Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 761 ]
�
� |
Proposed updates to working document towards a preliminary draft revision of Recommendation ITU-R S.1503
�
� |
Germany (Federal Republic of)
� |
� |
2024-04-19 |
|
[ 760 ]
�
� |
Proposal of GSO protection in Region 1 for WRC-27 agenda item 1.4
�
� |
Germany (Federal Republic of)
� |
AI1.4
� |
2024-04-19 |
|
[ 759 ]
�
� |
Studies on possible revisions of sharing conditions in the frequency band 13.75-14 GHz to allow the use of uplink fixed-satellite service earth stations with smaller antenna sizes
�
� |
ITU-APT Foundation of India (IAFI)
� |
� |
2024-04-19 |
|
[ 758 ]
�
� |
Proposed new working document towards a preliminary draft new Recommendation ITU-R S.[NCMC ESIM] - The functionalities and implementation of a network control and monitoring centre for satellite earth stations in motion
�
� |
Germany (Federal Republic of)
,
Luxembourg
� |
� |
2024-04-19 |
|
[ 757 ]
�
� |
Perspective of the WRC-27 agenda item 1.6
�
� |
African Telecommunications Union
� |
AI1.6
� |
2024-04-19 |
|
[ 756 ]
�
� |
Proposal on prioritisation of work within Working Party 4A
�
� |
South Africa (Republic of)
,
Zimbabwe (Republic of)
� |
� |
2024-04-19 |
|
[ 755 ]
�
� |
GSOA position and proposals regarding studies under WRC-27 agenda item 1.2
�
� |
Global Satellite Operators' Association GSOA
� |
AI1.2
� |
2024-04-19 |
|
[ 754 ]
�
� |
Remarks with respect to on-going work to update Recommendation ITU-R S.1503
�
� |
Tonga (Kingdom of)
� |
� |
2024-04-19 |
|
[ 753 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO] - Studies on non-GSO-non-GSO sharing scenarios
�
� |
Tonga (Kingdom of)
� |
� |
2024-04-19 |
|
[ 752 ]
�
� |
Compatibility study of aeronautical earth stations in motion and stations in the fixed service
�
� |
France
� |
AI1.1
� |
2024-04-19 |
|
[ 751 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Accounting for all sidelobe contributions of non-GSO FSS satellites in Recommendation ITU-R S.1503
�
� |
France
� |
� |
2024-04-19 |
|
[ 750 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
�
� |
France
� |
� |
2024-04-19 |
|
[ 749 ]
�
� |
Proposed amendments to WPDNR on the maximum allowable aggregate interference levels from time-variant sources from other services into Fixed-Satellite Service links
�
� |
France
� |
� |
2024-04-19 |
|
[ 748 ]
�
� |
Existing and future development of systems under FSS in the frequency range 7 250 to 7 750 MHz and 7 900 to 8 400 MHz
�
� |
France
� |
AI1.7
� |
2024-04-19 |
|
[ 747 ]
�
� |
Preliminary draft new Recommendation ITU-R S.[RES 770] - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks in Q/V band with criteria contained in No. 22.5L of the Radio Regulations
�
� |
France
� |
� |
2024-04-19 |
|
[ 746 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING] - Modelling and simulation of non-GSO FSS systems for use in sharing and compatibility studies
�
� |
France
� |
� |
2024-04-19 |
|
[ 745 ]
�
� |
Proposed concepts to consider when revising the working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO]
�
� |
France
� |
� |
2024-04-19 |
|
[ 744 ]
�
� |
Proposed reply liaison statement to Working Party 7D FSS characteristics for WRC-27 agenda item 1.16
�
� |
France
� |
AI1.16
� |
2024-04-19 |
|
[ 743 ]
�
� |
Proposed reply liaison statement to Working Party 5D documenting FSS characteristics in the frequency range 7 125-8 400 MHz for sharing and compatibility studies under WRC-27 agenda item 1.7
�
� |
France
� |
AI1.7
� |
2024-04-19 |
|
[ 742 ]
�
� |
Proposed liaison statement to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B, 7C, 7D requesting characteristics for use in sharing studies under WRC-27 agenda item 1.1
�
� |
France
� |
AI1.1
� |
2024-04-19 |
|
[ 741 ]
�
� |
Initial elements related to the preparatory work for WRC-27 agenda item 1.2
�
� |
France
� |
AI1.2
� |
2024-04-19 |
|
[ 740 ]
�
� |
Working document towards a preliminary draft new Recommendation - Maximum permissible levels of off-axis e.i.r.p. density from non-axially symmetric or active phased array earth station antennas transmitting to geostationary-satellite orbit networks operating in the fixed-satellite service in the 27.5-30 GHz frequency band
�
� |
ViaSat, Inc.
� |
� |
2024-04-18 |
|
[ 739 ]
�
� |
Proposed elevation of working document towards a preliminary draft new Report to PDNR
�
� |
ViaSat, Inc.
