Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 385 ]
�
� |
Proposed modification to text of working document towards preliminary draft new Report [IMT.MARKET]
�
� |
Japan
� |
229/8
� |
2005-01-21 |
|
[ 384 ]
�
� |
Proposed method to reflect the Questionnaire responses in the Market report
�
� |
Japan
� |
229/8
� |
2005-01-21 |
|
[ 383 ]
�
� |
Initial response to "Questionnaire on Services and Market for the future development of IMT-2000 and systems beyond IMT-2000"
�
� |
Japan
� |
229/8
� |
2005-01-21 |
|
[ 382 ]
�
� |
Proposed modifications to working document towards preliminary draft new Recommendation [IMT.METH]
�
� |
Japan
� |
229/8
� |
2005-01-21 |
|
[ 381 ]
�
� |
Proposed method of market data analysys to obtain input parameter values for the spectrum calculation methodology
�
� |
Japan
� |
229/8
� |
2005-01-21 |
|
[ 380 ]
�
� |
Proposed service grouping for the application of circuit or packet switched traffic calculation and new required capacity calculation for mixed circuit switched traffic
�
� |
Japan
� |
229/8
� |
2005-01-21 |
|
[ 379 ]
�
� |
Proposed modifications to "Working document towards methodology for calculation of spectrum requirements for the future developments of IMT-2000 and systems beyond IMT-2000 from the year 2010 onwards"
�
� |
Finland
� |
229/8
� |
2005-01-20 |
|
[ 378 ]
�
� |
Updated information on the roadmap
�
� |
MOTOROLA, Inc.
,
Ericsson
,
Nokia
,
Siemens
,
TELECOM ITALIA S.p.A.
� |
� |
2005-01-21 |
|
[ 377 ]
�
� |
Proposed shortened version of the mid-term guidelines on the smooth transition of existing mobile networks to IMT-2000 for developing countries
�
� |
Brazil (Federative Republic of)
� |
� |
2005-01-20 |
|
[ 376 ]
�
� |
Sharing requirements and issues related to the use of broadband wireless access systems (BWA) and IMT-2000 systems in the 2 500-2 690 MHz band in adjacent bands and in the same geographical area
�
� |
Brazil (Federative Republic of)
� |
� |
2005-01-20 |
|
[ 375 ]
�
� |
RAT Group approach for spectrum requirements calculation methodology
�
� |
Finland
� |
229/8
� |
2005-01-20 |
|
[ 374 ]
�
� |
Further information on required radio parameters for the spectrum requirement calculation methodology
�
� |
Finland
� |
229/8
� |
2005-01-20 |
|
[ 373 ]
�
� |
Liaison statement - Trial of public access to SG 19 documentation
�
� |
ITU-T SG 9
� |
� |
2005-01-20 |
|
[ 372 ]
�
� |
Studies on interference and coexistence of IMT-2000 with OFDM-based systems in the band 2 500 - 2 690 MHz
�
� |
New Zealand
� |
� |
2005-01-20 |
|
[ 371 ]
�
� |
Initial response to the "Questionnaire on possible terrestrial candidate frequency bands for the future development of IMT-2000 and systems beyond IMT-2000"
�
� |
United States of America
� |
� |
2005-01-19 |
|
[ 370 ]
�
� |
The initial AWF response to the questionnaire on the services and market for the future development of IMT-2000 and systems beyond IMT-2000
�
� |
APT Wireless Forum (AWF)
� |
� |
2005-01-19 |
|
[ 369 ]
�
� |
Possible sharing studies involving non IMT-2000 mobile systems in bands identified for IMT-2000
�
� |
Finland
� |
229/8
� |
2005-01-19 |
|
[ 368 ]
�
� |
Initial response to the "Questionnaire on the Services and Market for the future development of IMT-2000 and systems beyond IMT-2000"
�
� |
United States of America
� |
� |
2005-01-19 |
|
[ 367 ]
�
� |
Broadband mobile / Nomadic access - Working Party 8F Work Plan
�
� |
Israel (State of)
� |
229/8
� |
2005-01-19 |
|
[ 366 ]
�
� |
Proposed modifications towards spectrum calculatioin methodology for future development of IMT-2000 and systems beyond IMT-2000
�
� |
China (People's Republic of)
� |
229/8
� |
2005-01-19 |
|
[ 365 ]
�
� |
Software adaptive antenna technology and its application for the IMT-2000 and systems beyond IMT-2000
�
� |
China (People's Republic of)
� |
229/8
� |
2005-01-19 |
|
[ 364 ]
�
� |
Method of analysing responses to questionnaire on the services and market for the future development of IMT-2000 and systems beyond IMT-2000
�
� |
China (People's Republic of)
� |
229/8
� |
2005-01-19 |
|
[ 363 ]
�
� |
Refinement of radio parameters and classification of Radio access technique groups in the PDNR [IMT.RAD ASPECTs]
�
� |
China (People's Republic of)
� |
229/8
� |
2005-01-19 |
|
[ 362 ]
�
� |
Proposed outline for working document towards a Recommendation/Report [IMT.CANDI]
�
� |
China (People's Republic of)
� |
229/8
� |
2005-01-19 |
|
[ 361 ]
�
� |
