Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 107 ]
�
� |
Contribution to ITU-R Study Group 3 databank - Rain attenuation for the Mugnunghwa satellite link located in Daejeon, Korea
�
� |
Korea (Republic of)
� |
� |
2013-06-10 |
|
[ 106 ]
�
� |
Contribution to ITU-R Study Group 3 databanks - A new databank format for rain cell statistics
�
� |
Korea (Republic of)
� |
� |
2013-06-10 |
|
[ 105 ]
�
� |
Proposed modification of Recommendation ITU-R P.618 - A new approach for the effective path-length model for rain attenuation based on rain-cell characteristics
�
� |
Korea (Republic of)
� |
206-3/3, 201-4/3
� |
2013-06-10 |
|
[ 104 ]
�
� |
Contributions to ITU-R Study Group 3 databanks - Rain rate and slant-path attenuation from measurements in Gwangju, Korea
�
� |
Korea (Republic of)
� |
� |
2013-06-10 |
|
[ 103 ]
�
� |
Contribution to ITU-R Study Group 3 databanks - Modified statistics of rain rate and rain attenuation for terrestrial link at 73 GHz
�
� |
Korea (Republic of)
� |
204-4/3, 201-4/3
� |
2013-06-10 |
|
[ 102 ]
�
� |
Information document about the generation of correlated rain attenuation time series on multiple links - Multi-dimensional rain attenuation time series synthesizer for Earth-space diversity applications
�
� |
Greece
� |
� |
2013-06-10 |
|
[ 101 ]
�
� |
Proposal on inaccuracy elimination in calculations in Recommendation ITU-R P.452
�
� |
Russian Federation
� |
� |
2013-06-10 |
|
[ 100 ]
�
� |
Proposed modification to DBSG3 Table I.1: Terrestrial line-of-sight rain attenuation statistics
�
� |
Brazil (Federative Republic of)
� |
204-3/3
� |
2013-06-08 |
|
[ 99 ]
�
� |
Information document - Influence of wind direction on rain attenuation in terrestrial links
�
� |
Brazil (Federative Republic of)
� |
204-3/3
� |
2013-06-08 |
|
[ 98 ]
�
� |
Supporting document for improvement of rain attenuation prediction method in Recommendation ITU-R P.618-10 - More analysis on anomalies observed in the Earth-Space rain attenuation prediction models
�
� |
China (People's Republic of)
� |
� |
2013-06-08 |
|
[ 97 ]
�
� |
Proposed modification to Recommendation ITU-R P.618-10 - Propagation data and prediction methods required for the design of Earth-space telecommunication systems
�
� |
China (People's Republic of)
� |
� |
2013-06-08 |
|
[ 96 ]
�
� |
Proposed modification to Recommendation ITU-R P.530-14 - Propagation data and prediction methods required for the design of terrestrial line-of-sight systems
�
� |
China (People's Republic of)
� |
� |
2013-06-08 |
|
[ 95 ]
�
� |
Singularities in the Recommendation ITU-R P.530-14 path-adjustment factor
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2013-06-07 |
|
[ 94 ]
�
� |
Draft revision of Recommendation ITU-R P.2001 - A general purpose wide-range terrestrial propagation model in the frequency range 30 MHz to 50 GHz
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2013-06-07 |
|
[ 93 ]
�
� |
Observations made during the implementation of Recommendation ITU-R P.2001
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2013-06-07 |
|
[ 92 ]
�
� |
Global map issues
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2013-06-07 |
|
[ 91 ]
�
� |
Proposed revision to Recommendation ITU-R P. 617-2 - Propagation prediction techniques and data required for the design of trans-horizon radio-relay systems
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2013-06-07 |
|
[ 90 ]
�
� |
Proposed additions to ITU-R Study Group 3 databanks in Part II - Earth Space path data
�
� |
France
� |
� |
2013-06-07 |
|
[ 89 ]
�
� |
Proposed revision of the frequency scaling prediction method in Recommendation ITU-R P.618-10 - Step-by-step prediction method of the instantaneous frequency scaling of rain attenuation
�
� |
France
,
European Space Agency (ESA)
,
Italy
� |
� |
2013-06-07 |
|
[ 88 ]
�
� |
Proposed amendment to Recommendation ITU-R P.530-14 - Subrefactive model, Figure 2
�
� |
Australia
� |
� |
2013-06-07 |
|
[ 87 ]
�
� |
Terrain standard deviation in Recommendation ITU-R P.530-14 - Worldwide table for bilinear interpolation
�
� |
Australia
� |
� |
2013-06-07 |
|
[ 86 ]
�
� |
Proposed revision of Recommendations ITU-R P.452, P.526, P.1812 and P.2001 - Deriving the smooth-Earth surface
�
� |
Australia
� |
� |
2013-06-07 |
|
[ 85 ]
�
� |
Proposal of new world maps of atmospheric refractivity and of vertical gradient of refractivity
�
� |
Czech Republic
,
European Space Agency (ESA)
� |
� |
2013-06-04 |
|
[ 84 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 Agenda item 1.1
�
� |
WP 5A
� |
� |
2013-06-04 |
|
[ 83 ]
�
� |