� |
� |
2024-04-18 |
|
[ 738 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Underestimation of non-GSO interference arising from the use of Worst Case Geometry in S.1503 and necessity to supplement it with grid-based EPFD analysis
�
� |
ViaSat, Inc.
� |
� |
2024-04-18 |
|
[ 737 ]
�
� |
Additional elements in application of existing methodologies to compute and evaluate the aggregate interference from non-GSO FSS systems into GSO networks with respect to aggregate EPFD limits in Resolution 76 (Rev.WRC-23)
�
� |
ViaSat, Inc.
� |
� |
2024-04-18 |
|
[ 736 ]
�
� |
Proposed open-source software tool for determining conformity of non-GSO FSS systems with Article 22 EPFD limits
�
� |
ViaSat, Inc.
� |
� |
2024-04-18 |
|
[ 735 ]
�
� |
Proposed technical parameters for agenda item 1.3
�
� |
INTELSAT
� |
� |
2024-04-19 |
|
[ 734 ]
�
� |
Studies related to the working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO] - Modifications to the PDNR
�
� |
INTELSAT
� |
� |
2024-04-19 |
|
[ 733 ]
�
� |
Studies related to the working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO] - Studies 1 and 2
�
� |
INTELSAT
� |
� |
2024-04-19 |
|
[ 732 ]
�
� |
Studies related to the working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO] - GSO return links operations
�
� |
INTELSAT
� |
� |
2024-04-19 |
|
[ 731 ]
�
� |
Position and proposals regarding on the work on Recommendation ITU-R S.[MITIGATION MEASURES]
�
� |
Papua New Guinea
� |
� |
2024-04-19 |
|
[ 730 ]
�
� |
Proposed revisions to working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO]
�
� |
United States of America
� |
� |
2024-04-19 |
|
[ 729 ]
�
� |
Proposed updates to working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU] - Methodology for evaluating and technical procedures for addressing any exceedance of aggregate equivalent power flux-density into geostationary satellite networks in the fixed-satellite service from multiple non-geostationary satellite systems in the Ku and Ka...
�
� |
United States of America
� |
� |
2024-04-19 |
|
[ 728 ]
�
� |
Working document towards a preliminary draft new Report [ARTICLE 22 EPFD LIMIT STUDIES]
�
� |
United States of America
� |
� |
2024-04-19 |
|
[ 727 ]
�
� |
Preliminary draft new Recommendation ITU-R S.[ESIM NCMC] - The functionalities and implementation of a network control and monitoring center (NCMC) for Earth stations in motion
�
� |
United States of America
� |
� |
2024-04-19 |
|
[ 726 ]
�
� |
Suppression of Question 284/4
�
� |
United States of America
� |
� |
2024-04-19 |
|
[ 725 ]
�
� |
Proposed working document on WRC-27 agenda item 1.3
�
� |
Canada
� |
AI1.3
� |
2024-04-18 |
|
[ 724 ]
�
� |
Comparison of GSO protection limits in the Ka-Band
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 723 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[GSO PROTECTION FROM NGSO KA-BAND]
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 722 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S. [AGGREGATE EPFD KA KU] - Review of Methods for computing aggregate epfd
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 721 ]
�
� |
Submission of satellite system characteristics as per Recommends 4 of Recommendation ITU-R S.1328-4 - Satellite system characteristics to be considered in frequency sharing analyses within the fixed-satellite service
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 720 ]
�
� |
Elements for a working document towards a preliminary draft new Handbook [NGSO_BEST_PRACTICES]
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 719 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[NGSO DEORBITING] - Guidance on safe and efficient deorbit and/or disposal strategies and methodologies for non-GSO space stations involved in radiocommunication services after the end of their life
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 718 ]
�
� |
Calculation of epfd statistics at geometries other than the worst-case geometry
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 717 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 716 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO] - Calculation method to assess the impact on link performance due to inter-system interference when an assignment to a non-geostationary FSS satellite system is involved
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 715 ]
�
� |
Analysis of the protection provided by Article 22 epfd limits to GSO FSS networks and potential constraints to non-GSO FSS system in the 10.7-12.75 GHz band
�
� |
Canada
� |
� |
2024-04-18 |
|
[ 714 ]
�
� |
Representative system characteristics of an FSS geostationary network in the 40/50 GHz bands for studies related to WRC-27 agenda item 1.1
�
� |
EchoStar Operating LLC
� |
AI1.1
� |
2024-04-18 |
|
[ 713 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Modifications to ITU-R S.1503 to accurately model downlink of NGSO sys-tems using steerable beams
�
� |
Galaxy Space (Beijing) Technology Co.,Ltd.
� |
� |
2024-04-18 |
|
[ 712 ]
�
� |
Proposed working document on WRC-27 agenda item 1.2
�
� |
Ghana
,
Nigeria (Federal Republic of)
� |
AI1.2
� |
2024-04-18 |
Results:911 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):