International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�

ITU-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:2210 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 2063 ]
Evolution of G.hn: Inclusion of full duplex mechanism in G.hn evolution � Marvell Semiconductor Inc. Q18/15 2016-09-05
[ 2062 ]
G.hn: Contents of the MAP-D frame � Marvell Semiconductor Inc. Q18/15 2016-09-05
[ 2061 ]
G.fast: On robustness and recovery of G.fast link � Intel Corporation Q4/15 2016-09-05
[ 2060 ]
(Rev.1-3)
Calling for Fundamental Solution for Cascaded and Nested Protection of Multiple OTN Domains for Future OTN Network � China Unicom Q9/15 2016-09-05
[ 2059 ]
Solution for Avoiding Sympathetic Switching in ODUk SNC/S Protected Domains � China Unicom , Huawei Technologies Co., Ltd. Q9/15 2016-09-05
[ 2058 ]
G.fast: Comments on draft text of G.9701 Amendment 3 � Intel Corporation Q4/15 2016-09-05
[ 2057 ]
Proposal on new Recommendation "Optical fibre cables for in-home directly wall surface applications" � China Unicom , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation Q16/15 2016-09-05
[ 2056 ]
(Rev.1)
Propose to start the standardization of longitudinal compatibility of repeatered system � China Mobile Communications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) , Orange Q8/15 2016-09-05
[ 2055 ]
G.fast: G.fast Non-linear precoding simulation conditions: Imperfect Channel State Information (background) � Alcatel-Lucent International Q4/15 2016-09-05
[ 2054 ]
Proposal on new specifications of PRTC in G.8272 � China Unicom Q13/15 2016-09-05
[ 2053 ]
Requirement of define a detailed OSC frame format for use case of Open ROADM � China Unicom Q11/15 2016-09-05
[ 2052 ]
Requirement of clarify optical layer parameter for some new use cases � China Unicom Q9/15, Q6/15 2016-09-05
[ 2051 ]
Proposal on "position maintenance" work pattern of PRTC GNSS receiver � China Unicom Q13/15 2016-09-05
[ 2050 ]
1588 network performance monitoring mechanism � China Unicom Q13/15 2016-09-05
[ 2049 ]
G.fast: General framework of INM method � Broadcom Corporation , Intel Corporation Q4/15 2016-09-05
[ 2048 ]
Proposal for external ID tag detection of non-contact type ID tags on passive node elements � China Unicom Q16/15 2016-09-05
[ 2047 ]
Wavelength plan consideration of G.metro � China Unicom , ZTE Corporation Q6/15 2016-09-05
[ 2046 ]
Test results of G.654 terrestrial field trials in China Unicom � China Unicom Q5/15 2016-09-05
[ 2045 ]
Proposal to study OSNR related issues of beyond 100G physical interface � China Unicom , ZTE Corporation Q6/15 2016-09-05
[ 2044 ]
Proposal of communication channel from TEE to HEE in G.metro � China Unicom Q6/15 2016-09-05
[ 2043 ]
EVM related test results � China Unicom Q6/15 2016-09-05
[ 2042 ]
Leap second behaviour on PTP clocks [G.8265.1, G.8275.1, G8275.2] � Cisco Systems, Inc. Q13/15 2016-09-05
[ 2041 ]
Request for information about the SG15/Q6 working process and time schedule to address the application codes and use cases of operators, as well as their interoperability needs at 100G. � China Telecommunications Corporation , Orange Q6/15 2016-09-05
[ 2040 ]
(Rev.1)
PRIMEX (G.9904.1) for consent � STMicroelectronics Q15/15 2016-09-05
[ 2039 ]
G.Fast: Application reference model(s) for coax � ZTE Corporation Q4/15 2016-09-05
[ 2038 ]
