Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 125 ]
�
� |
The bel correction as a function of probability
�
� |
ORANGE POLSKA S.A.
,
Orange
� |
� |
2017-08-07 |
|
[ 124 ]
�
� |
Submission of data for Table IV-12 - Statistic of rain drop size distribution
�
� |
European Space Agency
,
Austria
� |
� |
2017-08-05 |
|
[ 123 ]
�
� |
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15
�
� |
WP 1A
� |
AI1.15
� |
2017-07-10 |
|
[ 122 ]
�
� |
Liaison statement to Working Party 3K on propagation characteristics in the 275-450 GHz band (copy to Working Parties 3J, 3M, 5A, 5C, 7C and 7D for information)
�
� |
WP 1A
� |
AI1.15
� |
2017-07-05 |
|
[ 121 ]
�
� |
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5D, 7B,7C, 7D and Task Group 5/1 - WRC-19 agenda item 1.14
�
� |
WP 5C
� |
AI1.14
� |
2017-06-05 |
|
[ 120 ]
�
� |
Note to Chairman of Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Microsoft EXCEL implementation of clutter loss and building entry loss calculations
�
� |
Chairmen, SG 3 and WPs 3J, 3K & 3M
� |
� |
2017-04-13 |
|
[ 119 ]
�
� |
Liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Preparations for WRC-19 agenda item 1.13
�
� |
Chairman, WP 6A
� |
AI1.13
� |
2017-04-05 |
|
[ 118 ]
�
+Ann.1-4� |
Report on the meeting of Working Party 3J (Geneva, 22 - 29 March 2017)
�
� |
Chairman, WP 3J
� |
� |
2017-03-30 |
|
[ 117 ]
�
� |
Final list of participants - Working Party 3J (Geneva, 22-29 March 2017)
�
� |
Director, BR
� |
� |
2017-03-29 |
|
[ 116 ]
�
� |
List of documents issued (Documents 3J/64 - 3J/116)
�
� |
BR Study Group Department
� |
� |
2017-03-20 |
|
[ 115 ]
�
� |
On Recommendation ITU-R P.[BEL]: BEL measurements for three buildings in the frequency range 800 MHz - 5.2 GHz with varying elevation incident angle
�
� |
Nokia Corporation
� |
� |
2017-03-15 |
|
[ 114 ]
�
� |
On Recommendation ITU-R P.[BEL]: Building entry loss measurement and modelling results on elevation angle dependence
�
� |
Telefon AB - LM Ericsson
� |
� |
2017-03-15 |
|
[ 113 ]
�
� |
Document not assigned to this Working Party
�
� |
BR Study Groups Department
� |
� |
2017-03-17 |
|
[ 112 ]
�
� |
Document not assigned to this Working Party
�
� |
BR Study Groups Department
� |
� |
2017-03-15 |
|
[ 111 ]
�
� |
Document not assigned to this Working Party
�
� |
BR Study Group Department
� |
� |
2017-03-15 |
|
[ 110 ]
�
� |
Building entry loss - Measurements covering 25 to 73 GHz frequency range
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2017-03-15 |
|
[ 109 ]
�
� |
On Recommendation ITU-R P.[BEL]: BEL measurements for two office buildings in the frequency range 800MHz -28GHz
�
� |
Nokia Corporation
� |
� |
2017-03-15 |
|
[ 108 ]
�
� |
Comparison between BEL prediction models and results of measurements and proposed regression model
�
� |
Orange
� |
� |
2017-03-15 |
|
[ 107 ]
�
� |
Document not assigned to this Working Party
�
� |
BR Study Groups Department
� |
� |
2017-03-15 |
|
[ 106 ]
�
� |
Document not assigned to this Working Party
�
� |
BR Study Groups Department
� |
� |
2017-03-15 |
|
[ 105 ]
�
� |
Some zero elevation angle building entry loss measurement results
�
� |
China (People's Republic of)
� |
� |
2017-03-15 |
|
[ 104 ]
�
� |
Building entry loss measurement results and modelling vary with elevation incident angle
�
� |
China (People's Republic of)
� |
� |
2017-03-15 |
|
[ 103 ]
�
� |
Empirical model for zero elevation angle building entry loss
�
� |
China (People's Republic of)
� |
� |
2017-03-15 |
|
[ 102 ]
�
� |
Proposed modification to Recommendation ITU-R P.676-11 - Attenuation by atmospheric gases
�
� |
China (People's Republic of)
� |
� |
2017-03-15 |
|
[ 101 ]
�
� |
Document not assigned to this Working Party
�
� |
BR Study Groups Department
� |
� |
2017-03-15 |
|
[ 100 ]
�
(Rev.1)� |
Report on the activities of Correspondence Group 3J-3M-13 - Validation examples
�
� |
CG 3J-3M-13
� |
� |
2017-03-14 |
|
[ 99 ]
�
� |
Evaluation of recent rainfall rate and variability prediction models using a long-term database of rainfall rate
�
� |
Spain
� |
� |
2017-03-14 |
|
[ 98 ]
�
� |
Contribution to the propagation data banks - Rain rate and slant-path rain attenuation measurements in Madrid
�
� |
Spain
� |
� |
2017-03-14 |
|
[ 97 ]
�
� |
Report on activities of the Correspondence Group - Building Entry Loss
�
� |
CG 3J-3K-3M-8
� |
� |
2017-03-14 |
|
[ 96 ]
�
� |
Proposed modification to working document towards a preliminary draft revision of Recommendation ITU-R P.1407-5
�
� |
Japan
� |
� |
2017-03-14 |
|
[ 95 ]
�
� |
Measurements on slant-path building entry loss
�
� |
Telstra Corporation Ltd.
