Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1140 ]
�
� |
Proposal for G.sdapp transmitter and receiver parameters
�
� |
LG-Ericsson
� |
Q6/15
� |
2011-01-28 |
|
[ 1139 ]
�
� |
Proposal for G.sdapp general parameters and optical path parameters
�
� |
LG-Ericsson
� |
Q6/15
� |
2011-01-28 |
|
[ 1138 ]
�
� |
Some parameter definitions for G.sdapp
�
� |
LG-Ericsson
� |
Q6/15
� |
2011-01-28 |
|
[ 1137 ]
�
� |
Cross talk penalty calculations for G.sdapp
�
� |
LG-Ericsson
� |
Q6/15
� |
2011-01-28 |
|
[ 1136 ]
�
� |
Commonalities of G.sdapp frequency grid proposals
�
� |
LG-Ericsson
� |
Q6/15
� |
2011-01-28 |
|
[ 1135 ]
�
� |
Impairments in seeded DWDM Systems
�
� |
LG-Ericsson
� |
Q6/15
� |
2011-01-28 |
|
[ 1134 ]
�
� |
Revised Clause 6.1 in G.8271
�
� |
Ericsson
� |
Q13/15
� |
2011-01-28 |
|
[ 1133 ]
�
� |
Comment and suggestion for Up and Down MEPs in G.tpoam
�
� |
Fiberhome Technologies Group
� |
Q10/15
� |
2011-01-28 |
|
[ 1132 ]
�
� |
Proposal for adding new definitions in ITU-T new recommendation L.pon
�
� |
Fiberhome Technologies, MII China
� |
Q18/15
� |
2011-01-28 |
|
[ 1131 ]
�
� |
Comment and suggestion for OLT state machine in G.987.3
�
� |
Fiberhome Technologies Group
� |
Q2/15
� |
2011-01-28 |
|
[ 1130 ]
�
� |
Add topoly usecase in G.8152
�
� |
ZTE Corporation
� |
Q14/15
� |
2011-01-28 |
|
[ 1129 ]
�
� |
Add topoly support in G.8151
�
� |
ZTE Corporation
� |
Q14/15
� |
2011-01-28 |
|
[ 1128 ]
�
� |
Proposal to support logical ONU ID in G.988
�
� |
China Telecom, Ericsson, Huawei
� |
Q2/15
� |
2011-01-28 |
|
[ 1127 ]
�
(Rev.1)� |
Proposal to define IPv6 host config ME in G.988
�
� |
Ericsson, AT&T, Alcatel-Lucent
� |
Q2/15
� |
2011-01-28 |
|
[ 1126 ]
�
� |
Situation 2 in G.680 - Considerations on Approach 1 and Approach 2
�
� |
Italy
� |
Q6/15
� |
2011-01-28 |
|
[ 1125 ]
�
� |
Development of formulae and/or equations to predict the non-linear penalty from available DWDM line segment parameters ( Approach 1 ) to move forward the revision of Recommendation G.680 with respect to the development of Situation 2
�
� |
ISCTI
� |
Q6/15
� |
2011-01-28 |
|
[ 1124 ]
�
� |
Structure and content of the MPLS-TP Recommendations
�
� |
CMCC,CT , CATR
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-01-28 |
|
[ 1123 ]
�
� |
Associated Channel Type for G.tpoam
�
� |
CMCC, CT,CATR
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-01-28 |
|
[ 1122 ]
�
� |
Protection of blinking failures
�
� |
Ericsson
� |
Q9/15
� |
2011-01-27 |
|
[ 1121 ]
�
� |
Addition of Subcarrier Multiplexing (SCM) as one of the line coding schemes in section 7 of G.Sup39
�
� |
Ericsson
� |
Q6/15
� |
2011-01-27 |
|
[ 1120 ]
�
� |
Fiber link asymmetry compensation
�
� |
Ericsson
� |
Q6/15, Q13/15
� |
2011-01-27 |
|
[ 1119 ]
�
� |
Standardization of modulation formats
�
� |
ZTE Corporation
� |
Q6/15
� |
2011-01-27 |
|
[ 1118 ]
�
� |
Required information for non-linear effects estimation for Situation 2 of G.680
�
� |
ZTE Corporation
� |
Q6/15
� |
2011-01-27 |
|
[ 1117 ]
�
� |
Considerations on Maximum spectral excursion and Maximum ripple in G.698.2
�
� |
ZTE Corporation
� |
Q6/15
� |
2011-01-27 |
|
[ 1116 ]
�
� |
Proposals on granularity of the flexible grids in G.694.1
�
� |
ZTE Corporation
� |
Q6/15
� |
2011-01-27 |
|
[ 1115 ]
�
� |
