International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1B� C�

ITU-R�WP1B

Spectrum Management Methodologies and Economic Strategies

Results:383 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 233 ]
(Rev.1)
Report of the work of the Rapporteur Group on Wireless Power Transmission � Acting Chairman, RG-WPT meeting 2017-11-22
[ 232 ]
Report on CISPR activities from June to November 2017 � Rapporteur, SG 1 RG on Liaison with CISPR , Rapporteur to CISPR on WPT issues 2017-11-21
[ 231 ]
Liaison statement to Working Parties 1A, 1B, 1C, 3L, 5A and 5C - Working document towards a preliminary draft new Report ITU-R M.[HF NOISE AT SEA] � WP 5B 2017-11-20
[ 230 ]
Reply liaison statement to ITU-R Working Party 1B (copy to Working Party 5D for information) - Work on WRC-19 agenda item 9.1, Issue 9.1.8 � WP 5A 2017-11-17
[ 229 ]
Reply liaison statements from CISPR to ITU-R Study Group 1 Working Parties 1A and 1B on wireless power transfer � SG 1 Rapp. to CISPR on WPT issues Q210/1, AI9.1 2017-11-17
[ 228 ]
Proposed modifications to Annex 3 to Working Party 1B Chairman's Report - Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] - [Methodology for spectrum management of wireless power transmission (WPT)] � European Broadcasting Union 2017-11-16
[ 227 ]
Proposal of complementary modifications to France contribution on the working document towards a preliminary draft new Report ITU-R SM.[LPWAN.MTC] - Low Power Wide Area Networks (LPWAN) for Machine-Type Communication and the Internet of Things and potential harmonization opportunities � Sigfox AI9.1 2017-11-16
[ 226 ]
Reply from IEC/TC69/WG7 and ISO/TC22/SC37/JPT19363 to liaison statement from Working Party 1A and Working Party 1B � International Electrotechnical Commission , International Organization for Standardization 2017-11-16
[ 225 ]
Proposed modifications to the working document towards a preliminary draft new Report on studies for WRC-19 agenda item 9.1, issue 9.1.7 � Luxembourg AI9.1 2017-11-16
[ 224 ]
Proposed modifications to the working document towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.7 - ITU-R Resolution 958 (WRC-15) Annex item 2 � Luxembourg AI9.1 2017-11-16
[ 223 ]
Working document toward preliminary draft new Report for WRC-19 agenda item 9.1, issue 9.1.7 � Bahrain (Kingdom of) AI9.1 2017-11-16
[ 222 ]
Working document toward CPM text for WRC-19 agenda item 9.1, issue 9.1.7 � Bahrain (Kingdom of) AI9.1 2017-11-16
[ 221 ]
Proposed update of working document towards a preliminary draft new Report ITU-R SM[LPWAN.MTC] � China (People's Republic of) AI9.1 2017-11-16
[ 220 ]
The industry development status of WPT for electric vehicle technology in China � China (People's Republic of) 2017-11-16
[ 219 ]
Sharing study between electric vehicle WPT system with other systems in China � China (People's Republic of) 2017-11-16
[ 218 ]
Proposed modification to the working document towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.7 - ITU-R Resolution 958 (WRC-15) Annex item 2 � China (People's Republic of) AI9.1 2017-11-16
[ 217 ]
Comments to the ITU-R Recommendations and Reports assigned to ITU-R Working Party 1B � Korea (Republic of) 2017-11-16
[ 216 ]
Proposed revision of preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] � Korea (Republic of) Q210/1, AI9.1 2017-11-16
[ 215 ]
Proposal of methodology of studies on the impact to sound broadcasting services in the MF band from wireless power transmission systems for electric vehicles � Japan Q210/1, AI9.1 2017-11-16
[ 214 ]
Proposal on preliminary draft revision of Recommendation ITU-R SM.2110-0 � Japan Q210/1, AI9.1 2017-11-16
[ 213 ]
+Corr.1
Working document toward preliminary draft new Report agenda item 9.1, issue 9.1.7 � Egypt (Arab Republic of) , Djibouti (Republic of) AI9.1 2017-11-15
[ 212 ]
+Corr.1
Working document toward CPM text for WRC-19 agenda item 9.1, issue 9.1.7 � Egypt (Arab Republic of) , Djibouti (Republic of) AI9.1 2017-11-15
[ 211 ]
Protection of sound broadcasting from emissions from WPT for EV (WRC-19 agenda item 9.1, issue 9.1.6) and text proposals for Report ITU-R SM.[WPT-SPEC-MNGM] � British Broadcasting Corporation (BBC) AI9.1 2017-11-15
[ 210 ]
