International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP6A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP6A� C�

ITU-R�WP6A

Terrestrial Broadcasting Delivery

Results:589 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 439 ]
Studies on the performance of MF AM sound broadcasting receivers in the presence of interference from WPT � British Broadcasting Corporation (BBC) 2018-10-05
[ 438 ]
Proposal of preliminary draft new Report ITU-R BT.[AI4BS] - Applications of Artificial Intelligence (AI) for Broadcasting (to Working Party 6C for action and to Working Parties 6A and 6B for information) � Japan 2018-10-05
[ 437 ]
Proposed revision of working document towards a preliminary draft new Report ITU-R BT.[ADVBROADCAST] - Advanced network planning and transmission methods for enhancements of digital terrestrial television broadcasting � Japan Q133/6 2018-10-05
[ 436 ]
Report on new terms, definitions and acronyms in recently approved Recommendations of Study Group 6 � SG 6 Rapp. on Terminology 2018-10-05
[ 435 ]
UHD video quality at various bitrates and transmission Resolutions � Korea (Republic of) 2018-10-04
[ 434 ]
Proposed revision of Report ITU-R BS.2384 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting � United States of America 2018-10-03
[ 433 ]
Proposed revision of Report ITU-R BS.2384 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting � United States of America 2018-10-03
[ 432 ]
Studies in response to Resolution ITU-R 59-1 on frequency bands and tuning ranges for ENG use � United States of America 2018-10-03
[ 431 ]
Continuation of digital terrestrial sound and multimedia broadcasting system RAVIS trials in test zones � Russian Federation 2018-10-03
[ 430 ]
Development of the teleinformation services using data transmission capabilities of digital terrestrial broadcasting networks � Russian Federation Q133/6 2018-10-03
[ 429 ]
Information on medium frequency broadcast operation and listening in portions of Region 2 for WPT Impact Assessment � North American Broadcasters Association (NABA) 2018-10-02
[ 428 ]
Liaison statement to Working Parties 5A, 5C, 5D and 6A - Report ITU-R SA.[460 MHZ METSAT-EESS] � WP 7B 2018-10-02
[ 427 ]
Liaison statement to Working Parties 4C, 5A, 5B, 5C and 6A - Characteristics and protection criteria for aeronautical mobile (route) systems operating in the frequency band 117.975-137 MHz � WP 7B AI1.7 2018-10-02
[ 426 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7 � WP 7B AI1.7 2018-10-01
[ 425 ]
Preliminary draft revision to Report ITU-R BT.2386-1 - Digital terrestrial broadcasting: Design and implementation of single frequency networks (SFN) � China (People's Republic of) Q102/6 2018-09-30
[ 424 ]
Performance evaluation for DTMB receivers under VHF and UHF band � China (People's Republic of) Q136/6 2018-09-30
[ 423 ]
Liaison statement on work being carried out under study in ITU-T Question 3/5 � ITU-T SG 5 2018-10-01
[ 422 ]
Laboratory test results for CDR receiver � China (People's Republic of) Q136/6 2018-09-30
[ 421 ]
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7D for information) - Preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems � WP 7A 2018-09-28
[ 420 ]
Liaison statement to ITU-R Working Parties 6A, 6B, 6C and 7D - Update of Report ITU-R BO.2071-1 "BSS system parameters between 17.3 GHz and 42.5 GHz and associated feeder links" � WP 4B 2018-09-04
[ 419 ]
Liaison statement on work which is under study in ITU-T Q3/5 � ITU-T SG 5 2018-08-27
[ 418 ]
Terrestrial broadcasting service � Guinea (Republic of) 2018-08-20
[ 417 ]
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - Working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] � WP 4A AI9.1 2018-07-24
[ 416 ]
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - Draft CPM text for WRC-19 agenda item 9.1, Issue 9.1.2 � WP 4A AI9.1 2018-07-24
[ 415 ]
(Rev.1)
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� regarding FSS/MSS/BSS � WP 4B 2018-07-06
[ 414 ]
Liaison statement to Working Parties 5A and 6A - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz] � WP 3L 2018-07-02
[ 413 ]
