Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 98 ]
�
� |
Liaison statement to ITU-R Working Party 1A and ITU-T Study Group 9 (copied for information to ITU-T Study Groups 5 and 15, and ITU-R Working Parties 3L, 4C, 5D, 6A, 7C and 7D) - Impact from wired telecommunication (including PLT) on Radiocommunication systems
�
� |
WPs 5A, 5B and 5C
� |
� |
2013-05-31 |
|
[ 97 ]
�
� |
Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Group 15 (copy to ITU-R Working Parties 1C, 5D & 6A for information) - Coexistence of wired and wireless communications systems - Further developments on Recommendation ITU-T G.FAST
�
� |
WPs 5A, 5B and 5C
� |
� |
2013-05-31 |
|
[ 96 ]
�
� |
Results of the 20th RAG meeting (Geneva, 22 to 24 May 2013)
�
� |
Chairman, SG 1
� |
� |
2013-05-30 |
|
[ 95 ]
�
� |
Comments on ITU-T Recommendations K.60 and K.MHN as a response to the liaison statement from ITU-T SG5 in Document 1A/67 and its Addendum 1
�
� |
European Broadcasting Union
� |
� |
2013-05-28 |
|
[ 94 ]
�
� |
Comments on Annex 3 to Document 1A/39 (Working document towards a PDN Report ITU-R SM.[SMART_GRID])
�
� |
European Broadcasting Union
� |
� |
2013-05-28 |
|
[ 93 ]
�
� |
Information paper - Wireless power transmission
�
� |
China (People's Republic of)
� |
210-3/1
� |
2013-05-28 |
|
[ 92 ]
�
� |
Working document towards a PDN Report ITU-R SM.[SMART_GRID] - Smart grid power management systems
�
� |
Institute of Electrical and Electronics Engineers, Inc.
� |
� |
2013-05-28 |
|
[ 91 ]
�
� |
Improvement on working document towards a preliminary draft new Report ITU-R SM.[PLT RAD-PSD] - Methodologies for relating the radiation from PLT installations to PLT modem output
�
� |
Korea (Republic of)
� |
� |
2013-05-28 |
|
[ 90 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R SM.[PORTABLE_WPT] and associated Correspondence Group
�
� |
Korea (Republic of)
� |
210-3/1
� |
2013-05-28 |
|
[ 89 ]
�
� |
Report of the Rapporteur Group on the revision of the ITU Handbook on "Computer aided techniques for spectrum management (2005)"
�
� |
Rapp. RG WP 1A rev. ITU H'book on "Computer..."
� |
� |
2013-05-28 |
|
[ 88 ]
�
� |
On unwanted emissions in the out-of-band and spurious domains
�
� |
Germany (Federal Republic of)
� |
� |
2013-05-27 |
|
[ 87 ]
�
� |
Proposal for a new Question on the characterization of the unwanted emission in the spurious domain
�
� |
Germany (Federal Republic of)
� |
� |
2013-05-27 |
|
[ 86 ]
�
� |
Material for inclusion in the preliminary draft new Report on wireless power transmission - Japan's studies and experiments on wireless power transmission
�
� |
Japan
� |
210-3/1
� |
2013-05-27 |
|
[ 85 ]
�
(Rev.1)� |
Proposal for new ITU-R texts on wireless power transmission
�
� |
Japan
� |
210-3/1
� |
2013-05-27 |
|
[ 84 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[THZ_TREND] -Technology trends of active services in the band above 275 GHz
�
� |
Japan
� |
� |
2013-05-27 |
|
[ 83 ]
�
� |
Draft new Question ITU-R SM.[THZ] - Technical and operational characteristics of the active services operating in the range 275-1 000 GHz
�
� |
Japan
� |
264/4, 238-1/3, 235-1/7
� |
2013-05-27 |
|
[ 82 ]
�
� |
Rapporteur Group on coexistence of wired telecommunication with Radiocommunication systems
�
� |
Rapporteur, RG wired and radio
� |
� |
2013-05-27 |
|
[ 81 ]
�
� |
Input on working document towards a preliminary draft revision of Recommendation ITU-R SM.1132-2 - General principles and methods for sharing between radiocommunication services or between radio stations
�
� |
United States of America
� |
� |
2013-05-24 |
|
[ 80 ]
�
� |
A working document towards a draft new Recommendation ITU-R SM.[WPT] - Wireless Power Transmission (WPT) systems for wireless charging of mobile devices
�
� |
United States of America
� |
210-3/1
� |
2013-05-24 |
|
[ 79 ]
�
� |
Liaison statement to the JCA-AHF (copy for information to ITU-R WPs 1A, 1B, 5A, 5C and 6A, ITU-T FG-AVA, SGs 2 and 16, ITU-D SGs 1 and 2 and ETSI ERM TG 17) - Reply liaison statement on draft revision of Recommendation ITU-R M.1076
�
� |
WP 5B
� |
� |
2013-05-24 |
|
[ 78 ]
�
� |
Results of the 19th RAG meeting (Geneva, 25 to 27 June 2012)
�
� |
Chairman, SG 1
� |
� |
2013-05-16 |
|
[ 77 ]
�
� |
Liaison statement on nomination of JCA-AHF representatives
�
� |
ITU-T JCA-AHF
� |
� |
2013-05-14 |
|
[ 76 ]
�
� |
Liaison statement to ITU-T Study Group 5 and ITU-R Working Party 1A (copy to ITU-R Working Parties 1C, 5A, 5B, and 5C for information) - Coexistence of wired and wireless communications systems
�
� |
WP 6A
� |
� |
2013-05-08 |
|
[ 75 ]
�
� |