� |
� |
2017-03-13 |
|
[ 94 ]
�
� |
Working document toward a preliminary draft revision of Report ITU-R P.2346-1 - Compilation of measurement data relating to building entry loss
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 93 ]
�
� |
Proposed liaison statement to ITU-R Task Group 5/1 in response to Decides 4) of Annex 9 of Administrative Circular CA-226
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 92 ]
�
� |
Revision of Work Plan in response to Decides 4) in Annex 9 (CPM19-1 Decision on the establishment and Terms of Reference of Study Group 5 Task Group 5/1 (TG 5/1) on WRC-19 agenda item 1.13) of CA/226
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 91 ]
�
� |
Proposed revision to Recommendation ITU-R P.834-8
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 90 ]
�
� |
Proposed revision to Recommendation ITU-R P.527-3
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 89 ]
�
� |
Proposed revision to Recommendation ITU-R P.676-11
�
� |
United States of America
� |
� |
2017-03-13 |
|
[ 88 ]
�
� |
Proposed revision to Recommendation ITU-R P.835
�
� |
Italy
,
Luxembourg
� |
� |
2017-03-13 |
|
[ 87 ]
�
� |
Submission of rainfall rate statistics for DBSG-3: 20 years of data from Findel, Luxembourg
�
� |
France
,
Luxembourg
� |
� |
2017-03-13 |
|
[ 86 ]
�
� |
Submission of rainfall rate statistics for DBSG-3: 19 sites in Ireland
�
� |
France
,
Luxembourg
� |
� |
2017-03-13 |
|
[ 85 ]
�
(Rev.1)� |
Proposed revision of Recommendation ITU-R P.1510-0
�
� |
France
,
European Space Agency
,
Italy
,
Luxembourg
� |
� |
2017-03-10 |
|
[ 84 ]
�
(Rev.1)� |
Proposed revision of Recommendation ITU-R P.837-6
�
� |
France
,
European Space Agency
,
Italy
,
Luxembourg
� |
� |
2017-03-10 |
|
[ 83 ]
�
� |
Proposed revision of Fascicle 3J/FAS/3
�
� |
France
,
European Space Agency
,
Italy
,
Luxembourg
� |
� |
2017-03-10 |
|
[ 82 ]
�
� |
Building entry loss measurements at 3, 10, 17 and 60 GHz frequencies
�
� |
Orange
� |
� |
2017-03-10 |
|
[ 81 ]
�
� |
Proposed channel parameters based on building entry loss and building material loss measurement results using a multifrequency sounder for the development of IMT-2020 channel models
�
� |
Canada
� |
� |
2017-03-10 |
|
[ 80 ]
�
� |
Liaison statement to Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15
�
� |
WP 1A
� |
� |
2016-12-13 |
|
[ 79 ]
�
� |
Reply liaison statement to Working Parties 3M and 3J (copied for information to Working Parties 4A, 5B and 5C) - Evaluation of the differences between Recommendations ITU-R P.620-6 and ITU-R P.620-4
�
� |
WP 1A
� |
� |
2016-12-13 |
|
[ 78 ]
�
� |
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 AI 1.13
�
� |
WP 5A
� |
AI1.13
� |
2016-11-23 |
|
[ 77 ]
�
� |
Reply liaison statement to ITU-R Working Parties 1A, 3J, 3M (copy to Working Party 4A for information) - Revision of Recommendations ITU-R SM.1448 and ITU-R P.620
�
� |
WP 5C
� |
� |
2016-11-21 |
|
[ 76 ]
�
� |
Reply liaison statement to Working Party 1A copied to Working Parties 1A, 3J, 3M, 4A, 4C 5A, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 5B
� |
� |
2016-11-18 |
Results:275 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):