Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 284 ]
�
� |
Draft reply liaison statement to Working Party 4C - WRC-27 agenda item 1.12
�
� |
United States
� |
AI1.12
� |
2024-09-17 |
|
[ 283 ]
�
� |
WRC-27 agenda item 1.7 - Annex 3 (14.8-15.35 GHz)
�
� |
United States
� |
AI1.7
� |
2024-09-17 |
|
[ 282 ]
�
� |
Proposal on text of working document towards the preliminary draft new Report ITU-R M. [IMT-2030.TECH PERF REQ]
�
� |
ATIS Next G Alliance
� |
� |
2024-09-17 |
|
[ 281 ]
�
� |
Proposal on test environments for IMT-2030
�
� |
ATIS Next G Alliance
� |
� |
2024-09-17 |
|
[ 280 ]
�
� |
Suggested timeline for the collaborations between Working Parties 4C and 5D on preparatory studies for WRC-27 agenda item 1.13
�
� |
Chair, WP 4C and Acting Chair, WP 5D
� |
AI1.13
� |
2024-09-13 |
|
[ 279 ]
�
� |
Information on joint sessions between Working Parties 4C and 5D in October 2024 to facilitate the ITU-R preparatory studies for WRC-27 agenda item 1.13
�
� |
Chair, WP 4C and Acting Chair, WP 5D
� |
AI1.13
� |
2024-09-13 |
|
[ 278 ]
�
� |
Further information on updated material on "3GPP 5G-SRIT" and "3GPP 5G-RIT" for updating Recommendation ITU-R M.2150 to Revision 3
�
� |
Alliance for Telecommunications Industry Solutions
� |
� |
2024-09-11 |
|
[ 277 ]
�
� |
Further information on updated material on LTE-Advanced toward Revision 7 of Recommendation ITU-R M.2012
�
� |
Alliance for Telecommunications Industry Solutions
� |
� |
2024-09-11 |
|
[ 276 ]
�
� |
Liaison statement on Study Group 17 new work item TR.SA_RAN - Technical Report on "Security attacks in radio access networks"
�
� |
ITU-T SG17
� |
� |
2024-09-12 |
|
[ 275 ]
�
� |
Liaison statement on Study Group 17 new work item ITU-T TR.IMT-2030 SEC CON: "Security consideration for IMT2030 networks"
�
� |
ITU-T SG17
� |
� |
2024-09-12 |
|
[ 274 ]
�
� |
Liaison statement on Study Group 17 new work item ITU-T X.5GSEC-FMSC: Security requirements and guidelines for fixed, mobile and satellite convergence of IMT-2020 networks and beyond
�
� |
ITU-T SG17
� |
� |
2024-09-12 |
|
[ 273 ]
�
� |
Document withdrawn
�
� |
N/A
� |
� |
2024-09-11 |
|
[ 272 ]
�
� |
Liaison statement on initiation of two new Recommendations ITU-T Y.NGNE-CP_MOBILITY: "Mobility management and control framework in NGN evolution control plane" and ITU-T Y.NGNE-CP_NA: "Network attachment control framework in NGN evolution control plane"
�
� |
ITU-T SG13
� |
� |
2024-09-10 |
|
[ 271 ]
�
� |
Updates to the framework on sharing and compatibility studies under WRC-27 agenda item 1.7
�
� |
Brazil
� |
AI1.7
� |
2024-09-05 |
|
[ 270 ]
�
� |
Working document towards preliminary draft CPM text for WRC-27 agenda item 1.7
�
� |
Brazil
� |
AI1.7
� |
2024-09-05 |
|
[ 269 ]
�
� |
Reply liaison statement on Parameters for 7 125 to 8 400 MHz of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
�
� |
Director, BR
� |
� |
2024-09-05 |
|
[ 268 ]
�
� |
Consideration on matters related to adjacent frequency bands between WRC-27 agenda items 1.7 and 1.19
�
� |
Acting Chairs, WPs 5D and 7C
� |
AI1.7, AI1.19
� |
2024-09-03 |
|
[ 267 ]
�
� |
Consideration on the overlapping frequency band 7 190-7 235 MHz between WRC-27 agenda items 1.7 and 1.15
