5B and 5C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities � WP 5D 2014-02-25
[ 256 ]
Liaison statement to Working Party 5C - Architecture and Topology of IMT Networks � WP 5D 2014-02-25
[ 255 ]
Liaison statement to ITU-T FG Innovation, TSAG and Study Group 17 (copy for information to ITU-R Study Group 5, Working Parties 5A, 5B and 5C) - New standardization activities for the International Telecommunication Union - Standardization Sector (ITU-T) � WP 5D 2014-02-25
[ 254 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 agenda item 9.1, issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station � WP 1B 2014-01-30
[ 253 ]
Recommendation ITU-R SA.1155-1 - Protection criteria related to the operation of data relay satellite systems � SG 7 2014-01-21
[ 252 ]
Recommendation ITU-R SA.1626-1 - Feasibility of sharing between the space research service (space-to-Earth) and the fixed and mobile service in the band 14.8-15.35 GHz � SG 7 2014-01-21
[ 251 ]
Recommendations ITU-R SA.1275-4 and ITU-R SA.1276-4 � SG 7 2014-01-21
[ 250 ]
Liaison statement on coexistence of wired telecommunications with radiocommunication systems � ITU-T SG 5 2014-01-21
[ 249 ]
Liaison statement on coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ) � ITU-T SG 9 2014-01-07
[ 248 ]
Liaison statement on coexistence of wired telecommunications with radiocommunication systems � ITU-T SG 9 2014-01-06
[ 247 ]
Liaison statement - Studies for WRC-15 agenda item 1.17 in the frequency band 4 200-4 400 MHz � WP 5B 2013-12-20
[ 246 ]
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz � WP 5B 2013-12-20
[ 245 ]
Proposal for a new Question on fixed point-to-point wireless system used in packet-based network � China (People's Republic of) 2013-11-15
[ 244 ]
Reply liaison statement to ITU-R Working Party 5A on PDR Recommendation ITU-R M.2003 and Report ITU-R M.2227 for Multi Gigabit Wireless systems (MGWS) in 60 GHz range � European Telecommunications Standards Institute 2013-11-13
[ 243 ]
Reply liaison statement to ITU-R Working Party 5C on PD Report ITU-R F.[FS USE-TRENDS] on fixed service use and future trends � European Telecommunications Standards Institute 2013-11-13
[ 242 ]
Reply liaison statement to Working Party 5C (copy to Working Party 5D and ITU-T Study Groups 13 and 15) - Development of a draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial mobile broadband systems � WP 5A 2013-12-06
[ 241 ]
Liaison statement to Working Parties 5B and 5C (copy for information to Working Party 3L) - WRC-15 agenda item 1.4 - Status of studies and draft CPM text for WRC-15 agenda item 1.4 � WP 5A 2013-12-06
[ 240 ]
Liaison statement to ITU-R Working Party 1A and ITU-T Study Groups 5, 9 & 15 for action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5C, 5D, 6A, 7B, 7C and 7D for information) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendations ITU-T G.fast and ITU-T J.195 (J.HINOC-REQ) � WP 5B 2013-12-05
[ 239 ]
Liaison statement to Working Parties 5C, 5D and 6A - The use of mobile broadband networks for electronic news gathering (ENG) applications in the mobile service � WP 5A 2013-12-05
[ 238 ]
Liaison statement to Study Group 6 (copy to Working Parties 4A, 4B, 4C, 5A, 5C, 5D and 6A) - Development of Question ITU-R 136-2/6 on Worldwide broadcasting roaming � WP 5B 136-2/6 2013-12-03
Resultados :437 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2015-10-06