G.Fast: Indication of QoS queues status for DTA control � ZTE Corporation Q4/15 2016-09-05
[ 2037 ]
G.Fast: Requirements for DTA capability Negotiation and environment confirmation in the initialization stage for operation on twisted-pair cables � ZTE Corporation Q4/15 2016-09-05
[ 2036 ]
G.Fast: Consideration for signalling mechanism of DTA updates � ZTE Corporation Q4/15 2016-09-05
[ 2035 ]
G.fast: Considerations on pre-coding of 212MHz profile � ZTE Corporation Q4/15 2016-09-05
[ 2034 ]
Proposal of maintenance of G.781 Option III � KDDI Corporation , Nippon Telegraph and Telephone Corporation (NTT) Q13/15 2016-09-05
[ 2033 ]
Proposal of frequency and time holdover alarms (Sync OAM) � Nippon Telegraph and Telephone Corporation (NTT) Q13/15 2016-09-05
[ 2032 ]
Proposal of monitoring methods for PTP backup path (Sync OAM) � Nippon Telegraph and Telephone Corporation (NTT) Q13/15 2016-09-05
[ 2031 ]
State relationship between "virtualised" view and "physical" view in G.7711 � Alcatel-Lucent Shanghai Bell Q14/15 2016-09-05
[ 2030 ]
Proposal of update for multi-layer control in Clause 7.3.2 of G.asdtn � Nippon Telegraph and Telephone Corporation (NTT) Q14/15, Q12/15 2016-09-05
[ 2029 ]
SDN DCN in G.7712 � FiberHome Technologies Group Q14/15, Q12/15 2016-09-05
[ 2028 ]
Modeling of media constructs and specification in G.7711 � FiberHome Technologies Group Q14/15 2016-09-05
[ 2027 ]
Consideration of assurance modeling in G.7711 � FiberHome Technologies Group Q14/15 2016-09-05
[ 2026 ]
Consideration of dedicated optical controller � FiberHome Technologies Group Q14/15, Q12/15 2016-09-05
[ 2025 ]
Contributed text for a recommendation on Reach Extenders for XGS-PON � Futurewei Technologies US R&D Center , Orange Q2/15 2016-09-05
[ 2024 ]
Proposal for revision of G.650.1 � Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT) Q5/15 2016-09-05
[ 2023 ]
G.fast: identifying and completing missing elements in the RPA procedure in G.9701 Corrigendum 3 � Sckipio Technologies S.I. Ltd. Q4/15 2016-09-05
[ 2022 ]
Consideration of similar concept of OTUkV frame structure for OTUC � Fujitsu Limited Q11/15 2016-09-05
[ 2021 ]
G.fast: identifying and completing missing elements in the FRA procedure in G.9701 Corrigendum 3 � Sckipio Technologies S.I. Ltd. Q4/15 2016-09-05
[ 2020 ]
Comment on clause 8.3.1 of draft G.cca � FiberHome Technologies Group Q12/15 2016-09-05
[ 2019 ]
Proposal of OTS media link definition of draft G.872v18 � FiberHome Technologies Group Q12/15 2016-09-05
[ 2018 ]
Consideration on Network Resource Slicing in G.asdtn � China Telecommunications Corporation , ETRI , Huawei Technologies Co., Ltd. Q14/15, Q12/15 2016-09-05
[ 2017 ]
G.vlc: Draft working text for the new G.vlc Recommendation � Huawei Technologies Co., Ltd. , China Academy of Telecommunication Research (CATR) , Marvell Semiconductor Inc. , Ministry of Industry and Information Technology (MIIT) Q18/15 2016-09-05
[ 2016 ]
Proposal of reference point specification clarification for optical line interfaces of G.692 � FiberHome Technologies Group Q6/15, Q12/15 2016-09-05
[ 2015 ]
Wavelength block filter in XG-PON ONU � Huawei Technologies Co., Ltd. Q2/15 2016-09-05
[ 2014 ]
The Spectral width parameter in XGS-PON � Huawei Technologies Co., Ltd. Q2/15 2016-09-05
Results:2210 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2016-09-28