Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 627 ]
�
� |
G.8263 Appendix I - Flicker/gamma equation formatting fixes
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 626 ]
�
� |
G8263 Appendix I - TDEV illustrating flicker load
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 625 ]
�
� |
Two-way metric Offset Max
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 624 ]
�
� |
Framework for Temperature Performance
�
� |
Microsemi
� |
Q13/15
� |
2014-03-10 |
|
[ 623 ]
�
(Rev.1)� |
1-stage and 2-stage Re-definition in ODU SMP
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-03-10 |
|
[ 622 ]
�
� |
Message Encoding Set Update for ODU SMP
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-03-10 |
|
[ 621 ]
�
� |
1-stage ODU SMP Protocol
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-03-10 |
|
[ 620 ]
�
(Rev.1)� |
APS Mechanisms in ODU SMP
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-03-10 |
|
[ 619 ]
�
� |
Proposed functional models in MDSP
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-03-10 |
|
[ 618 ]
�
� |
Interconnection solution for Ethernet linear protection in MDSP
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-03-10 |
|
[ 617 ]
�
� |
Discussion on the scope of potential G.metro Recommendation
�
� |
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2014-03-10 |
|
[ 616 ]
�
� |
Discussion on the minimum SMSR for 100G applications in G.698.2
�
� |
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2014-03-10 |
|
[ 615 ]
�
� |
Proposal of power budget update in G.973
�
� |
Huawei Technologies Co. Ltd.
� |
Q8/15
� |
2014-03-10 |
|
[ 614 ]
�
� |
G.hn: Proposal for seamless domain merging procedure
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/15
� |
2014-03-10 |
|
[ 613 ]
�
� |
G.hn: Proposal for handover procedure of SC function
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/15
� |
2014-03-10 |
|
[ 612 ]
�
� |
G.hn: Text proposal for SC re-establishment procedure in G.hn
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/15
� |
2014-03-10 |
|
[ 611 ]
�
� |
Spectral excursion for 100Gb/s DP-QPSK modulation format in G.698.2
�
� |
Alcatel-Lucent France
� |
Q6/15
� |
2014-03-10 |
|
[ 610 ]
�
� |
Draft New Recommendation G.8152: Protocol-neutral management information model for the MPLS-TP network element, version 0.08
�
� |
Deutsche Telekom AG
� |
Q14/15
� |
2014-03-10 |
|
[ 609 ]
�
� |
NE Phase/Time Synchronization Supply Management
�
� |
Deutsche Telekom AG
� |
Q14/15, Q13/15
� |
2014-03-10 |
|
[ 608 ]
�
� |
Comments to Recommendation G.8121 (11/2013)
�
� |
Deutsche Telekom AG
� |
Q14/15, Q10/15
� |
2014-03-10 |
|
[ 607 ]
�
� |
IPR statement.
�
� |
Sckipio Technologies S.I. Ltd.
� |
Q4/15
� |
2014-03-10 |
|
[ 606 ]
�
� |
Threshold Profile Management for OTN
�
� |
Deutsche Telekom AG
� |
Q14/15
� |
2014-03-10 |
|
[ 605 ]
�
� |
Proposed corrections to the performance management functions in G.874 Amd 2
�
� |
Deutsche Telekom AG
� |
Q14/15
� |
2014-03-10 |
|
[ 604 ]
�
� |
Considerations on control plane derived from G.8080 for G.ODUSMP
�
� |
China Unicom
� |
Q9/15
� |
2014-03-10 |
|
[ 603 ]
�
� |
Proposal on fundamental visor and virtualization in soft-defined transport network
�
� |
China Unicom
� |
Q14/15, Q12/15
� |
2014-03-10 |
|
[ 602 ]
�
� |
Reusing PON-ID as TWDM channel ID
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2014-03-10 |
|
[ 601 ]
�
� |
T-BC Performance with/without SyncE [G.8273.2]
�
� |
Vitesse Semiconductor Corporation
� |
Q13/15
� |
2014-03-10 |
|
[ 600 ]
�
� |
Comments to Feb 2014 Q2 interim document "D33_G.989.3-Tuning-States-20140218-VZ-ZTE-HIT-MIT-OKI-NTT_r2"
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2014-03-10 |
|
[ 599 ]
�
� |
G.8273.2: T-TSC Specification
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 598 ]
�
� |
G.8273.2: 1pps Performance Requirements
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 597 ]
�
� |
G.8273.2: Noise Generation
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 596 ]
�
� |
G.8273 Annex A Equations
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 595 ]
�
� |
G.8271.1: MTIE Limit for Dynamic Time Error
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 594 ]
�
� |
G.8262: Jitter for Multilane, 40G and 100G Interfaces
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 593 ]
�
� |
G.8260: Definitions of Dynamic Time Error and Maximum Time Error
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-03-10 |
|
[ 592 ]
�
� |
T-BC Time/phase noise generation [G.8273.2, G.8271.1]
�
� |
Vitesse Semiconductor Corporation
� |
Q13/15
� |
2014-03-10 |
|
[ 591 ]
�
� |
Proposal of a text of non-linear effects compensation in G.sup39
�
� |
Fujitsu Limited
� |
Q6/15
� |
2014-03-10 |
|
[ 590 ]
�
� |
Symbol Braided FEC for OTU4 & Beyond 100G Multi Vendor IaDI & Beyond 100G IrDI (Blacklink)
�
� |
Xilinx Incorporation
� |
Q6/15, Q11/15
� |
2014-03-10 |
|
[ 589 ]
�
� |
Proposed enhancements to G.671 and G.672 to accommodate flexible grid elements
�
� |
Finisar Corporation
� |
Q7/15
� |
2014-03-10 |
|
[ 588 ]
�
� |
G.hn: MPDU priority when including fragments of LLC frames
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2014-03-10 |
|
[ 587 ]
�
� |
Initial measurement data for the proposed 4L1-9D1F EML application code in G.959.1
�
� |
Finisar Corporation
� |
Q6/15
� |
2014-03-10 |
|
[ 586 ]
�
� |
Proposal for time synchronization requirements
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q2/15, Q13/15
� |
2014-03-10 |
|
[ 585 ]
�
� |
Considerations of Error decorrelator for 100G and beyond FEC
�
� |
Broadcom Corporation
,
ZTE Corporation
� |
Q11/15
� |
2014-03-10 |
|
[ 584 ]
�
� |
Proposal about SMSR parameter for advanced modulation formats in ITU-T G.698.2
�
� |
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q6/15
� |
2014-03-10 |
|
[ 583 ]
�
� |
Consideration about Spectral Excursion in G.698.2
�
� |
ZTE Corporation
,
Ministry of Industry and Information Technology (MIIT)
� |
Q6/15
� |
2014-03-10 |
|
[ 582 ]
�
� |
Proposal on B100G OTN mapping and multiplexing structure
�
� |
KDDI Corporation
� |
Q11/15
� |
2014-03-10 |
|
[ 581 ]
�
� |
Considerations about the EVM
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2014-03-10 |
|
[ 580 ]
�
� |
Consideration about a requirement for consistency of switching action in G.mdsp
�
� |
ZTE Corporation
� |
Q9/15
� |
2014-03-10 |
|
[ 579 ]
�
� |
A proposed protection mechanism for a failure use case in G.MDSP
�
� |
ZTE Corporation
� |
Q9/15
� |
2014-03-10 |
|
[ 578 ]
�
� |
G.fast: Comments on link-state transition
�
� |
ZTE Corporation
� |
Q4/15
� |
2014-03-10 |
Results:337 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):