Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 594 ]
�
� |
Proposed amendments to the Questions assigned to Working Party 5A
�
� |
Canada
� |
� |
2014-10-20 |
|
[ 593 ]
�
� |
Progression of the preliminary draft revision of Recommendation ITU-R M.1824 - System characteristics of television outside broadcast, electronic news gathering and electronic field production in the mobile service for use in sharing studies
�
� |
Canada
� |
� |
2014-10-20 |
|
[ 592 ]
�
� |
Proposed modifications to preliminary draft new Report ITU-R M.[5 MHz COMPAT]
�
� |
Canada
� |
� |
2014-10-20 |
|
[ 591 ]
�
� |
Proposed amendments to the working document toward a preliminary draft revision of Recommendation ITU-R M.2015 - Frequency arrangements for public protection and disaster relief radiocommunication systems in UHF bands in accordance with Resolution 646 (Rev.WRC-12)
�
� |
Canada
� |
� |
2014-10-20 |
|
[ 590 ]
�
� |
Proposed amendments to the preliminary draft revision of Recommendation ITU-R M.2009 - Radio interface standards or use by public protection and disaster relief operations in some parts of the UHF band in accordance with Resolution 646 (WRC-03)
�
� |
Canada
� |
� |
2014-10-20 |
|
[ 589 ]
�
� |
Progression of the working document towards a preliminary draft new Report ITU-R M.[PPDR] "Public protection and disaster relief communications"
�
� |
Canada
� |
� |
2014-10-20 |
|
[ 588 ]
�
� |
Improvements to the working document towards a preliminary draft new Report on M.[LOCAL_COVERAGE] "Operational guidelines for the deployment of broadband mobile systems for local coverage in the frequency bands below 6 GHz / Local coverage operation of broadband wireless access systems in the bands below 6 GHz."
�
� |
United States of America
� |
� |
2014-10-18 |
|
[ 587 ]
�
� |
Proposed liaison reply to Working Party 1B, regarding working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]
�
� |
United States of America
� |
� |
2014-10-18 |
|
[ 586 ]
�
� |
Proposals on Addendum of the ITU-R Recommendation M.1450-5 "Characteristics of broadband radio local area networks" related considerations and possible actions on testing for conformance assessment
�
� |
Ukrainian State Centre of Radio Frequencies
� |
� |
2014-10-17 |
|
[ 585 ]
�
� |
Proposed modifications to the working document towards a preliminary draft new Report ITU-R M.[PPDR]
�
� |
Motorola Solutions Inc.
� |
� |
2014-10-17 |
|
[ 584 ]
�
� |
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4C, 5A, 5B 5C, 6A and ITU-T Study Group 15) - Considerations on the G.9700 power spectral densitiy (PSD) limit mask
�
� |
WP 7D
� |
� |
2014-10-17 |
|
[ 583 ]
�
� |
Liaison statement to the Special Committee (copy for information to Working Parties 5A and 6A) - WRC-15 agenda item 9.1 (9.1.8)
�
� |
WP 7B
� |
� |
2014-10-17 |
|
[ 582 ]
�
� |
Liaison statement to Working Party 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (for information)
�
� |
WP 7B
� |
� |
2014-10-16 |
|
[ 581 ]
�
� |
Proposed further amendment of working document towards a preliminary draft new Report ITU-R- M.[PPDR]
�
� |
Australia
� |
� |
2014-10-16 |
|
[ 580 ]
�
� |
Report of the tenth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters
�
� |
International Maritime Organization
� |
� |
2014-10-15 |
|
[ 579 ]
�
� |
Proposals for update of preliminary draft new Report ITU-R M.[5 MHz COMPAT] - Compatibility analysis of possible amateur service stations with fixed, land mobile, maritime mobile and radiolocation services in the frequency band 5 250-5 450 kHz and the aeronautical mobile service in an adjacent band
�
� |
Russian Federation
� |
� |
2014-10-15 |
|
[ 578 ]
�
� |
Liaison statement on Question ITU-R 254/5 - Operation of short-range Radiocommunication public access system supporting hearing aid systems
�
� |
Director, BR
� |
� |
2014-10-15 |
|
[ 577 ]
�
� |
Progress Report of Joint Correspondence Group activity
�
� |
Chairman, JCG 5A/5C
� |
� |
2014-10-13 |
|
[ 576 ]
�
� |
Liaison statement on current status on draft Recommendation ITU-T K.mhn and issues related to coexistence of wired telecommunications and radio communication
�
� |
ITU-T SG 9
� |
� |
2014-10-09 |
|
[ 575 ]
�
� |
Liaison statement to 3GPP (copy to ITU-R Working Party 5A and Working Party 5D) - Liaison statement regarding scope and status relevant to PPDR work items and study items
�
� |
Asia-Pacific Telecommunity
� |
� |
2014-10-08 |
|
[ 574 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R M.2015 - Frequency arrangements for public protection and disaster relief radiocommunication systems in UHF bands in accordance with Resolution 646 (Rev. WRC-12)
�
� |
Israel (State of)
� |
� |
2014-10-07 |
|
[ 573 ]
�
� |
Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)
�
� |
ITU-T SG 9
� |
� |
2014-09-30 |
|
[ 572 ]
�
� |
Report
�
� |
CG on Rep. M.[PPDR]
� |
� |
2014-09-30 |
|
[ 571 ]
�
� |
