Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2123 ]
�
� |
Proposed new work item on in-service eOTDR devices and subsystems
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q6/15
� |
2020-08-24 |
|
[ 2122 ]
�
� |
Proposed G.988 updates for WiFi service (revision)
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2020-08-24 |
|
[ 2121 ]
�
(Rev.1)� |
BER and LOF/LOM filtering issues in FlexE
�
� |
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q11/15
� |
2020-08-24 |
|
[ 2120 ]
�
� |
MTNP APS message
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q11/15
� |
2020-08-24 |
|
[ 2119 ]
�
(Rev.1)� |
MTNS TTI insertion period
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q11/15
� |
2020-08-24 |
|
[ 2118 ]
�
(Rev.1)� |
MTN Protection Switching Architecture
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q12/15, Q11/15
� |
2020-08-24 |
|
[ 2117 ]
�
� |
MTN Linear Protection - Network Objectives
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q11/15
� |
2020-08-24 |
|
[ 2116 ]
�
� |
Document withdrawn
�
� |
N/A
� |
� |
2020-08-24 |
|
[ 2115 ]
�
� |
Clarification and text proposal for section 7.3 of the latest draft G.mtn
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q11/15
� |
2020-08-24 |
|
[ 2114 ]
�
� |
Comments on G.7701 Amd2
�
� |
ZTE Corporation (China)
� |
Q12/15
� |
2020-08-24 |
|
[ 2113 ]
�
� |
FEF configuration information for an SNP
�
� |
ZTE Corporation (China)
� |
Q12/15
� |
2020-08-24 |
|
[ 2112 ]
�
� |
Components structure in client context and server context
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q14/15, Q12/15
� |
2020-08-24 |
|
[ 2111 ]
�
� |
Transport network requirements from ML overlay
�
� |
ZTE Corporation (China)
� |
Q14/15, Q12/15
� |
2020-08-24 |
|
[ 2110 ]
�
(Rev.1)� |
Considerations of OSU protection
�
� |
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q11/15
� |
2020-08-24 |
|
[ 2109 ]
�
� |
Modifications of G.7701 Amd.2
�
� |
ZTE Corporation (China)
� |
Q12/15
� |
2020-08-24 |
|
[ 2108 ]
�
� |
Proposal about the extension of channels for 200G/400G applications
�
� |
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q6/15
� |
2020-08-24 |
|
[ 2107 ]
�
� |
50G PMD specification proposal in G.9806
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2020-08-24 |
|
[ 2106 ]
�
� |
Comments and thoughts on the G.9806Am1 50G PMD specification
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2020-08-24 |
|
[ 2105 ]
�
� |
Domain number range expansion [G.8275.1]
�
� |
China Unicom
� |
Q13/15
� |
2020-08-24 |
|
[ 2104 ]
�
� |
Considerations on MTN Section TTI
�
� |
ZTE Corporation (China)
� |
Q11/15
� |
2020-08-24 |
|
[ 2103 ]
�
� |
Analysis on MTN Path OAM
�
� |
ZTE Corporation (China)
� |
Q11/15
� |
2020-08-24 |
|
[ 2102 ]
�
(Rev.1)� |
Proactive AI/ML Cases and their Impact on Management and Control
�
� |
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q14/15, Q12/15
� |
2020-08-24 |
|
[ 2101 ]
�
� |
Proposals for addressing the editor's notes in G.7701 Amd.2
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Corporation
� |
Q12/15
� |
2020-08-24 |
|
[ 2100 ]
�
� |
Consideration and skeleton proposal for MTN equipment functional blocks
�
� |
ZTE Corporation (China)
� |
Q11/15
� |
2020-08-24 |
|
[ 2099 ]
�
(Rev.1)� |
Considerations on the usage of term 'control plane' and 'data/transport plane'
�
� |
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q14/15, Q12/15
� |
2020-08-24 |
|
[ 2098 ]
�
� |
Consideration of timing architecture for CTI and CO-DBA
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
Q2/15
� |
2020-08-24 |
|
[ 2097 ]
�
� |
G.8275.1/G.8275.2: Time error monitor
�
� |
Huawei Technologies Co., Ltd. (China)
,
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Orange (France)
� |
Q13/15
� |
2020-08-24 |
|
[ 2096 ]
�
� |
