International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1B� C�

ITU-R�WP1B

Spectrum Management Methodologies and Economic Strategies

Results:250 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 100 ]
Liaison statement to Working Party 1B on development of a draft new Report ITU-R SM.[WHITE-SPACE] - (Copy to Working Party 5A for information) - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities � WP 5D 2013-10-18
[ 99 ]
Liaison statement to ITU-R Working Party 1B - Studies towards review of the definitions of fixed service, fixed station and mobile station - WRC-15 agenda item 9.1, issue 9.1.6 - Resolution 957 (WRC-12) � WP 5D 2013-10-18
[ 98 ]
Liaison statement on draft revision of Recommendation ITU-R M.1076 "Wireless communication systems for persons with impaired hearing" (reply to Document 5B/110) � ITU-T JCA-AHF 2013-10-03
[ 97 ]
Liaison statement on draft revision of Recommendation ITU-R M.1076 � ITU-T JCA-AHF 2013-10-03
[ 96 ]
Liaison statement to Working Party 1B - WRC-15 agenda item 9.1, issue 9.1.6 � WP 4C 2013-09-30
[ 95 ]
Liaison statement to Working Party 1B - Working Document towards a preliminary draft new Report ITU-R SM. [WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities � WP 4C 2013-09-30
[ 94 ]
Information on the preparation of texts for the draft CPM Report to WRC-15 � Chairman, CPM-15 2013-09-10
[ 93 ]
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 1A, 1B, 4A and 5A for information) - Status of compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments � WP 5D 2013-07-17
[ 92 ]
+Ann.1-14
Report on the meeting of Working Party 1B (Geneva, 4-11 June 2013) � Chairman, WP 1B 2013-06-11
[ 91 ]
Final list of participants - Working Party 1B (Geneva, 4-11 June 2013) � Director, BR 2013-06-11
[ 90 ]
(Rev.1)
Note from the Chairman of Working Party 1A to the Chairman of Working Party 1B on Correspondence Group (CG-WPT) on developing content for possible preliminary draft new Report and Recommendation on WPT � Chairman, WP 1A 2013-06-10
[ 89 ]
(Rev.1)
Note from the Chairman of Working Party 1A to the Chairman of Working Party 1C - On Cognitive Radio Systems - Scope of spectrum engineering aspects to be included in a future ITU-R Report � Chairman, WP 1A 2013-06-06
[ 88 ]
Conclusions from the Joint meeting of Working Parties 1A, 1B AND 1C (Tuesday, 4 June 2013) � Chairman, SG 1 2013-06-04
[ 87 ]
List of documents issued (Documents 1B/42 - 1B/87) � BR Study Groups Department 2013-06-03
[ 86 ]
Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing � WP 5A 2013-06-03
[ 85 ]
Results of the 20th RAG meeting (Geneva, 22 to 24 May 2013) � Chairman, SG 1 2013-05-30
[ 84 ]
Working document towards a preliminary draft revision of the ITU Handbook on "National Spectrum Management" � Canada 2013-05-28
[ 83 ]
WRC-15 Agenda item 9.2 - Working document on issues for consideration under the Director's Report � Canada 2013-05-28
[ 82 ]
Proposed working document towards a preliminary draft new Report ITU-R SM.[WHITE SPACE] - Spectrum management principles and techniques for the use of white spaces by radio systems employing cognitive capabilities � Canada 2013-05-28
[ 81 ]
Preliminary draft revision of Report ITU-R SM.2257 - Spectrum management and monitoring during major events � Ukraine 2013-05-28
[ 80 ]
EFIS presentation � European Communications Office 2013-05-28
[ 79 ]
Preliminary draft revision of Recommendation ITU-R SM.1413-2 - Radiocommunication Data Dictionary (RDD) � United Kingdom of Great Britain and Northern Ireland 2013-05-28
[ 78 ]
Draft revision to the content of the preliminary draft new Report ITU-R SM.[RES. 957] on enhancing the international regulatory framework in relation to Resolution 951 (Rev.WRC-07) which may be relevant to studies on WRC-15 Agenda item 9.1.6 - Studies towards review of the definitions of fixed service, fixed station and mobile station � China (People's Republic of) 2013-05-28
[ 77 ]
Preliminary draft revision of Report ITU-R SM.2012-3 (2010) 'Economic aspects of spectrum management' � China (People's Republic of) 2013-05-28
[ 76 ]
