International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2012-09-10�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG15� TD-WP1�(2012-09-10)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2012-09-10 to 2012-09-21

held in Switzerland [Geneva]

Other Meetings : [ 2012-09-10 ]� 2012-05-11� 2011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:165 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4
Temporary Documents �(WP1) ��Documents / Contributions

Number
Title Source AI/Question
Date
[ 686-WP1 ]
iLSL: Architecture aspects of G.fast � Broadband Forum Q4A/15 2012-03-23
[ 685-WP1 ]
oLS: Update on Smart Grid Activities in ITU, including power line communications � Rapporteur Q4c/15 Q4C/15 2012-03-20
[ 684-WP1 ]
iLS: Smart Grid related issues (representative and deliverables) � JCA-SG&HN Q4C/15, Q4B/15, Q4A/15, Q2/15, Q1/15 2012-03-19
[ 683-WP1 ]
iLS: IEEE 1901.2, ITU G.9955 March 12th update � IEEE 1901.2 Q4C/15 2012-03-16
[ 682-WP1 ]
oLS: Study status of G.epon after Huntsville meeting � Rapporteur Q2/15 Q2/15 2012-03-15
[ 681-WP1 ]
oLS: Liaison response to TTC on G.hnem � Rapporteur Q4c/15 Q4C/15 2012-03-15
[ 680-WP1 ]
oLS: Update on ITU-T activities in the area of NB-PLC and Smart Grid � Rapporteur Q4c/15 Q4C/15 2012-03-15
[ 679-WP1 ]
iLS: Access Network Transport � ITU-T SG17 Q1/15 2012-03-07
[ 678-WP1 ]
iLS: Response to ITU-T liaison letter dated 16 December 2011 � IEEE 1904.1 Q2/15 2012-03-07
[ 677-WP1 ]
iLS: Liaison to ITU-T on Reverse Powering � ATTM/TM6 Q4A/15 2012-03-06
[ 676-WP1 ]
iLS: Liaison to ITU-T on Support of SRA and Retransmission � ATTM/TM6 Q4A/15 2012-03-06
[ 675-WP1 ]
oLS: Study status of G.epon after Huntsville meeting (9 February 2012) � Rapporteur Q2/15 Q2/15 2012-03-02
[ 674-WP1 ]
iLS: Initiation of ONU Deployment Requirements for NG-PON Working Text (WT-288) � BBF Q2/15 2012-02-06
[ 673-WP1 ]
oLS: Consideration of Recommendation ITU-T G.9955 by IEEE P1901.2 � Rapporteur Q4c/15 Q4C/15 2012-02-01
[ 672-WP1 ]
iLS: Establishment of Liaison relationship for the purpose of draft exchange � TTC Q4C/15 2012-01-25
Results:165 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25