Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 273 ]
�
� |
Note from Study Group 6 to the RAG - Proposal for revision to the working guidelines and/or Resolution 1 - Use of the modal verb "Must" and qualification of the definitions of specific terms in ITU-R Recommendations
�
� |
WP 6C
� |
� |
2010-10-25 |
|
[ 272 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R BS.1770-1 - Algorithms to measure audio programme loudness and true-peak audio level
�
� |
WP 6C
� |
2/6
� |
2010-10-25 |
|
[ 271 ]
�
� |
Draft new Report on accessibility to broadcasting services for persons with disabilities
�
� |
WP 6C
� |
� |
2010-10-25 |
|
[ 270 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R BT.601-6 - Studio encoding parameters of digital television for standard 4:3 and wide-screen 16:9 aspect ratios
�
� |
WP 6C
� |
� |
2010-10-25 |
|
[ 269 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R BT.[SDTVRR] - Objective perceptual video quality measurement techniques for standard definition digital broadcast television in the presence of a reduced reference
�
� |
WP 6C
� |
� |
2010-10-25 |
|
[ 268 ]
�
� |
Editorial revision of Recommendation ITU-R BS.1864 - Operational practices for loudness in the international exchange of digital television programmes
�
� |
WP 6C
� |
58/6
� |
2010-10-25 |
|
[ 267 ]
�
� |
Draft revision of Question ITU-R 40-1/6 - Extremely high-resolution imagery
�
� |
WP 6C
� |
45-1/6
� |
2010-10-25 |
|
[ 266 ]
�
� |
Editorial revision of Recommendation ITU-R BT.1380-1 - Standards for bit rate reduction coding systems for SDTV
�
� |
WP 6B
� |
� |
2010-10-25 |
|
[ 265 ]
�
� |
Editorial revision of Recommendation ITU-R BT.1203-1 - User requirements for generic video bit-rate reduction coding of digital TV signals for an end-to-end television system
�
� |
WP 6B
� |
� |
2010-10-25 |
|
[ 264 ]
�
� |
Proposed suppression of Recommendation ITU-R BT.1117-2 - Studio format parameters for enhanced 16:9 aspect ratio 625-line television systems (D- and D2-MAC, PALplus, enhanced SECAM)
�
� |
WP 6C
� |
� |
2010-10-22 |
|
[ 263 ]
�
� |
Draft revision of Question ITU-R BT. 128/6 - Digital three-dimensional (3D) TV broadcasting
�
� |
WP 6C
� |
� |
2010-10-22 |
|
[ 262 ]
�
� |
Developments at Working Party 1A (21-28 June 2010) concerning power line high data rate telecommunication systems and co-operation between ITU-R and ITU-T (Question ITU-R 221/1)
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2010-10-11 |
|
[ 261 ]
�
� |
Proposed review of Recommendations and Reports within the purview of Study Group 6
�
� |
Australia
� |
� |
2010-10-07 |
|
[ 260 ]
�
� |
Proposal for a framework for studies on 3D/stereoscopic TV within ITU-R Study Group 6
�
� |
Australia
� |
128/6, 125/6
� |
2010-10-07 |
|
[ 259 ]
�
� |
Relating to the work of Joint Task Group 5-6
�
� |
Chairman, SG 6
� |
� |
2010-08-26 |
|
[ 258 ]
�
� |
Liaison statement to Study Groups 4, 5, 6 and 7 and interested Working Parties - Protection of radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment
�
� |
WP 1A
� |
� |
2010-07-22 |
|
[ 257 ]
�
� |
Editorial revision of Recommendation ITU-R BT.1363-1 - Jitter specifications and methods for jitter measurements of bit-serial signals conforming to Recommendations ITU-R BT.656, ITU-R BT.799 and ITU-R BT.1120
�
� |
WP 6B
� |
� |
2010-05-21 |
|
[ 256 ]
�
� |
Draft revision of Report ITU-R BT.2143-1 - Boundary coverage assessment of digital terrestrial television broadcasting signals
�
� |
WP 6A
� |
4-2/6, 31-1/6
� |
2010-05-21 |
|
[ 255 ]
�
� |
Draft revision to Report ITU-R BT.2142 - The effect of the scattering of digital television signals from a wind turbine
�
� |
WP 6A
� |
69-1/6
� |
2010-05-21 |
|
[ 254 ]
�
� |
Draft revision of Recommendation ITU-R BT.1301 - Data services in digital television broadcasting
�
� |
WP 6B
� |
45-2/6
� |
2010-05-20 |
|
[ 253 ]
�
� |
Draft revision of Question ITU-R 126/6 - Recommended operating practices to tailor television programme material to broadcasting applications at various image quality levels, display sizes and aspect ratios
�
� |
WP 6B
� |
� |
2010-05-20 |
|
[ 252 ]
�
� |
Editorial changes to the Reports ITU-R BS.1203 and ITU-R BT.2140-1
�
� |
WP 6A
� |
� |
2010-05-20 |
|
[ 251 ]
�
� |
Suppression of Recommendation ITU-R BT.1197
�
� |
WP 6A
� |
� |
2010-05-20 |
|
[ 250 ]
�
� |
