Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 39 ]
�
� |
Analysis of potential interference between spaceborne SARS and fixed wireless active (FWA) systems in the band 5 250-5 350 MHz
�
� |
European Space Agency (ESA)
� |
� |
2001-10-22 |
|
[ 38 ]
�
(Rev.1)� |
Liaison statement to WPs 4B and 9B and to JRG 8A-9B - Revised versions of the access network transport (ANT) standardization plan (issue 4) and work plan (issue 3)
�
� |
ITU-T SG 15
� |
� |
2001-10-22 |
|
[ 37 ]
�
� |
RAST 9 Resolution on Fixed and Broadband Wireless Access
�
� |
Director, BR
� |
� |
2001-10-22 |
|
[ 36 ]
�
� |
Liaison statement to WP 8B and JRG 8A-9B (for information to WP 9D) - WRC-03 Agenda item 1.5, Resolution 736 (WRC-2000) Resolves 1 and 2: Sharing between RLANs in the mobile service, fixed wireless access in the fixed service ?
�
� |
JTG 4-7-8-9
� |
� |
2001-10-22 |
|
[ 35 ]
�
� |
Liaison statement to Working Party 7C and Joint Rapporteur Group 8A-9B (for Information to WP 9D) - Sharing between EES (active) service, RLAN in the mobile service and FWA in the fixed service
�
� |
JTG 4-7-8-9
� |
� |
2001-10-22 |
|
[ 34 ]
�
� |
Sharing constraints between spaceborne active sensors and wireless high speed local area networks in the 5 250-5 350 MHz band
�
� |
European Space Agency (ESA)
� |
� |
2001-10-22 |
|
[ 33 ]
�
� |
Liaison statement to ITU-T Study Group 4 (Q. 3/4, SG 11 (Q. BICC/11), SG 2 and ITU-R Working Parties 4B & 9A, JRG 8A-9B
�
� |
ITU-T SG 13 (Q. 6/13)
� |
� |
2001-10-22 |
|
[ 32 ]
�
� |
Liaison to Study Group 9 - Conclusions of Study Group 9 meeting concerning future status of Joint Rapporteur Group 8A-9B and restructuring of SG 9 related activities
�
� |
SG 8
� |
� |
2001-10-22 |
|
[ 31 ]
�
� |
Liaisons statement to JTG 1-6-8-9 and WPs 6M, 6E, 8A, 8F, 9B and JRG 8A-9B - Technical convergence with respect to terrestrial fixed, mobile and broadcasting interactive multimedia applications an
�
� |
WP 1B
� |
� |
2001-10-22 |
|
[ 30 ]
�
� |
Liaison statement to Joint Rapporteur Group 8A-9B - Development of Quality of Service (QoS) Recommendations
�
� |
WP 4B
� |
� |
2001-10-22 |
|
[ 29 ]
�
� |
Liaison statement to SC-3 of the Special Committee and for information to JRG 8A-9B on regulatory and procedural matters concerning Agenda item 1.6
�
� |
WP 4A
� |
� |
2001-10-22 |
|
[ 28 ]
�
� |
Liaison statement to WP 3M and JRG 8A-9B concerning Average building attenuation relating to the protection of non-GSO MSS feeder links operating in the band 5 150-5 250 MHz from RLAN interference
�
� |
WP 4A
� |
� |
2001-10-22 |
|
[ 27 ]
�
� |
Report of the first meeting (Geneva 18-22 September 2000)
�
� |
Principal Rapporteurs, Joint Rapporteur Group 8A-9B
� |
� |
2001-10-22 |
|
[ 26 ]
�
� |
Liaison statement to ITU-R Study Group 1 and Working Parties 6M, 6E, 7E, 8A, 8F, 9B and JRG 8A-9B - Terrestrial wireless interactive multimedia systems
�
� |
JTG 1-6-8-9
� |
� |
2001-10-22 |
|
[ 25 ]
�
� |
Liaison statement to Working Party 8B (for information to Working Party 7C and JRG 8A-9B) - Preliminary draft CPM text related to Resolves 3 of WRC-2000 Resolution 736, WRC-03 Agenda item 1.5
�
� |
JTG 4-7-8-9
� |
� |
2001-10-22 |
|
[ 24 ]
�
� |
Characteristics of FWA systems based on digital cordless technologies offering data communications
�
� |
Japan
� |
� |
2001-10-22 |
|
[ 23 ]
�
� |
Queuing and priority management methods to support class of service for fixed wireless access (FWA)
�
� |
Japan
� |
� |
2001-10-22 |
|
[ 22 ]
�
� |
Proposed amendments to Recommendation ITU-R F.748 - Radio-frequency arrangements for systems in the fixed service operating in the 25, 26 and 28 GHz bands
�
� |
Japan
� |
� |
2001-10-22 |
|
[ 21 ]
�
� |
Proposal for a preliminary draft new Recommendation - Characteristics of Fixed Wireless Access (FWA) systems to ensure the protection of synthetic aperture radar (SAR) systems in the earth exploration-satellite service (active) in the band 5 250-5 350 MHz
�
� |
Japan
� |
� |
2001-10-22 |
|
[ 20 ]
�
� |
Consideration of the structure of ITU-R Study Group 9
