Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 266 ]
�
� |
Liaison statement to Working Parties 4B, 4C, 5A, 5C, 7B and 7C - Studies relating to the use of the frequency bands 17.7-19.7 GHz (space-to-Earth) and 27.5-29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service under WRC-19 agenda item 1.5
�
� |
WP 4A
� |
AI1.5
� |
2018-03-21 |
|
[ 265 ]
�
� |
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Draft documents including draft CPM text related to WRC-19 agenda item 1.6, Resolution 159 (WRC-15)
�
� |
WP 4A
� |
AI1.6
� |
2018-03-21 |
|
[ 264 ]
�
� |
Liaison statement to Working Parties 4C, 5A, 7B and 7C - Studies relating to the bringing into use of frequency assignments to all non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services
�
� |
WP 4A
� |
� |
2018-03-21 |
|
[ 263 ]
�
� |
Recommendation ITU-R F.699-8 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to 86 GHz
�
� |
SG 5
� |
� |
2018-03-06 |
|
[ 262 ]
�
� |
Liaison statement on ITU inter-Sector coordination
�
� |
ITU-T (TSAG)
� |
� |
2018-03-05 |
|
[ 261 ]
�
� |
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� regarding FSS/MSS/BSS
�
� |
WP 4B
� |
� |
2018-02-23 |
|
[ 260 ]
�
� |
Liaison statement to Working Party 4B (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding FSS/BSS
�
� |
WP 4A
� |
� |
2018-02-20 |
|
[ 259 ]
�
� |
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7C) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding RNSS systems
�
� |
WP 4C
� |
� |
2018-02-20 |
|
[ 258 ]
�
� |
Liaison Statement to Working Party 1A (Copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448
and Appendix 7 (Rev.WRC-15) of the Radio Regulations
�
� |
WP 4C
� |
� |
2018-02-19 |
|
[ 257 ]
�
� |
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 7B) - Simplified regulatory regime for non-GSO satellites with short duration missions
�
� |
WP 4C
� |
� |
2018-02-19 |
|
[ 256 ]
�
� |
Note from Chairman of Working Party 4C to the Director, Radiocommunication Bureau (copy for information to RAG and Working Parties 4A, 4B, 5A, 7B, 7C) - Cost recovery for non-GSO satellite systems
�
� |
Chairman, WP 4C
� |
� |
2018-02-16 |
|
[ 255 ]
�
� |
Reply liaison statement to ITU-R Working Party 5C (copied for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - WRC-19 agenda item 1.14
�
� |
WP 5D
� |
� |
2018-02-12 |
|
[ 254 ]
�
� |
Cost recovery for non-GSO satellite systems
�
� |
Director, BR
� |
� |
2018-01-08 |
|
[ 253 ]
�
� |
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 252 ]
�
� |
Liaison statement to Working Party 7B - Draft revisions of Recommendations ITU-R F.1249-4 and ITU-R F.1509-3
�
� |
WP 5C
� |
� |
2017-11-22 |
|
[ 251 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (and copy to Working Parties 3M and 5B for information) - WRC-19 agenda item 1.14
�
� |
WP 5C
� |
AI1.14
� |
2017-11-22 |
|
[ 250 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, Task Group 5/1, 6A, 7B, 7C and 7D - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
�
� |
WP 5B
� |
� |
2017-11-22 |
|
[ 249 ]
�
� |
Reply liaison statement to Working Party 4A (copied to Working Parties 4C and 7B) - Simplified regulatory regime for non-GSO satellites with short duration missions
�
� |
WP 5A
� |
� |
2017-11-21 |
|
[ 248 ]
�
� |
Reply liaison statement to Working Party 7B regarding WRC-19 agenda item 1.3