Liaison statement to Working Party 5A - Revised element for sharing studies being conducted under WRC-15 agenda items 1.6 & 1.6.2
�
� |
WP 4A
� |
� |
2014-09-10 |
|
[ 570 ]
�
� |
Activity Report for Working Party 5A
�
� |
CG on Rep. Local Coverage
� |
� |
2014-09-09 |
|
[ 569 ]
�
(Rev.1)� |
Results of the 21th RAG meeting
�
� |
Chairman, SG 5
� |
� |
2014-08-27 |
|
[ 568 ]
�
� |
Reply liaison statement informing about MEF 22.1 and MEF 22.1.1 - Mobile backhaul implementation agreement
�
� |
Director, BR
� |
� |
2014-08-20 |
|
[ 567 ]
�
� |
LS/r on Recommendation ITU-T K.60 - Coexistence of wired and wireless communication systems
�
� |
ITU-T SG 5
� |
� |
2014-08-08 |
|
[ 566 ]
�
� |
Liaison statement to Working Party 5A - Updating the integrated database of ITU terms and definitions
�
� |
CCV
� |
� |
2014-07-30 |
|
[ 565 ]
�
� |
Liaison statement on draft ITU-T F.ACC-Term
�
� |
ITU-T SG 16
� |
� |
2014-07-28 |
|
[ 564 ]
�
� |
Reply liaison statement to Working Party 5A - WRC-15 agenda item 1.10
�
� |
WP 4C
� |
� |
2014-07-17 |
|
[ 563 ]
�
� |
Reply liaison statement to Working Party 5A - WRC-15 agenda item 1.9.2
�
� |
WP 4C
� |
� |
2014-07-17 |
|
[ 562 ]
�
� |
Liaison statement ITU-R Working Party 5A on ITS technical parameters, Recommendation ITU-R M.[V2X]
�
� |
European Telecommunications Standards Institute
� |
� |
2014-06-19 |
|
[ 561 ]
�
(Rev.1)� |
[WORKING PARTY 5A AND] Working Party 5D - Proposal for draft reply liaison statement to Joint Coordination Activity on Accessibility and Human Factors (JCA-AHF)
�
� |
WP 5D
� |
� |
2014-06-30 |
|
[ 560 ]
�
� |
Reply liaison statement - IMT systems and broadband trunking communication (B-TRUNC) system for PPDR
�
� |
WP 5D
� |
� |
2014-06-30 |
|
[ 559 ]
�
� |
Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 558 ]
�
� |
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - ITU-R interest in K series Recommendations
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 557 ]
�
� |
Liaison statement to the broadband forum (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Specifications and performance of cabling intended for use with G.fast
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 556 ]
�
� |
Liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 4C, 5A, 5B, 5C, 6A and 7D) - Considerations on the G.9700 power spectral density (PSD) limit mask
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 555 ]
�
� |
Liaison statement to ITU-T Study Groups 5 and 15 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Excessive levels of radio frequency noise in the environment
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 554 ]
�
� |
Liaison statement to ITU-T Study Group 15 and CENELEC (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Ensuring that telecommunication systems that depend on the use of radio frequencies have been properly assessed for compatibility and the avoidance of harmful interference
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 553 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
�
� |
WP 1B
� |
� |
2014-06-19 |
|
[ 552 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D (copy to Working Parties 1B and 1C) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
�
� |
WP 1A
� |
� |
2014-06-19 |
|
[ 551 ]
�
� |
Liaison statement to Working Party 5B (copy for information to Working Parties 5A and 5C) - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
�
� |
WP 1C
� |
240/5
� |
2014-06-17 |
|
[ 550 ]
�
� |
Liaison statement on treatment about FG-DR&NRR deliverables
�
� |
ITU-T SG 2
� |
� |
2014-06-12 |
|
[ 549 ]
�
� |
Liaison statement on coexistence of wired telecommunications with radiocommunication systems (reply to COM5-LS45)
�
� |
ITU-T SG 9
� |
� |
2014-06-02 |
|
[ 548 ]
�
� |
Liaison statement on additional information on regional regulations related to coexistence of wired telecommunication with radiocommunication systems
�
� |
ITU-T SG 9
� |
� |
2014-06-02 |
|
[ 547 ]
�
� |
Liaison statement to Working Parties 1A, 5A, 5C and 5D regarding development of a Report on out-of-band emissions in the 2 700-2 900 MHz frequency band from service operating below 2 690 MHz
�
� |
WP 5B
� |
� |
2014-05-30 |
|
[ 546 ]
�
� |
Reply liaison statement to ITU-R Joint Task Group 4-5-6-7 (copy for information to Working Party 5A) - Possible mitigation techniques to address interference to EESS (active) and radiodetermination from the potential use of the frequency bands 5 350-5 470 and/or 5 725-5 850 MHz bay WAS/RLANS
�
� |
WP 5B
� |
� |
2014-05-30 |
|
[ 545 ]
�
� |
Liaison statement to ITU-T Study Groups 5, 9, 15 and ITU-R Working Party 1A (copied for information to ITU-R Working Parties 5A, 5C, 5D and 6A) - Liaison statement on coexistence of wired telecommunications with radiocommunication systems
�
� |
WP 5B
� |
� |
2014-05-30 |
Results:744 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):