�
� |
Canada
� |
� |
2001-10-22 |
|
[ 19 ]
�
� |
Characteristics of data communications using FWA systems based on ditial cordeless technologies
�
� |
Iran (Islamic Republic of)
� |
� |
2001-10-22 |
|
[ 18 ]
�
� |
Earth Exploration Satellite Services (EESS) (active) and Space Research Services (SRS) (active) sharing the frequency band 5 250-5 350 MHz with Fixed Wireless Access (FWA) systems, RLANs and other wireless access transmitters in the mobile service
�
� |
United States of America
� |
� |
2001-10-22 |
|
[ 17 ]
�
� |
Proposed liaison statement to JTG 1-6-8-9 and JTG 4-7-8-9
�
� |
United States of America
� |
� |
2001-10-22 |
|
[ 16 ]
�
� |
Review of scopes of Working Parties within Study Group 9 - Considerations on merging WP 9B and JRG 8A-9B into a unique WP 8-9W
�
� |
Siemens Information and Communication Networks SpA
� |
� |
2001-10-22 |
|
[ 15 ]
�
� |
Additional information for the PDNR relating to use of frequency range 3 400-3 800 MHz for FWA systems and guidelines for sharing with systems in the radiolocation service
�
� |
Nortel Networks, Canada
� |
� |
2001-10-22 |
|
[ 14 ]
�
� |
Proposal to change PDNR ITU-R F.[T1-3.5 GHz] "Suggested frequency range for FWA systems"- Sharing assessment between systems in the radiolocation service and one FWA system operating in the 3 400-3 700 MHz band
�
� |
United States of America
� |
� |
2001-10-22 |
|
[ 13 ]
�
� |
Proposed modification of Recs. ITU-R F.748-3 and F.749-1 - Radio-frequency channel arrangements for radio-relay systems operating in the 25, 26 and 28 GHz bands and radio-frequency channel arrangements for radio-relay systems operating in the 38 GHz band
�
� |
Canada
� |
� |
2001-10-22 |
|
[ 12 ]
�
� |
Consideration on future status of JRG 8A-9B and review of scopes of Working Parties within Study Group 9
�
� |
France
� |
� |
2001-10-22 |
|
[ 11 ]
�
+Corr.1� |
Proposal for a Recommendation - Frequency block arrangements for fixed wireless access (FWA) systems in the range 10.15-10.3/10.5-10.65 GHz
�
� |
Brazil (Federative Republic of)
� |
� |
2001-10-22 |
|
[ 10 ]
�
� |
Additional information for the working document entitled: General considerations on block-based frequency arrangements
�
� |
Canada
� |
� |
2001-10-22 |
|
[ 9 ]
�
+Add.1� |
Consideration on future status of JRG 8A-9B and review of scopes of Working Parties within Study Group 9
�
� |
Chairman, WP 9B
� |
� |
2001-10-22 |
|
[ 8 ]
�
� |
Liaison statement to Joint Rapporteurs Group 8A-9B and JTG 4-7-8-9 - Sharing in the band 5 250-5 350 MHz between the Earth exploration-satellite service (ACTIVE) allocated in this band and the radio local area networks (RLANS) in the mobile service and fixed wireless access (FWA) systems in tje fixed service
�
� |
WP 7C
� |
� |
2001-10-22 |
|
[ 7 ]
�
� |
Report on the approval of 6 new Recommendations
�
� |
JRG 8A-9B
� |
� |
2001-10-22 |
|
[ 6 ]
�
+Add.1� |
Additional report to the next Working Party 9B meeting (18-26 September 2000)
�
� |
Chairmen, WP 4-9S, 9A, 9B, 9C & 9D
� |
� |
2001-10-22 |
|
[ 5 ]
�
� |
Liaison statement from Working Party 3M to Working Party 4A concerning average building attenuation relating to the protection of non-GSO MSS feeder links operating in the band 5 150-5 250 MHz from RLAN interference
�
� |
WP 3M
� |
� |
2001-10-22 |
|
[ 4 ]
�
� |
Methodology for assessing the required spectrum for generic broadband NWA systems in a public environment
�
� |
Japan
� |
� |
2001-10-22 |
|
[ 3 ]
�
� |
Analysis of potential interference between spaceborne SARS and U-NII devices around 5.3 GHz
�
� |
United States of America
� |
� |
2001-10-22 |
|
[ 2 ]
�
� |
Liaison statement to ITU-T Study Groups 4, 6, 9, 11, 12, 13 and ITU-R Study Groups 4, 8 and 9
�
� |
ITU-T SG 15 (WP 1/15)
� |
� |
2001-10-22 |
|
[ 1 ]
�
(Rev.1)� |
A material of broadcasting FWA system for the FWA Handbook
�
� |
Ericsson
� |
� |
2001-10-22 |
Results:189 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4
� |
Multiple Document Download:�Formats and Languages to be included (when available):