�
� |
Acting Chairs, WPs 5D and 7B
� |
AI1.7, AI1.15
� |
2024-09-02 |
|
[ 266 ]
�
� |
Proposed draft reply liaison statement to Coordination Committee for Terminology - Terms and definitions related to IMT-2020 (5G) technology
�
� |
Acting Chair and Vice Chairs of WP 5D
� |
� |
2024-09-02 |
|
[ 265 ]
�
� |
Liaison statement on consent of draft new Recommendation ITU-T Y.3215 (Ex.Y.FMSC-NS-REQ) - Fixed, mobile and satellite convergence - Requirements of network sharing for IMT-2020 networks and beyond
�
� |
ITU-T SG13
� |
� |
2024-08-26 |
|
[ 264 ]
�
� |
Liaison statement on consent of draft new Recommendation ITU-T Y.3214 (Ex.Y.FMSC-SFC) - Fixed, mobile and satellite convergence - Service function chain (SFC) for IMT-2020 networks and beyond
�
� |
ITU-T SG13
� |
� |
2024-08-26 |
|
[ 263 ]
�
� |
Liaison statement on consent of draft new Recommendation ITU-T Y.3213 (Ex.Y.FMSC-PC) - Fixed, mobile and satellite convergence - Policy control for IMT-2020 networks and beyond - For consent
�
� |
ITU-T SG13
� |
� |
2024-08-26 |
|
[ 262 ]
�
� |
Liaison statement on consent of draft new Recommendation ITU-T Y.3212 (Ex.Y.FMSC-HAP-REQ) - Fixed, mobile and satellite convergence - Requirements of supporting high altitude platform for IMT-2020 networks and beyond
�
� |
ITU-T SG13
� |
� |
2024-08-26 |
|
[ 261 ]
�
� |
Liaison statement on determination of draft new Recommendation ITU-T Y.3211 (Ex.Y.FMSC-ABC-REQ) - Fixed, mobile and satellite convergence - Requirements of supporting airborne broadband communication for IMT-2020 networks and beyond
�
� |
ITU-T SG13
� |
� |
2024-08-26 |
|
[ 260 ]
�
� |
Liaison statement on consent of draft new Recommendation ITU-T Y.3210 (Ex.Y.FMSC-DLT) - Fixed, mobile and satellite convergence - Distributed ledger technology for IMT-2020 networks and beyond
�
� |
ITU-T SG13
� |
� |
2024-08-26 |
|
[ 259 ]
�
� |
Liaison statement on consent of draft new Recommendation ITU-T Y.3209 (Ex.Y.FMSC-TS) - Fixed, mobile and satellite convergence - Traffic scheduling for IMT-2020 networks and beyond
�
� |
ITU-T SG13
� |
� |
2024-08-26 |
|
[ 258 ]
�
� |
Liaison statement on consent of draft new Recommendation ITU-T Y.3208 (Ex.Y.FMSC-SMSB) - Fixed, mobile and satellite convergence - Session management with satellite backhaul for IMT-2020 networks and beyond
�
� |
ITU-T SG13
� |
� |
2024-08-26 |
|
[ 257 ]
�
� |
Liaison statement to ITU-R Working Parties 5B and 5D - WRC-27 agenda item 1.7 - Proposed technical parameters and operating scenarios to consider in adjacent band studies involving radio altimeters and wireless avionics intra communications operating in the 4 200-4 400 MHz frequency band
�
� |
International Civil Aviation Organization
� |
AI1.7
� |
2024-08-22 |
|
[ 256 ]
�
� |
Liaison statement on consent of draft new Recommendation ITU-T Y.3144 (Ex.Y.IMT2020-DCN) - Future networks including IMT 2020 - Requirements and functional architecture of distributed core network
�
� |
ITU-T SG13
� |
� |
2024-08-23 |
|
[ 255 ]
�
� |
Liaison statement on consent of draft new Recommendation ITU-T Y.3216 (Ex.Y.FMSC-DCN) - Fixed, mobile and satellite convergence - Distributed core network for IMT-2020 networks and beyond
