International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Meeting�2013-07-01�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�(2013-07-01)�

ITU-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting� from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-192016-02-152015-06-222014-11-242014-03-242013-12-062013-02-01

Results:440 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 290 ]
(Rev.1)
Proposal to update Figure 9-1 of G.8021 � NEC Corporation Q14/15, Q10/15 2013-06-17
[ 289 ]
(Rev.1)
Proposed modification of PM terminologies in G.8021 � NEC Corporation Q10/15 2013-06-17
[ 288 ]
(Rev.1)
Proposed correction of MAC DA specification in G.8013 � NEC Corporation Q9/15, Q10/15 2013-06-17
[ 287 ]
(Rev.1)
Comments on the scope and some definitions of G.808.2 � NEC Corporation Q9/15 2013-06-17
[ 286 ]
G.fast: TDD-frame and super-frame structure working text � Sckipio Technologies S.I. Ltd. Q4/15 2013-06-17
[ 285 ]
G.cmsr: Interfacing with G.9903 � Panasonic Corporation Q15/15 2013-06-17
[ 284 ]
(Rev.1)
Q13/15 Synchronization Requirements Structure � Deutsche Telekom AG Q13/15 2013-06-17
[ 283 ]
G.hn: Update of G.9961 Amendment 2 to complete "Test Vectors" section � Marvell Semiconductor Inc. Q18/15 2013-06-17
[ 282 ]
WDM for Metro and Backhaul � AT&T, Inc. Q6/15 2013-06-17
[ 281 ]
(Rev.1)
Proposed revisions to ITU-T Recommendation G.652 � Corning Incorporated Q6/15, Q5/15, Q2/15 2013-06-17
[ 280 ]
G.fast: Scrambler working text � Lantiq Beteiligungs-GmbH & Co. KG , Sckipio Technologies S.I. Ltd. Q4/15 2013-06-17
[ 279 ]
OSNR and DGD tolerance investigation for 100G DP-QPSK optical signals � Telecom Italia S.p.A. Q6/15 2013-06-17
[ 278 ]
Beyond 100G OTN relationships to IEEE Standardization Schedule � Alcatel-Lucent USA Inc. Q11/15 2013-06-17
[ 277 ]
ODUflex hitless resizing beyond 100G � Alcatel-Lucent USA Inc. Q11/15 2013-06-17
[ 276 ]
Multi-vendor IaDI � Alcatel-Lucent USA Inc. Q11/15 2013-06-17
[ 275 ]
Re-arrangement times for G.8271.1 HRM topologies � Alcatel-Lucent USA Inc. , Huawei Technologies Co. Ltd. Q13/15 2013-06-17
[ 274 ]
Development of Slave Clock Specifications for Different Use Cases � Sprint Q13/15 2013-06-17
[ 273 ]
Timing for standardization of OTN beyond 100G � Alcatel-Lucent USA Inc. Q6/15, Q11/15 2013-06-17
[ 272 ]
(Rev.1)
Service Requirements for Manageable Synchronization Infrastructure � Alcatel-Lucent USA Inc. , Sprint Q13/15 2013-06-17
[ 271 ]
ODU SMP Signalling Options � Alcatel-Lucent USA Inc. Q9/15 2013-06-17
[ 270 ]
Unified ONU power management � ZTE Corporation Q2/15 2013-06-17
[ 269 ]
Availability/Outage times for ODUSMP � Alcatel-Lucent USA Inc. Q9/15 2013-06-17
[ 268 ]
Activation in TWDM-PON system � ZTE Corporation Q2/15 2013-06-17
[ 267 ]
Proposal for PLOAM messages for tuning function in NG-PON2 TC layer during normal operation � ZTE Corporation Q2/15 2013-06-17
[ 266 ]
Proposal to close the item 11 in G.987.3A2 living list with answer for "ANNEX" approach � China Mobile Communications Corporation , China Telecommunications Corporation , ZTE Corporation Q2/15 2013-06-17
[ 265 ]
G.inp: Extension of ADSL L2 Link State Operation for Retransmission � Adaptive Spectrum and Signal Alignment (ASSIA) Inc. Q4/15 2013-06-17
[ 264 ]
G.fast: Multi-Line PSD Mask Constraint � Adaptive Spectrum and Signal Alignment (ASSIA) Inc. Q4/15 2013-06-17
[ 263 ]
proposal for study on requirements for wavelength selective reflector in in-service fibre test system application � China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation Q17/15 2013-06-17
[ 262 ]
Proposal to include vibration and shock test in G.976 � Communication Line Products Association of Japan Q8/15 2013-06-17
[ 261 ]
G.fast: Non-Linear Precoder Ordering � Adaptive Spectrum and Signal Alignment (ASSIA) Inc. Q4/15 2013-06-17
[ 260 ]
A Communication framework for Smart Home � OKI Electric Industry Company Ltd. (OKI) Q15/15 2013-06-17
[ 259 ]
G.8271.1 Appendix VI modifications for cTE classes [G.8271.1] � Vitesse Semiconductor Corporation Q13/15 2013-06-17
[ 258 ]
PTP Equipment Classification [G.8273.2, G.8273, G.8271.1] � Cisco Systems, Inc. , Vitesse Semiconductor Corporation Q13/15 2013-06-17
[ 257 ]
Proposed text for removed G.8032 appendices (for agreement) � Nippon Telegraph and Telephone Corporation (NTT) Q9/15 2013-06-17
[ 256 ]
Scope and Table of Contents of the new Recommendation "Use of the global positioning system (GPS) to create a referenced network map" � SIRTI S.p.A. Q17/15 2013-06-17
[ 255 ]
OTUCn/ODUCn proposal after Q11/15's Feb 2013 meeting � China Telecommunications Corporation , Huawei Technologies Co. Ltd. Q11/15 2013-06-17
[ 254 ]
N*100G flexible bit rate OTUCn proposal � China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co. Ltd. , Infinera Corporation Q11/15 2013-06-17
[ 253 ]
Static noise generation of G.8273.2 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q13/15 2013-06-17
[ 252 ]
Delay_Req Transmission Requirements in G.8275.1 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange Q13/15 2013-06-17
[ 251 ]
Proposals for G.8275.1 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange Q13/15 2013-06-17
[ 250 ]
Proposal for default value for offsetScaledLogVariance, for G.8275.1 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange Q13/15 2013-06-17
[ 249 ]
Discussion of Noise Tolerance in G.8273.2 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange Q13/15 2013-06-17
[ 248 ]
Proposal for Time Noise Transfer in G.8273.2 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange Q13/15 2013-06-17
[ 247 ]
Proposed Text for Method 3 of G.8263-Testing � Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Nokia Siemens Networks GmbH & Co. KG , Orange Q13/15 2013-06-17
[ 246 ]
Proposed Correction to Annex C of ITU-T Rec. O.172 � Huawei Technologies Co. Ltd. Q13/15 2013-06-17
[ 245 ]
PLL bandwidth requirement for G.8261.1 network limit test � Huawei Technologies Co. Ltd. Q13/15 2013-06-17
[ 244 ]
Delay asymmetry test result using different traffic generation methods � Huawei Technologies Co. Ltd. Q13/15 2013-06-17
[ 243 ]
Proposals for Transient and Holdover Specifications for G.8273.2 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q13/15 2013-06-17
[ 242 ]
G.fast: DRA Timing Requirements � ADTRAN Q4/15 2013-06-17
[ 241 ]
The time noise generation of T-BC in G.8273.2 � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q13/15 2013-06-17
Results:440 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-26