Proposed suppression of Recommendation ITU-R BT.801-1 - Test signals for digitally encoded colour television signals conforming with Recommendations ITU-R BT.601 (Part A) and ITU-R BT.656
�
� |
WP 6B
� |
� |
2010-05-20 |
|
[ 249 ]
�
� |
Editorial revision of Recommendation ITU-R BT.1577 - Serial digital interface-based transport interface for compressed television signals in networked television production based on Recommendation ITU-R BT.1120
�
� |
WP 6B
� |
130/6
� |
2010-05-20 |
|
[ 248 ]
�
� |
Draft new Recommendation ITU-R [WINTURB] - Assessment of impairment caused to digital television reception by a wind turbine
�
� |
WP 6A
� |
69-1/6
� |
2010-05-20 |
|
[ 247 ]
�
� |
Draft revision to Recommendation ITU-R BS.1514-1 - System for digital sound broadcasting in the broadcasting bands below 30 MHz
�
� |
WP 6A
� |
60/6
� |
2010-05-20 |
|
[ 246 ]
�
� |
Liaison statement to ITU-R Study Groups 5 and 6 - Completion of the work of Joint Task Group 5-6
�
� |
Chairman, JTG 5-6
� |
� |
2010-05-19 |
|
[ 245 ]
�
� |
Liaison statement to Study Group 6 (copy to Working Party 4B) - Proposed definitions for "Integrated MSS system" and "Hybrid satellite/terrestrial system"
�
� |
Chairman, CCV
� |
� |
2010-05-13 |
|
[ 244 ]
�
� |
Liaison statement to Working Party 1A (copy to relevant Working Parties of Study Groups 4, 5, 6, 7 and copy to ITU-T Study Groups 9 and 15 for information) - Further work on power line telecommunications
�
� |
WP 6A
� |
� |
2010-05-05 |
|
[ 243 ]
�
� |
Liaison statement to Study Group 6 (copy to Working Parties 6A, 6B and 6C) - Revision of Recommendation ITU-R BO.789-2
�
� |
WP 4B
� |
23/6
� |
2010-04-13 |
|
[ 242 ]
�
� |
Report on cooperation between ITU-R and ITU-T on power line high data rate telecommunication systems
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2010-04-13 |
|
[ 241 ]
�
� |
Liaison statement to Study Group 6 and Working Party 6A with copy to Working Party 4B for information - Response to comments on the proposed treatment of Recommendations of former Working Party 6S
�
� |
WP 4A
� |
� |
2010-04-13 |
|
[ 240 ]
�
� |
Conduct of business of the Study Groups
�
� |
Italy
� |
� |
2010-04-12 |
|
[ 239 ]
�
� |
Recent developments in first generation 3D TV broadcasting
�
� |
European Broadcasting Union (EBU)
� |
128/6
� |
2010-04-12 |
|
[ 238 ]
�
� |
Disability-aware baseband systems for media (DAM) broadcasting
�
� |
Chairman, WP 6C
� |
� |
2010-04-07 |
|
[ 237 ]
�
(Rev.1)� |
Status of texts
�
� |
BR, Study Group Department
� |
� |
2010-04-06 |
|
[ 236 ]
�
� |
Proposal to formalize provisions for the use of the modal verb "Must" and for the inclusion of definitions of terms on Recommendations of Study Group 6
�
� |
Italy
� |
� |
2010-03-26 |
|
[ 235 ]
�
� |
Liaison statement to Study Group 6 and Working Party 4A - Response to comments on the proposed treatment of Recommendations of former Working Party 6S
�
� |
WP 4B
� |
� |
2010-03-25 |
|
[ 234 ]
�
� |
ITU-T G.9960 collaboration to address power line communication signal power
�
� |
ITU-T SG 15
� |
� |
2010-03-05 |
|
[ 233 ]
�
� |
Proposal to add a number of broadcasting terms, acronyms and definitions in the ITU terminology database
�
� |
SG 6 Rapporteur to the CCV
� |
� |
2010-02-26 |
|
[ 232 ]
�
� |
Liaison statement to the relevant Working Parties of Study Groups 4, 5, 6 and 7 (copy to ITU-T Study Group 15 for information) - Further work on power line telecommunications
�
� |
WP 1A
� |
221-1/1
� |
2010-02-18 |
|
[ 231 ]
�
� |
Invitation to contribute to CWG-WCIT12
�
� |
Director, BR
� |
� |
2010-02-16 |
|
[ 230 ]
�
� |
Response to liaison from ITU-R Study Group 6 Working Party 6A on PLT EMC Aspects
�
� |
ITU-T SG 15
� |
� |
2009-12-02 |
|
[ 229 ]
�
� |
Views on the schedule and work of JTG 5-6
�
� |
France
� |
� |
2009-11-30 |
|
[ 228 ]
�
� |
Study Group 6 Summary Record (Meeting: 16-17/11/09)
�
� |
Chairman, SG 6
� |
� |
2009-11-18 |
|
[ 227 ]
�
� |
Final List of Participants - Study Group 6 (Geneva, 16-17 November 2009)
�
� |
Director, BR
� |
� |
2009-11-17 |
|
[ 226 ]
�
� |
Executive Report of the meeting of Working Party 6B, 9-13 November 2009
�
� |
Chairman, WP 6B
� |
� |
2009-11-16 |
|
[ 225 ]
�
� |
Executive Report of the meeting of Working Party 6A, Geneva, 4-12 November 2009
�
� |
Chairman, WP 6A
� |
� |
2009-11-16 |
|
[ 224 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2009-11-13 |
Resultados :423 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):