�
� |
ITU-T SG13
� |
� |
2024-08-23 |
|
[ 254 ]
�
(Rev.1)� |
Information of frequency assignments in the 4 500-4 800 MHz frequency band in accordance with RR Appendix 30B
�
� |
Director, BR
� |
� |
2024-08-16 |
|
[ 253 ]
�
� |
Preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.MS] and preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.BS]
�
� |
Director, BR
� |
� |
2024-08-14 |
|
[ 252 ]
�
� |
Necessary correction to Report ITU-R M.2039-3
�
� |
Acting Chair, WP 5D
� |
� |
2024-08-12 |
|
[ 251 ]
�
� |
Considerations on draft Recommendation ITU-T SG5 K.DMEI on EMC mitigation for IMT
�
� |
ATDI
� |
� |
2024-08-09 |
|
[ 250 ]
�
� |
Liaison Note to ITU-R Study Group 5
�
� |
International Association of Marine Aids to Navigation and Lighthouse Authorities
� |
� |
2024-06-28 |
|
[ 249 ]
�
� |
Liaison statement on the new version of the home network transport (HNT) standards overview and work plan
�
� |
ITU-T SG15
� |
� |
2024-07-19 |
|
[ 248 ]
�
� |
Liaison statement on the new version of the access network transport (ANT) standards overview and work plan
�
� |
ITU-T SG15
� |
� |
2024-07-19 |
|
[ 247 ]
�
� |
Cognitive radio spectrum access and resource management for re-configurable communication networks for future networks
�
� |
General Authority of communication and Informatics (Libya)
� |
� |
2024-07-18 |
|
[ 246 ]
�
� |
Information on the preparation of texts for the draft CPM Report to WRC-27
�
� |
Chair, CPM-27
� |
� |
2024-07-09 |
|
[ 245 ]
�
� |
Liaison statement on collaboration matters related to EMF
�
� |
ITU-T SG5
� |
� |
2024-07-09 |
|
[ 244 ]
�
� |
Liaison statement on overview of work of FG-AI4A
�
� |
FG-AI4A
� |
� |
2024-07-03 |
|
[ 243 ]
�
� |
Liaison statement on completion of FG-AI4A deliverables
�
� |
FG-AI4A
� |
� |
2024-07-03 |
|
[ 242 ]
�
+Ch.1-7� |
Report on the 46th meeting of Working Party 5D (Geneva, 25 June - 2 July 2024)
�
� |
Acting Chair, WP 5D
� |
� |
2024-07-02 |
|
[ 241 ]
�
� |
Final list of participants - Working Party 5D (Geneva, 25 June - 2 July 2024))
�
� |
Director, BR
� |
� |
2024-07-02 |
|
[ 240 ]
�
� |
Liaison statement to ITU-T Study Group 17 and ITU-R Working Parties 4B and 5D - Terms and definitions related to IMT-2020 (5G) technology
�
� |
CCT
� |
� |
2024-06-27 |
|
[ 239 ]
�
(Rev.1)� |
Update Report on CITEL PCC.II activities
�
� |
CITEL Rapporteur
� |
� |
2024-06-24 |
|
[ 238 ]
�
� |
Liaison statement on results of the seventh and final meeting of the FG-MV
�
� |
ITU-T FG-MV
� |
� |
2024-06-24 |
|
[ 237 ]
�
� |
Reply liaison statement to Working Party 7C (copy to Working Parties 4C, 5A, 5D and 7D for information) - Beam Wireless Power Transmission (WPT)
�
� |
WP 1A
� |
� |
2024-06-21 |
|
[ 236 ]
�
� |
Reply liaison statement to Working Party 4C (copy to Working Parties 5A, 5D, 7C and 7D for information) - Work of Working Party 1A on beam-Wireless Power
�
� |
WP 1A
� |
� |
2024-06-21 |
|
[ 235 ]
�
� |
Reply liaison statement to Working Party 7D (copy to Working Parties 4C, 5A, 5D and 7C for information) - Beam Wireless Power Transmission (WPT)
�
� |
WP 1A
� |
� |
2024-06-21 |
Results:434 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):