Proposed modifications to the working document towards a preliminary draft new Report ITU-R SM.[LPWAN.MTC] - Low Power Wide Area Networks (LPWAN) for Machine-Type Communication and the Internet of Things and potential harmonization opportunities � France AI9.1 2017-11-14
[ 209 ]
Proposed revisions to the working document towards a preliminary draft new Report on studies for WRC-19 agenda item 9, issue 9.1.7 � United States of America AI9.1 2017-11-13
[ 208 ]
Revisions to the working document toward CPM text for WRC-19 agenda item 9.1, issue 9.1.7 � United States of America AI9.1 2017-11-13
[ 207 ]
Working document towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.7 - ITU-R Resolution 958 (WRC-15), Annex Item 2 � Russian Federation AI9.1 2017-11-13
[ 206 ]
Unwanted emissions in the spurious domain from wireless power transfer for Electric Vehicles � International Amateur Radio Union AI9.1 2017-11-10
[ 205 ]
Draft revision of Report ITU-R SM.2012-5 - Economic aspects of spectrum management � ATDI 2017-11-11
[ 204 ]
Reply liaison statement to Working Party 1B (WRC-19 agenda item 9.1, issue 9.1.7) - Studies on managing uplink transmissions of terminals to be limited to authorized terminals � WP 4A 2017-11-07
[ 203 ]
Liaison statement to Working Party 1B (copy to Working Parties 1A, 5B, 5C, 6A and 7D for information) - Studies on "Wireless Power Transmission (WPT)" � WP 7A Q210/1 2017-11-01
[ 202 ]
Liaison statement to ITU-R Working Parties 1A and 1B regarding - WRC-19 agenda item 9.1 issue 9.1.6 � WP 6A AI9.1 2017-10-23
[ 201 ]
Liaison statement to ITU-R Study Group 1 and ITU-R Working Parties 1A and 1B - Wireless Power Transmission (WPT) � WP 6A Q210/1 2017-10-23
[ 200 ]
Liaison statement to Working Party 1B - Comment on the Report ITU-R SM.2405 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities � WP 6A 2017-10-23
[ 199 ]
Reply liaison statement to Working Parties 1B and 5A - Work on WRC-19 agenda item 9.1, issue 9.1.8 � WP 5D AI9.1 2017-10-19
[ 198 ]
Information on current activities in APT Wireless Group on Question ITU-R 210-3/1 "Wireless power transmission" and WRC-19 agenda item 9.1, issue 9.1.6 in response to Resolution 958 (WRC-15) Annex item 1 � Asia-Pacific Telecommunity 2017-10-06
[ 197 ]
Studies related to CRS in APT Wireless Group � Asia-Pacific Telecommunity 2017-10-06
[ 196 ]
Liaison statement on the first meeting of ITU-T Focus Group on data processing and management to support IoT and Smart Cities & Communities (FG-DPM) � ITU-T FG-DPM 2017-07-21
[ 195 ]
Reply liaison statement to Working Party 7D (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, and 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services � WP 1A 2017-07-10
[ 194 ]
Liaison statement on information about work being carried out under study in ITU-T Question 3/5 � ITU-T SG 5 2017-06-23
[ 193 ]
+Ann.1-13
Report on the third 2015-2019 meeting of Working Party 1B (Geneva, 13 - 20 June 2017) � Chairman, WP 1B 2017-06-21
[ 192 ]
Final list of participants - Working Party 1B (Geneva, 13-20 June 2017) � Director, BR 2017-06-20
[ 191 ]
Note from the Chairman of Working Party 1C to the Chairman of Working Party 1B - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities � WP 1C 2017-06-16
[ 190 ]
Note from the Chairman of Working Party 1C to the Chairman of Working Party 1B - Reply to the liaison statement from Working Party 1B (WRC 19 agenda item 9.1, issue 9.1.7) - Studies on managing uplink transmissions of terminals to be limited to authorized terminals � WP 1C AI9.1 2017-06-16
[ 189 ]
List of documents issued (Documents 1B/123 - 1B/189) � BR Study Groups Department 2017-06-13
[ 188 ]
Report of the work of the Rapporteur Group on Wireless Power Transmission � Rapporteur, RG-WPT Q210/1 2017-06-13
[ 187 ]
Report for WP 1B meeting on Rapporteur Group's activities � Rapporteur,RG Regulatory Tools Q208/1 2017-06-12
[ 186 ]
IEC/TC69/WG7 and ISO/TC22/SC37/JPT19363 input to ITU-R � International Electrotechnical Commission , International Organization for Standardization 2017-06-09
[ 185 ]
+Add.1
Report on CISPR activities on WPT issues - December 2016 to May 2017 � SG 1 Rapp. to CISPR on WPT issues Q232/1 2017-06-09
[ 184 ]
(Rev.1)
Report on CISPR activities June 2016 to May 2017 � Rapporteur, SG 1 RG on Liaison with CISPR , SG 1 Rapp. to CISPR on WPT issues 2017-06-09
Results:383 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-16