Document to make answer towards WG Service/Market Questionnaire on the Services and Market for the future development of IMT-2000 and systems beyond IMT-2000
�
� |
China (People's Republic of)
� |
229/8
� |
2005-01-19 |
|
[ 360 ]
�
� |
Proposed structure of working document towards draft new Report ITU-R M.[IMT.SURVEY]
�
� |
China (People's Republic of)
� |
229/8
� |
2005-01-19 |
|
[ 359 ]
�
� |
Update on Citel activities
�
� |
Citel Rapporteur
� |
229/8
� |
2005-01-17 |
|
[ 358 ]
�
� |
Draft revision of Recommendation ITU-R M.1645 - Framework and overall objectives of the future development of IMT-2000 and systems beyond IMT-2000
�
� |
Australia
� |
229/8
� |
2004-12-22 |
|
[ 357 ]
�
� |
Response to questionnaires on the services and market and possible terrestrial candidate frequency bands for the future development of IMT-2000 and systems beyond IMT-2000
�
� |
Australia
� |
� |
2005-01-06 |
|
[ 356 ]
�
� |
Response to ITU-R WP 8F Questionnaire on the services and market for the future development of IMT-2000 and systems beyond IMT-2000
�
� |
IEEE
� |
� |
2005-01-04 |
|
[ 355 ]
�
� |
Spectrum estimation methodology
�
� |
Telecom New Zealand
� |
� |
2005-01-04 |
|
[ 354 ]
�
� |
Liaison statement - New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan
�
� |
ITU-T SG 15
� |
� |
2004-12-17 |
|
[ 353 ]
�
(Rev.1)� |
Sensitivity analysis for calculation of system capacity required to fulfil mean delay and delay percantile requirements for further development of working document of preliminary draft new Recommendation [IMT.METH]
�
� |
Japan
� |
229/8
� |
2004-12-17 |
|
[ 352 ]
�
� |
New satellite radio transmission technology (RTT) for IMT-2000
�
� |
N/A (no se aplica)
� |
� |
2004-12-17 |
|
[ 351 ]
�
� |
Alternative queueing model and its analysis for required channel capacity calculation for further development of the working document of preliminary draft new Recommendation [IMT.METH]
�
� |
Japan
� |
229/8
� |
2004-12-01 |
|
[ 350 ]
�
(Rev.1)� |
Comments for further development of the working document of preliminary draft new Recommendation [IMT.METH]
�
� |
Japan
� |
229/8
� |
2004-12-01 |
|
[ 349 ]
�
� |
Final list of Participants
Shangai (China), 13-20 October 2004
�
� |
Director, BR
� |
� |
2004-11-08 |
|
[ 348 ]
�
� |
Liaison statement from Working Party 6M to Working Parties 6A, 6E, 8F and ISO TC 204 - Draft new Report ITU-R BT.[Doc.6/122] - Multimedia and data applications for mobile reception
�
� |
N/A (no se aplica)
� |
� |
2004-11-02 |
|
[ 347 ]
�
+Ch.1-10� |
Chairman's Report on the 14th meeting of WP 8F
�
� |
Chairman, WP 8F
� |
� |
2004-11-02 |
|
[ 346 ]
�
� |
Liaison statement to Working Parties 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F, 9A and 9D - PDNR ITU-R SM.[EML] - Index for evaluation of the effect of interference between radio communication networks operating in a shared frequency band
�
� |
WP 1B
� |
� |
2004-10-21 |
|
[ 345 ]
�
� |
Activities related to IMT-2000 and systems beyond IMT-2000 in Region 3
�
� |
Region 3 Rapporteur
� |
� |
2004-10-18 |
|
[ 344 ]
�
� |
ITU-T decisions regarding NGN and the SSG
�
� |
Director, BR
� |
� |
2004-10-14 |
|
[ 343 ]
�
� |
Regional activities for Market and Service
�
� |
Region 3 Coordinator
� |
� |
2004-10-13 |
|
[ 342 ]
�
� |
Correspondence received regarding the update of Recommendation ITU-R M.1457
�
� |
Director, BR
� |
� |
2004-10-12 |
|
[ 341 ]
�
� |
Update on IMT-2000 activities in Region Two
�
� |
Region 2 Special Rapporteur
� |
� |
2004-10-07 |
|
[ 340 ]
�
� |
Annex 4 to Recommendation ITU-R M.1036 concerning frequency arrangements for 2.6 GHz band
�
� |
Brazil (Federative Republic of)
� |
� |
2004-10-01 |
|
[ 339 ]
�
� |
Partial response on the Questionnaire on the Services and Market for the future development of IMT-2000 and systems beyond IMT-2000
�
� |
Brazil (Federative Republic of)
� |
� |
2004-10-01 |
|
[ 338 ]
�
� |
Liaison statement to WPs 8A, 8F and ITU-T Study Group 13 - Design techniques applicable to broadband fixed wireless access (FWA) systems conveying Internet Protocol (IP) packets or asynchronous transfer mode (ATM) cells
�
� |
WP 9B
� |
� |
2004-10-06 |
|
[ 337 ]
�
� |
Liaison statement - Use of the fixed service in the transport network in IMT-2000
�
� |
WP 9B
� |
� |
2004-10-06 |
|
[ 336 ]
�
� |
Supplement 1 to the Handbook on deployment of IMT-2000
�
� |
CDMA Development Group (CDG)
� |
� |
2004-10-06 |
Resultados :1385 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):