�
� |
WP 5C
� |
AI1.3
� |
2017-11-21 |
|
[ 247 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5C, 5D, 6A, 7C, 7B, 7D and 3M - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15)
�
� |
WP 5B
� |
AI1.10
� |
2017-11-20 |
|
[ 246 ]
�
� |
Liaison statement to Working Party 7B regarding WRC-19 agenda item 1.3
�
� |
WP 5B
� |
AI1.3
� |
2017-11-20 |
|
[ 245 ]
�
� |
Liaison statement to Working Parties 4A, 4C and 7B - Draft documents including draft CPM text related to WRC-19 agenda item 9.1 issue 9.1.4 - ITU-R Resolution 763 (WRC-15)
�
� |
WP 5B
� |
AI9.1
� |
2017-11-20 |
|
[ 244 ]
�
� |
Liaison statement to Working Parties 4C, 5A, 7B and 7C - WRC-19 agenda item 7, issues H and I: Additional RR Appendix 4 data elements for non-GSO systems
�
� |
WP 4A
� |
AI7
� |
2017-11-02 |
|
[ 243 ]
�
� |
Liaison statement to Working Parties 4C, 5A, 7B and 7C - Studies relating to the bringing into use of frequency assignments, and consideration of a milestone-based deployment approach for non-GSO satellite systems
�
� |
WP 4A
� |
� |
2017-11-02 |
|
[ 242 ]
�
� |
Reply liaison statement to Task Group 5/1 (copy to WPs 4C, 5B, 7B and 7C for information) - Reply to request for additional information on parameters in support of sharing and compatibility studies with IMT-2020
�
� |
WP 4A
� |
� |
2017-11-01 |
|
[ 241 ]
�
� |
Reply liaison statement to Task Group 5/1 (copy to Working Parties 4C, 5B, 7B and 7C for information) - Reply to request for additional information on parameters in support of sharing and compatibility studies with IMT-2020
�
� |
WP 4A
� |
� |
2017-11-01 |
|
[ 240 ]
�
� |
Liaison statement to Working Parties 4C, 5A, and 7B - Simplified regulatory regime for non-GSO satellites with short duration missions
�
� |
WP 4A
� |
� |
2017-11-01 |
|
[ 239 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems�
�
� |
WP 7A
� |
� |
2017-11-01 |
|
[ 238 ]
�
+Ann.1-18� |
Report on the meeting of Working Party 7B (Geneva, 25-31 October 2017)
�
� |
Chairman, WP 7B
� |
� |
2017-11-01 |
|
[ 237 ]
�
� |
Final List of participants Working Party 7B (Geneva, 25-31 October 2017)
�
� |
Director, BR
� |
� |
2017-10-31 |
|
[ 236 ]
�
� |
List of documents issued (Documents 7B/168 - 7B/236)
�
� |
BR Study Groups Department
� |
� |
2017-10-24 |
|
[ 235 ]
�
� |
Liaison statement to Working Party 7B (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7
�
� |
WP 6A
� |
AI1.7
� |
2017-10-24 |
|
[ 234 ]
�
� |
Liaison statement to Working Party 7B regarding WRC-19 agenda item 1.3
�
� |
WP 6A
� |
AI1.3
� |
2017-10-24 |
|
[ 233 ]
�
� |
Compatibility analysis between MetAids and SOS in the 403-406 MHz under agenda item 1.7
�
� |
World Meteorological Organfization
� |
AI1.7
� |
2017-10-18 |
|
[ 232 ]
�
� |
Proposed amendments to draft CPM text on agenda item 1.7
�
� |
United Kingdom of Great Britain and Northern Ireland
,
Netherlands (Kingdom of the)
� |
AI1.7
� |
2017-10-18 |
|
[ 231 ]
�
� |
Compatibility studies between incumbent services and possible new allocations for the space operation service under WRC-19 AI 1.7
�
� |
United Kingdom of Great Britain and Northern Ireland
,
Netherlands (Kingdom of the)
� |
AI1.7
� |
2017-10-18 |
|
[ 230 ]
�
� |
Proposed modification to preliminary draft new Report ITU-R SA.[460 MHZ METSAT-EESS] - Studies related to proposed change in 460-470 secondary allocation for METSAT to primary and addition of primary allocation to EESS