Liaison statement to Working Parties 1A, 5A, 5B and 6A (copy to Working Party 1B for information) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz] � WP 3L 2018-07-02
[ 412 ]
Reply liaison statement to Working Party 6A - Location variability in land area-coverage prediction � WP 3K 2018-07-02
[ 411 ]
Reply liaison statement to Working Party 6A - Use of modulation error ration (MER) to assess ducting � WP 3K 2018-07-02
[ 410 ]
Reply liaison statement to Working Parties 5A, 5B and 6A (copy to Working Party 1B) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5KHZ] � WP 1A Q210/1 2018-07-02
[ 409 ]
Liaison statement to Working Parties 5A, 5B, 6A and 7A (copy to Working Party 1B for information) on preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems � WP 1A Q210/1 2018-06-29
[ 408 ]
Liaison statement to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility management systems � WP 1A 2018-06-29
[ 407 ]
Reply liaisons statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7D) - Liaison activities on the G.mgfast PSD specification � WP 1A 2018-06-29
[ 406 ]
Reply liaison statement to Working Party 6A (copy to Working Parties 1A, 5B and 7A) - Draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 � WP 1B AI9.1 2018-06-28
[ 405 ]
Reply liaison statement to Working Parties 6A, 6B and 6C on revision of Report ITU-R M.2373 - Audio-visual capabilities and applications supported by terrestrial IMT systems � WP 5D 2018-06-27
[ 404 ]
Liaison statement to CISPR and ITU-T Study Group 5 on EMC standards and limits (copy to ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C & 7D) - Further Reports of Disturbances to Radiocommunication systems � WP 1A 2018-06-21
[ 403 ]
Reply liaison statement to Working Party 7A (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 6B, 6C, 7B, 7C, and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" and UTC application in IMT systems � WP 5D 2018-06-21
[ 402 ]
Liaison statement to Working Party 4A (copy for information to Working Party 6A) - Draft CPM text for agenda item 9.1, issue 9.1.2 � WP 5D 2018-06-21
[ 401 ]
Liaison statement to Working Party 6A (copied for information to Working Parties 3K, 3M, 5B and 5C) - Updated on work towards WRC-19 agenda item 1.1 � WP 5A 2018-06-06
[ 400 ]
Reply liaison statement to Working Party 6A - WRC-19 agenda item 1.11 � WP 5A 2018-06-01
[ 399 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L, 5B and 6A) - Applicability of Recommendation ITU-R M.1732 for use in studies undertaken in working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz] � WP 5A 2018-05-31
[ 398 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L and 6A) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz] � WP 5A 2018-05-31
[ 397 ]
Reply liaison statement to Working Party 1A (copy to Working Parties 1B, 3L, 5A, and 6A) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz] � WP 5B 2018-05-30
[ 396 ]
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 6 and Working Party 6A on collaboration � ITU-D SG 1 2018-05-22
[ 395 ]
Reply liaison statement to Working Party 6A - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2) � WP 7C 2018-05-22
[ 394 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - Status of WRC-19 agenda item 1.7 � WP 7B AI1.7 2018-05-21
[ 393 ]
(Rev.1)
Reply liaison statement to Working Party 4A (copy to Working Parties 5B, 5C, 5D, 6A, 7B, 7C for information) - Working document towards a preliminary draft new Report ITU-R S.[50/40 GHz adjacent band studies] - Protection of EESS (passive) and RAS systems for non-GSO fixed satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands � WP 7D AI1.6 2018-05-21
[ 392 ]
Liaison statement from ITU-D Study Group 2 on disaster relief use cases � ITU-D SG 2 2018-05-21
[ 391 ]
Liaison statement on invitation to update the information in the IMT-2020 roadmap � Chairman, ITU-T JCA-IMT2020 2018-05-14
[ 390 ]
Liaison statement to Working Party 6A and Working Party 6C - Preliminary draft new Question ITU-R [AI4BC]/6 on the use of Artificial Intelligence in Broadcasting � WP 6B 2018-05-08
Results:589 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2021-01-19