International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : CACE : Circulars� Recently posted�-� Search Meeting Documents
ITU-R�CACE� CIR�

ITU-R�CACE

Radiocommunication Assembly and Study Group work

Results:1060 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 �-�Next Next
Circulars

Number
Title Source AI/Question
Date
[ 979 ]
Proposed adoption of 2 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 6 2021-04-06
[ 978 ]
Meeting of Radiocommunication Study Group 3 (Radiowave Propagation) - e-Meeting, 2 July 2021 � Director, BR 2021-04-06
[ 977 ]
Proposed approval of 1 draft revised ITU-R Question � SG 6 2021-06-10
[ 976 ]
Meeting of Radiocommunication Study Group 1 (Spectrum Management) - e-Meeting, 3 June 2021 � Director, BR 2021-03-08
[ 975 ]
Adoption of 1 new and 1 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 1 2021-02-17
[ 974 ]
Meeting of Radiocommunication Study Group 1 (Spectrum Management) - e-Meeting, 3 June 2021 � Director, BR 2021-02-01
[ 973 ]
Adoption of 1 new and 2 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 5 2021-02-01
[ 972 ]
Meeting of Radiocommunication Study Group 6 (Broadcasting Service) - e-Meeting, 26 March 2021 � Director, BR 2021-01-18
[ 971 ]
Meeting of Radiocommunication Study Group 4 (Satellite Services) - e-Meeting, 4 March 2021 � Director, BR 2021-01-05
[ 970 ]
Approval of 1 revised ITU-R Question � SG 6 2021-01-04
[ 969 ]
Adoption of 2 new and 6 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 6 2021-01-04
[ 968 ]
Proposed adoption of 1 draft new and 1 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 1 2020-12-10
[ 967 ]
Meeting of Radiocommunication Study Group 6 (Broadcasting Service) - e-Meeting, 26 March 2021 � Director, BR 2020-12-07
[ 966 ]
Spectrum use and spectrum needs of non-IMT applications/systems of the land mobile service within the frequency band 470-960 MHz in Region 1 � Director, BR 2020-12-02
[ 965 ]
Proposed adoption of 1 draft new and 2 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 5 2020-11-24
[ 964 ]
+Corr.1
Meeting of Radiocommunication Study Group 4 (Satellite Services) - e-Meeting, 4 March 2021 � Director, BR 2020-11-18
[ 963 ]
Spectrum use and spectrum needs of the IMT applications/systems in mobile (except aeronautical mobile) service within the frequency band 470-960 MHz in Region 1 � Director, BR 2020-10-29
[ 962 ]
Proposed approval of 1 draft revised ITU-R Question � SG 6 2020-10-20
[ 961 ]
Proposed adoption of 2 draft new and 6 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 6 2020-10-20
[ 960 ]
Meeting of Radiocommunication Study Group 1 (Spectrum Management), e-Meeting, 3 December 2020 � Director, BR 2020-10-15
[ 959 ]
Adoption of 1 revised ITU-R Recommendation and its simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 5 2020-10-13
[ 958 ]
Meeting of Radiocommunication Study Group 5 (Terrestrial Services) - e-Meeting, 23 November 2020 � Director, BR 2020-10-12
[ 957 ]
Meeting of Radiocommunication Study Group 4 (Satellite Services) - e-Meeting, 6 November 2020 � Director, BR 2020-09-30
[ 956 ]
Meeting of Radiocommunication Study Group 6 (Broadcasting Service) - e-Meeting, 16 October 2020 � Director, BR 2020-09-11
[ 955 ]
Technical characteristics, operational parameters, and protection criteria for sharing and compatibility studies required for WRC-23 � Director, BR 2020-09-08
[ 954 ]
Meeting of Radiocommunication Study Group 5 (Terrestrial Services) - e-Meeting, 23 November 2020 � Director, BR 2020-09-04
[ 953 ]
Proposed adoption of 1 draft revised ITU-R Recommendation and its simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 5 2020-08-04
[ 952 ]
+Corr.1
Meeting of Radiocommunication Study Group 1 (Spectrum Management) - Geneva, 3 December 2020 � Director, BR 2020-07-21
[ 951 ]
Meeting of Radiocommunication Study Group 3 (Radiowave Propagation) - Geneva, 21 August 2020 � Director, BR 2020-07-10
[ 950 ]
+Corr.1
Meeting of Radiocommunication Study Group 4 (Satellite Services) - Geneva, 6 November 2020 � Director, BR 2020-06-22
[ 949 ]
+Corr.1
Meeting of Radiocommunication Study Group 6 (Broadcasting Service) - Geneva, 16 October 2020 � Director, BR 2020-06-01
[ 948 ]
Adoption of 1 revised ITU-R Recommendation and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) - Suppression of 9 ITU-R Recommendations � SG 6 2020-04-27
[ 947 ]
Suppression of 5 ITU-R Questions � SG 6 2020-04-21
[ 946 ]
+Corr.1-2
Meeting of Radiocommunication Study Group 3 (Radiowave Propagation) - Geneva, 19 June 2020, postponed to 21 August 2020 � Director, BR 2020-03-02
[ 945 ]
Proposed adoption of 1 draft revised ITU-R Recommendation simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (PSAA). Proposed suppression of 9 ITU-R Recommendations � SG 6 2020-02-17
[ 944 ]
Proposed suppression of 5 ITU-R Questions � SG 6 2020-02-17
[ 943 ]
+Corr.1
Meeting of Radiocommunication Study Group 1 (Spectrum Management) - Geneva, 8 June 2020, postponed to 3 December 2020 � Director, BR 2020-01-29
[ 942 ]
+Corr.1-3
Meeting of Radiocommunication Study Group 5 (Terrestrial Services) - Geneva, 8 May 2020, postponed to 31 July 2020 � Director, BR 2020-01-29
[ 941 ]
+Corr.1
Meeting of Radiocommunication Study Group 7 (Science Services) - Geneva, 20 April 2020 � Director, BR 2020-01-14
[ 940 ]
Approval of 1 revised ITU-R Recommendation � SG 6 2019-12-16
[ 939 ]
Adoption of 3 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) � SG 5 2019-11-19
[ 938 ]
Approval of 6 revised ITU-R Recommendations � SG 5 2019-11-19
[ 937 ]
Approval of 2 new ITU-R Questions and 10 revised ITU-R Questions - Suppression of 1 ITU-R Question � SG 5 2019-11-19
[ 936 ]
Approval of 1 draft new ITU-R Question and 8 revised ITU-R Questions - Suppression of 7 ITU-R Questions � SG 6 2019-10-23
[ 935 ]
Approval of 1 revised ITU-R Recommendation � SG 3 2019-10-21
[ 934 ]
Approval of 3 revised ITU-R Recommendations � SG 1 2019-10-21
[ 933 ]
Meeting of Radiocommunication Study Group 6 (Broadcasting Service) - Geneva, 14 February 2020 � Director, BR 2019-10-16
[ 932 ]
Adoption of 2 new ITU-R Recommendations and 9 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU-R 1-7 (Procedure for the simultaneous adoption and approval by correspondence) - Suppression of 1 ITU-R Recommendation � SG 6 2019-10-14
[ 931 ]
Proposed approval of 1 draft revised ITU-R Recommendation � SG 6 2019-10-09
[ 930 ]
Approval of 5 revised ITU-R Recommendations � SG 4 2019-09-18
Results:1060 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-12-19