�
� |
Japan
� |
AI1.3
� |
2017-10-18 |
|
[ 229 ]
�
� |
Proposed modification to preliminary draft new Report ITU-R SA.[400 MHz-LIMITS] - To consider establishing in-band power limits for earth stations operating in the frequency ranges 399.9-400.05 MHz and 401-403 MHz within the MSS, EESS and MetSat services
�
� |
Japan
� |
AI1.2
� |
2017-10-18 |
|
[ 228 ]
�
� |
Prelimimary draft new Report ITU-R SA.[400 MHZ-LIMITS] - To consider establishing in-band power limits for earth stations operating in the frecuency ranges 399.9-400.05 MHz and 401-403 MHz within the MSS, EESS and MetSat services
�
� |
Netherlands (Kingdom of the)
� |
AI1.2
� |
2017-10-17 |
|
[ 227 ]
�
� |
Amendments to the preliminary draft new Report ITU-R SA.[460 MHZ METSAT-EESS] - Studies related to proposed change in 460-470 MHz secondary allocation for METSAT to primary and addition of primary allocation to EESS
�
� |
Germany (Federal Republic of)
� |
AI1.3
� |
2017-10-17 |
|
[ 226 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - SHARING STUDIES] - Studies on the suitability of existing allocations to the space operation service below 1 GHz and additional sharing studies on possible new and/or upgraded allocations
�
� |
France
� |
AI1.7
� |
2017-10-17 |
|
[ 225 ]
�
� |
Proposed revision of Annex 5 to Working Party 7B Chairman's Report - Draft CPM text on WRC-19 agenda item 1.7
�
� |
France
� |
AI1.7
� |
2017-10-17 |
|
[ 224 ]
�
� |
Proposed revision of Annex 19 to Working Party 7B Chairman's Report - Preliminary draft new Report ITU-R SA.[460 MHZ METSAT-EESS] - Studies related to proposed change in 460-470 MHz secondary allocation for METSAT to primary and addition of primary allocation to EESS
�
� |
France
� |
AI1.3
� |
2017-10-17 |
|
[ 223 ]
�
� |
Proposed revision to Annex 3 to Working Party 7B Chairman's Report - Draft CPM text on WRC-19 agenda item 1.3 - Agenda item 1.3
�
� |
France
� |
AI1.3
� |
2017-10-17 |
|
[ 222 ]
�
� |
Proposed liaison statement to Working Party 6A - Draft liaison statement to Working Party 6A regarding WRC-19 agenda item 1.3
�
� |
France
� |
AI1.3
� |
2017-10-17 |
|
[ 221 ]
�
� |
Compatibility study between METSAT/EESS services and mobile service in the band 460-470 MHz
�
� |
France
� |
� |
2017-10-17 |
|
[ 220 ]
�
� |
Proposed revision of Annex 18 to Working Party 7B Chairman's Report - Preliminary draft new Report ITU-R SA.[400 MHz-LIMITS] - To consider establishing in-band power limits for earth stations operating in the frequency ranges 399.9-400.5 MHz and 401-403 MHz within the MSS, EESS and MetSat services
�
� |
France
� |
AI1.2
� |
2017-10-17 |
|
[ 219 ]
�
� |
Proposed revision to Annex 1 to Working Party 7B Chairman's Report - Draft CPM text on WRC-19 agenda item 1.2 - Agenda item 1.2
�
� |
France
� |
AI1.2
� |
2017-10-17 |
|
[ 218 ]
�
� |
Compatibility study between a potential upgrading allocation of METSAT/EESS services and fixe services in the band 460-470 MHz
�
� |
France
,
Germany (Federal Republic of)
� |
AI1.3
� |
2017-10-17 |
|
[ 217 ]
�
� |
Compatibility studies with the land mobile service in the frequency band 150.05 - 174 MHz on WRC-19 agenda item 1.7
�
� |
Russian Federation
� |
AI1.7
� |
2017-10-17 |
Results:416 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):