Proposal to include additional RIN-related reference point for G.sdapp
�
� |
ETRI
� |
Q6/15
� |
2011-01-27 |
|
[ 1114 ]
�
� |
Future revision of Recommendation ITU-T G.657
�
� |
Draka Communications
� |
Q5/15
� |
2011-01-26 |
|
[ 1113 ]
�
(Rev.1)� |
Comments on content of clauses 8 and 9 of G.tpoam
�
� |
Ericsson
� |
Q9/15
� |
2011-01-26 |
|
[ 1112 ]
�
� |
Automatic election of RPL and RPL Owner in G.8032
�
� |
Korea (Republic of)
� |
Q9/15
� |
2011-01-26 |
|
[ 1111 ]
�
� |
Event message timer for G.8032 interconnected ring
�
� |
Korea (Republic of)
� |
Q9/15
� |
2011-01-26 |
|
[ 1110 ]
�
� |
Proposed text for end-to-end service resilience between Ethernet ring and MPLS-TP ring
�
� |
Korea (Republic of)
� |
Q9/15
� |
2011-01-26 |
|
[ 1109 ]
�
� |
Proposed modification to G.8031/Y.1342 state transition tables for received far-end request
�
� |
Korea (Republic of)
� |
Q9/15
� |
2011-01-26 |
|
[ 1108 ]
�
� |
Hold-off timer operation in G.808.1
�
� |
Korea (Republic of)
� |
Q9/15
� |
2011-01-26 |
|
[ 1107 ]
�
� |
Proposed modification to G.8031/Y.1342 state transition tables for SD-triggered protection
�
� |
Korea (Republic of)
� |
Q9/15
� |
2011-01-26 |
|
[ 1106 ]
�
� |
40GE&100GE PCS BIP8 monitoring handling requirements in G.798
�
� |
China Telecom, Huawei Technologies
� |
Q9/15
� |
2011-01-25 |
|
[ 1105 ]
�
� |
Proposal about SD triggered protection switching for packet transport technologies
�
� |
China Telecom
� |
Q9/15
� |
2011-01-25 |
|
[ 1104 ]
�
� |
Further consideration of the adaptive Bandwidth Adjustment scheme
�
� |
Ericsson
� |
Q9/15, Q10/15
� |
2011-01-25 |
|
[ 1103 ]
�
� |
Withdrawn: Corrections to Recommendation ITU-T G.8262 (2010)
�
� |
Calnex Solutions
� |
Q13/15
� |
2011-01-24 |
|
[ 1102 ]
�
� |
Specifying a Boundary Clock performance
�
� |
Calnex Solutions
� |
Q13/15
� |
2011-01-24 |
|
[ 1101 ]
�
� |
Clarification proposal to draft Metrics Appendix text in WD107
�
� |
Calnex Solutions
� |
Q13/15
� |
2011-01-24 |
|
[ 1100 ]
�
� |
Germany's Comments and Position to a proposed draft text of a "new" Recommendation on remote management of CPE over broadband networks
�
� |
Germany
� |
Q2/15
� |
2010-10-08 |
|
[ 1099 ]
�
� |
Proposal to specify an transport Ethernet NNI in G.8012
�
� |
Deutsche Telekom
� |
Q10/15
� |
2010-05-24 |
|
[ 1098 ]
�
� |
Optional metro FEC for OTU4
�
� |
Deutsche Telekom
� |
Q11/15
� |
2010-05-24 |
|
[ 1097 ]
�
� |
ODUflex resizing and multi-carrier applications
�
� |
Deutsche Telekom
� |
Q12/15, Q11/15
� |
2010-05-24 |
|
[ 1096 ]
�
� |
VDSL: Time of Day and Analog Channel Delay
�
� |
ASSIA
� |
Q4/15
� |
2010-05-24 |
|
[ 1095 ]
�
� |
OMCI for Configuring ATM and Ethernet pseudowire
�
� |
Huawei
� |
Q2/15
� |
2010-05-21 |
|
[ 1094 ]
�
� |
The revised edition of proposed applications in G.959.1
�
� |
China Unicom Network Communications Group Company
� |
Q6/15
� |
2010-05-21 |
|
[ 1093 ]
�
� |
Revised draft of Recommendation L.teib "Optical cabling shared with multiple operators in buildings"
�
� |
France T�l�com
� |
Q16/15
� |
2010-05-21 |
|
[ 1092 ]
�
� |
Proposal of PTN Equipment Types
�
� |
CMCC
,
Huawei
� |
Q9/15
� |
2010-05-21 |
|
[ 1091 ]
�
� |
Proposal on state transition in G.8031
�
� |
Huawei
� |
Q9/15
� |
2010-05-21 |
Resultats:2390 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):