Draft revision of Recommendation ITU-R P.452 - Prediction procedure for the evaluation of interference between stations on the surface of the Earth at frequencies above about 0.1 GHz
�
� |
United States of America
� |
� |
2013-06-03 |
|
[ 82 ]
�
� |
Proposed modifications to Recommendations ITU-R P.526-12 and ITU-R P.2001-0 - Clarification and correction
�
� |
Czech Republic
,
European Space Agency (ESA)
� |
� |
2013-06-04 |
|
[ 81 ]
�
� |
Proposed modification to Recommendation ITU-R P.311-13 - Testing method for comparing diffraction loss calculation models
�
� |
Czech Republic
,
European Space Agency (ESA)
� |
� |
2013-06-04 |
|
[ 80 ]
�
� |
Draft revision of Recommendation ITU-R P.618-10 - Propagation data and prediction methods required for the design of Earth-space telecommunication systems
�
� |
United States of America
� |
206/3
� |
2013-06-03 |
|
[ 79 ]
�
� |
Proposed modifications to Recommendation ITU-R P.452-14 - Hydrometeor-scatter interference prediction methodology - correction and clarification
�
� |
Czech Republic
,
European Space Agency (ESA)
� |
� |
2013-06-04 |
|
[ 78 ]
�
� |
Report on the work of Correspondence Group 3K3M-9
�
� |
United States of America
� |
233/3
� |
2013-06-03 |
|
[ 77 ]
�
� |
Microsoft(R) Excel implementation of the diffraction portion of Recommendation ITU-R P.452-14
�
� |
United States of America
� |
� |
2013-06-03 |
|
[ 76 ]
�
� |
Rain rate data for Medina Township, Ohio (United States)
�
� |
United States of America
� |
� |
2013-06-03 |
|
[ 75 ]
�
� |
Liaison statement to Working Parties 3J, 3K and 3M - Propagation models for planning and interference assessment involving fixed service links in bands above 50 GHz
�
� |
WP 5C
� |
� |
2013-06-04 |
|
[ 74 ]
�
� |
Liaison statement to ITU-R Working Party 3M - WRC-15 Agenda item 1.5
�
� |
WP 5B
� |
� |
2013-06-04 |
|
[ 73 ]
�
� |
Contribution to the SG 3 propagation measurements database
�
� |
Netherlands (Kingdom of the)
� |
205/3
� |
2013-06-03 |
|
[ 72 ]
�
� |
Liaison statement to Working Party 3M (copy to Working Party 5B) - Guidance on the application of propagation Recommendations to unmanned aircraft systems (WRC-15 Agenda item 1.5)
�
� |
WP 4B
� |
� |
2013-05-06 |
|
[ 71 ]
�
(Rev.1)� |
Provisional assignment of the Study Group 3 texts to Working Parties 3J, 3K, 3L and 3M
�
� |
Chairman, SG 3
� |
� |
2013-05-02 |
|
[ 70 ]
�
� |
Liaison statement to Working Parties 3J and 3M - Backscattering coefficient used for compatibility studies between the Earth exploration-satellite service (active) around 9.6 GHz and the Earth exploration-satellite service (passive) in the frequency band 10.6-10.7 GHz
�
� |
WP 7C
� |
� |
2013-04-17 |
|
[ 69 ]
�
� |
Liaison statement to Working Party 3M - Suggested revisions to Recommendation ITU-R P.2001
�
� |
WP 7B
� |
� |
2013-04-15 |
|
[ 68 ]
�
� |
Liaison statement to JTG 4-5-6-7 (copy to Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5B, Working Party 5C, Working Party 6A, Working Party 7B, Working Party 7C, Working Party 7D, Working Party 1A, Working Party 3K, Working Party 3M)
�
� |
WP 5D
� |
� |
2013-02-18 |
|
[ 67 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, (WPs 1A, 3K, 3M)) - Suitable frequency ranges above 6 GHz
�
� |
WP 5D
� |
� |
2013-02-18 |
|
[ 66 ]
�
� |
Question ITU-R 210-3/1
�
� |
SG 1
� |
� |
2013-01-28 |
|
[ 65 ]
�
� |
Liaison statement to Working Party 3K (copy to Working Parties 3M, 6A, 5D and 5B for information) - Appropriate propagation information where a current Recommendation may not seem to be wholly applicable
�
� |
JTG 4-5-6-7
� |
� |
2012-11-30 |
|
[ 64 ]
�
� |
Liaison statement to ITU-R Working Party 4A (copy to Working Parties 3M and 7B for information) - WRC-15 Agenda item 1.9 issue 1.9.1
�
� |
WP 5A
� |
� |
2012-11-20 |
|
[ 63 ]
�
� |
Liaison statement to ITU-R Working Party 3M - WRC-15 Agenda item 1.5
�
� |
WP 5B
� |
� |
2012-11-20 |
|
[ 62 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1
�
� |
WP 5A
� |
� |
2012-11-16 |
|
[ 61 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1
�
� |
WP 5A
� |
� |
2012-11-16 |
|
[ 60 ]
�
� |
Liaison statement to Working Party 5B (copy for information to Working Parties 1B, 3M, 5C, 7B, 7D) - Information on amateur service systems at 77.5-78 GHz for use in sharing studies for WRC-15 Agenda item 1.18
�
� |
WP 5A
� |
� |
2012-11-12 |
|
[ 59 ]
�
(Rev.1)� |
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems
�
� |
WP 5B
� |
� |
2012-11-09 |
|
[ 58 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)
�
� |
WP 5B
� |
� |
2012-11-09 |
Resultados :257 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):