Working document towards a preliminary draft revision of the ITU Handbook on "National Spectrum Management - Chapter 1 (Spectrum Management Fundamentals) and Annex 1 (Spectrum Management Training)" � Korea (Republic of) 2013-05-28
[ 75 ]
Working document towards a preliminary draft revision of the ITU Handbook on "National Spectrum Management - Chapter 6 (Spectrum Economics)" � Korea (Republic of) 2013-05-28
[ 74 ]
Working document towards a preliminary draft revision of the ITU Handbook on "National Spectrum Management - Chapter 5 (Spectrum Engineering Practices)" � Korea (Republic of) 2013-05-28
[ 73 ]
Report of the activities of the Rapporteur Group � Rapp. RG WP 1B rev. ITU H'book on "N.S.M." 2013-05-28
[ 72 ]
Presentation of the Spectrum Management Handbook developed by the Administration of Colombia � Colombia (Republic of) 2013-05-27
[ 71 ]
Liaison statement to Working Party 1B - WRC-15 Agenda item 9.1, Issue 9.1.6 � WP 4A 2013-05-27
[ 70 ]
Liaison statement to the JCA-AHF (copy for information to ITU-R WPs 1A, 1B, 5A, 5C and 6A, ITU-T FG-AVA, SGs 2 and 16, ITU-D SGs 1 and 2 and ETSI ERM TG 17) - Reply liaison statement on draft revision of Recommendation ITU-R M.1076 � WP 5B 2013-05-24
[ 69 ]
Working materials towards planned new Report on the implementation of the digital dividend - National experience of Russian Federation towards implementation of the Digital Dividend � Russian Federation 2013-05-23
[ 68 ]
Proposal for working document towards a preliminary draft new Report ITU-R SM.[RES.67] - Studies on the updating and rearrangement of the Radio Regulations in relation to Resolution 67 (WRC-12) � Russian Federation 2013-05-23
[ 67 ]
Liaison statement on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range (COM 16-LS 14) [to ITU-R WP 5A and ITU-T SG 16] � JCA-AHF 2013-05-23
[ 66 ]
Revision of the Recommendation ITU-R SM.1603 - Spectrum redeployment as a method of national spectrum management � Benin (Republic of) 2013-05-22
[ 65 ]
Results of the 19th RAG meeting (Geneva, 25 to 27 June 2012) � Chairman, SG 1 2013-05-16
[ 64 ]
Liaison statement on nomination of JCA-AHF representatives � ITU-T JCA-AHF 2013-05-14
[ 63 ]
Liaison statement to Working Part 1B - WRC-15 Agenda item 9.1, Issue 9.1.6 � WP 4C 2013-05-06
[ 62 ]
Proposal regarding the update of Report SM. 2153-3 - Technical and operating parameters and spectrum requirements for short-range devices � Netherlands (Kingdom of the) 2013-05-03
[ 61 ]
Update to Recommendation ITU-R SM.1370 - Design guidelines for developing automated spectrum management systems � Israel (State of) 2013-04-25
[ 60 ]
Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR) � ITU-T FG-DR&NRR 2013-04-17
[ 59 ]
Preliminary draft revision of Recommendation ITU-R SM.1370-1 - Design guidelines for developing automated spectrum management systems � United States of America 2013-04-08
[ 58 ]
+Corr.1
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, JTG 4-5-6-7 and the Special Committee as responsible Groups for WRC-15 Agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D) � World Meteorological Organization 2013-03-06
[ 57 ]
Reply liaison statement on draft revision of Recommendation ITU-R M.1076 � ITU-T JCA-AHF 2013-02-13
[ 56 ]
Liaison statement to Working Party 1B on further studies on cognitive radio systems (CRS) � WP 5D 2013-02-07
[ 55 ]
Liaison statement to Working Party 6A on further studies on cognitive radio systems (CRS) (copy to Working Parties 1B, 5A and 5C) � WP 5D 2013-02-07
[ 54 ]
Reply liaison statement to ITU-R Working Party 5A on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHG frequency range � ITU-T SG 16 2013-02-06
[ 53 ]
Studies on cognitive radio systems (white space devices) in Europe � Germany (Federal Republic of) 2013-02-04
[ 52 ]
Liaison statement to Working Parties 1A, 1B, 5B, 5C and 6A (copy to ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF) - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing � WP 5A 2012-11-15
[ 51 ]
Liaison statement to Working Party 5A, 1A, 1B, 5C and 6A, ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing � WP 5B 2012-11-14
Results:250 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-16