Liaison statement to Working Party 1A (and for information to ITU-R Working Parties 5A, 5B and 5C and ITU-T Study Groups 5, 9 & 15) - Considerations on wired telecommunication systems being developed under G.fast and J.HiNoC
�
� |
WP 6A
� |
� |
2013-05-08 |
|
[ 74 ]
�
(Rev.1)� |
Man-made noise measurements in the range below 30 MHz at safety related receiving stations in Germany
�
� |
Germany (Federal Republic of)
� |
� |
2013-04-26 |
|
[ 73 ]
�
� |
Recommendation ITU-R SM.329 - Editorial correction in English version
�
� |
Israel (State of)
� |
� |
2013-04-25 |
|
[ 72 ]
�
� |
Liaison statement to ITU-R Working Party 1A - Wireless Power Transmission (WPT)
�
� |
Asia-Pacific Telecommunity
� |
� |
2013-04-12 |
|
[ 71 ]
�
� |
Reply liaison statement to ITU-R Working Party 1A and Working Parties 5A, 5B and 5C on impact from wired telecommunication (including PLT) on radiocommunication systems
�
� |
ITU-T SG 9
� |
� |
2013-02-19 |
|
[ 70 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5B, Working Party 5C, Working Party 6A, Working Party 7B, Working Party 7C, Working Party 7D, Working Party 1A, Working Party 3K, Working Party 3M) - Further elaboration on suitable frequency ranges and their suitability
�
� |
WP 5D
� |
� |
2013-02-18 |
|
[ 69 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, (WPs 1A, 3K, 3M)) - Suitable frequency ranges above 6 GHz
�
� |
WP 5D
� |
� |
2013-02-18 |
|
[ 68 ]
�
� |
Liaison statement to JTG 4-5-6-7 on adjacent band compatibility between the IMT uplink and digital terrestrial television (DTT) broadcasting under WRC-15 Agenda item 1.2 (copy to Working Party 1A and Working Party 6A for information)
�
� |
WP 5D
� |
� |
2013-02-18 |
|
[ 67 ]
�
+Add.1� |
Liaison statement - Study Group 5 activities related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks
�
� |
ITU-T SG 5
� |
� |
2013-02-15 |
|
[ 66 ]
�
� |
Reply liaison statement on draft revision of Recommendation ITU-R M.1076
�
� |
ITU-T JCA-AHF
� |
� |
2013-02-13 |
|
[ 65 ]
�
� |
Studies on cognitive radio systems (white space devices) in Europe
�
� |
Germany (Federal Republic of)
� |
� |
2013-02-04 |
|
[ 64 ]
�
� |
Liaison statement to Working Parties 5D and 6A (copy to Working Party 1A for information) - Adjacent band compatibility between the mobile broadband uplink and digital terrestrial television broadcasting under WRC-15 Agenda item 1.2
�
� |
JTG 4-5-6-7
� |
� |
2012-11-30 |
|
[ 63 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1
�
� |
WP 5A
� |
� |
2012-11-16 |
|
[ 62 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy to Workin Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1
�
� |
WP 5A
� |
� |
2012-11-16 |
|
[ 61 ]
�
(Rev.1)� |
Liaison statement to ITU-R Working Parties 1A, 4C, 5D, 6A, 7C and 7D (copy to ITU-R Working Party 3L and to ITU-T Study Groups 5, 9 and 15 for information and/or action if any)
�
� |
WPs 5A, 5B and 5C
� |
� |
2012-11-16 |
|
[ 60 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 5B, 5C and 6A (copy to ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF) - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing
�
� |
WP 5A
� |
� |
2012-11-15 |
|
[ 59 ]
�
� |
Liaison statement to Working Party 5A, 1A, 1B, 5C and 6A, ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing
�
� |
WP 5B
� |
� |
2012-11-14 |
|
[ 58 ]
�
� |
Liaison statement to Working Parties 1A and 1B (for information to WPs 4A, 4B, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS))
�
� |
WP 5C
� |
� |
2012-11-14 |
|
[ 57 ]
�
(Rev.1)� |
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems
�
� |
WP 5B
� |
� |
2012-11-09 |
|
[ 56 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)
�
� |
WP 5B
� |
� |
2012-11-09 |
|
[ 55 ]
�
� |
Liaison statement to Working Party 5A (copy to Working Parties 1A and 1B for information) - Further studies on cognitive radio systems
�
� |
WP 5B
� |
� |
2012-11-09 |
|
[ 54 ]
�
� |
Liaison statement - Request for inclusion of Recommendation ITU-R BT.1206 in Annex 4 to Recommendation ITU-R SM.1541
�
� |
WP 6A
� |
� |
2012-11-02 |
|
[ 53 ]
�
� |
Liaison statement - Comment on Recommendation ITU-R SM.2028 - Protection distance calculation between inductive systems and radiocommunication services using frequencies below 30 MHz
�
� |
WP 6A
� |
� |
2012-11-02 |
|
[ 52 ]
�
� |
Liaison statement - Activities related to smart grid
�
� |
JCA-SG&HN
� |
� |
2012-10-30 |
|
[ 51 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1
�
� |
WP 5D
� |
� |
2012-10-16 |
|
[ 50 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1
�
� |
WP 5D
� |
� |
2012-10-16 |
|
[ 49 ]
�
� |
Liaison statement to Study Group 1 (copy to Working Party 1A) - Active services operating above 275 GHz
�
� |
WP 7D
� |
� |
2012-10-10 |
Results:248 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):