G.8273.2: Time Error metrics
�
� |
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q13/15
� |
2020-08-24 |
|
[ 2095 ]
�
� |
G.781: Datasets of physical layer synchronization
�
� |
Huawei Technologies Co., Ltd. (China)
,
China Unicom
� |
Q13/15
� |
2020-08-24 |
|
[ 2094 ]
�
� |
G.8273.2: Relative Time Error
�
� |
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
� |
Q13/15
� |
2020-08-24 |
|
[ 2093 ]
�
� |
G.Sup68: PTP-unaware detection
�
� |
Huawei Technologies Co., Ltd. (China)
,
China Unicom
� |
Q13/15
� |
2020-08-24 |
|
[ 2092 ]
�
� |
Proposal to start WDM-PON series of specifications with draft Annex A forms
�
� |
Calix Networks, Inc. (United States)
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center (United States)
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
,
Orange (France)
,
Telecom Italia S.p.A. (Italy)
,
Vodafone Group Services Ltd (United Kingdom)
,
ZTE Corporation (China)
� |
Q2/15
� |
2020-08-24 |
|
[ 2091 ]
�
� |
Appendix III of G.8273.3
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2020-08-24 |
|
[ 2090 ]
�
� |
Appendix V of G.8273.2
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2020-08-24 |
|
[ 2089 ]
�
� |
G.781.1: PTP atomic models
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2020-08-24 |
|
[ 2088 ]
�
� |
G.8271.1: Clarification of Relative Time Error
�
� |
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
� |
Q13/15
� |
2020-08-24 |
|
[ 2087 ]
�
� |
G.8265.1/G.8275.1/G.8275.2: Timeout parameter of PTSF-lossSync
�
� |
Huawei Technologies Co., Ltd. (China)
,
China Mobile Communications Corporation
,
China Unicom
,
SK Telecom (Korea (Rep. of))
� |
Q13/15
� |
2020-08-24 |
|
[ 2086 ]
�
� |
G.8275.1/G.8275.2: Synchronization Uncertain used by BMC
�
� |
Huawei Technologies Co., Ltd. (China)
,
China Mobile Communications Corporation
,
China Unicom
� |
Q13/15
� |
2020-08-24 |
|
[ 2085 ]
�
(Rev.1)� |
G.8275.1: Packet Timing Signal Fail function
�
� |
Huawei Technologies Co., Ltd. (China)
,
China Mobile Communications Corporation
,
SK Telecom (Korea (Rep. of))
� |
Q13/15
� |
2020-08-24 |
|
[ 2084 ]
�
� |
G.8271: 1PPS measurement error
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2020-08-24 |
|
[ 2083 ]
�
� |
Overhead usage for OxUsec
�
� |
Microchip Technology Inc. (United States)
� |
Q11/15
� |
2020-08-24 |
|
[ 2082 ]
�
� |
Proposed outline draft for WDM PON Requirement document
�
� |
China Telecommunications Corporation
,
Orange (France)
,
ZTE Corporation (China)
� |
Q2/15
� |
2020-08-24 |
|
[ 2081 ]
�
� |
Text revision for G.hsp.ComTC Clause 12.1.5
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
� |
Q2/15
� |
2020-08-24 |
|
[ 2080 ]
�
� |
Text proposal of PSBd synchronization for channel bonding in G.hsp.comTC
�
� |
ZTE Corporation (China)
� |
Q2/15
� |
2020-08-24 |
|
[ 2079 ]
�
� |
G.9806Am1 Appendix II
�
� |
ZTE Corporation (China)
� |
Q2/15
� |
2020-08-24 |
|
[ 2078 ]
�
� |
Proposed types of nodes and skeleton of draft for L.ncip
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q16/15
� |
2020-08-24 |
|
[ 2077 ]
�
� |
Discussions on the new work items SDM and UHC
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
,
China Information Communication Technologies Group
,
Hengtong Optic-electric Co., Ltd. (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
� |
Q5/15, Q16/15
� |
2020-08-24 |
|
[ 2076 ]
�
� |
G.9806Am1 50G PMD Appendix
�
� |
ZTE Corporation (China)
� |
Q2/15
� |
2020-08-24 |
|
[ 2075 ]
�
� |
Performance evaluation criteria (Annex A) and test program (Annex B) for L.ncip
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q16/15
� |
2020-08-24 |
|
[ 2074 ]
�
� |
Flexible method of Alloc-ID reservation in G.hsp.comTC
�
� |
ZTE Corporation (China)
� |
Q2/15
� |
2020-08-24 |
Results:301 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):