Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 644 ]
�
� |
Proposed network limits targeting +/-130 ns
�
� |
Orange (France)
� |
Q13/15
� |
2018-01-16 |
|
[ 643 ]
�
� |
Draft 0 of WTN equipment recommendation
�
� |
Intel Corporation (United States)
� |
Q11/15
� |
2018-01-16 |
|
[ 642 ]
�
� |
Requirements of improving standardization for optical cross connect (OXC)
�
� |
China Mobile Communications Corporation
� |
Q7/15
� |
2018-01-16 |
|
[ 641 ]
�
� |
Proposal for the study of 50G TDM-PON
�
� |
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
FiberHome Technologies Group (China)
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Nokia Shanghai Bell Co. Ltd. (China)
,
ZTE Corporation (China)
� |
Q2/15
� |
2018-01-16 |
|
[ 640 ]
�
(Rev.1)� |
Draft 0 of WTN interface recommendation
�
Q12, 14 and 6/15 were added in Rev.1
� |
China Mobile Communications Corporation
,
Deutsche Telekom AG (Germany)
,
Huawei Technologies Co., Ltd. (China)
� |
Q6/15, Q14/15, Q12/15, Q11/15
� |
2018-01-16 |
|
[ 639 ]
�
� |
G.vlc: Refinement of text for offset-based OFDM PHY
�
� |
Maxlinear Inc (United States)
� |
Q18/15
� |
2018-01-16 |
|
[ 638 ]
�
� |
On Access-In-Home Networking
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q18/15
� |
2018-01-16 |
|
[ 637 ]
�
� |
GNSS-based PRTC test limits
�
� |
Nokia Corporation
� |
Q13/15
� |
2018-01-16 |
|
[ 636 ]
�
� |
Solving GNSS equations
�
� |
Nokia Corporation
� |
Q13/15
� |
2018-01-16 |
|
[ 635 ]
�
� |
Proposal to start the work on the new recommendation on in home cables installation methods
�
� |
Orange (France)
� |
Q16/15
� |
2018-01-16 |
|
[ 634 ]
�
� |
Propose to study 100G, 200G, 400G optical interface specification for 40 km and 80 km applications
�
� |
China Telecommunications Corporation
� |
Q6/15
� |
2018-01-16 |
|
[ 633 ]
�
� |
Considerations on the Requirements of 25Gb/s Channel of WDM for 5G and DCI application
�
� |
China Telecommunications Corporation
� |
Q6/15, Q12/15, Q11/15
� |
2018-01-16 |
|
[ 632 ]
�
(Rev.1)� |
TOW format on the GPS air interface
�
� |
Microsemi Corporation (United States)
,
Nokia Corporation
� |
Q13/15
� |
2018-01-16 |
|
[ 631 ]
�
� |
PTSF_lossSync for single Master configurations
�
� |
Nokia Corporation
� |
Q13/15
� |
2018-01-16 |
|
[ 630 ]
�
� |
G.VLC: Proposal of ToC for VLC Technical Paper
�
� |
Maxlinear Inc (United States)
� |
Q18/15
� |
2018-01-16 |
|
[ 629 ]
�
� |
Switching time terminology issue in G.808.2 Implementers' Guide
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
Q9/15
� |
2018-01-16 |
|
[ 628 ]
�
(Rev.1-2)� |
Proposed Guidance for PTSF_lossSync
�
� |
Nokia Corporation
� |
Q13/15
� |
2018-01-16 |
|
[ 627 ]
�
� |
Examples of design options for PTS
�
� |
Nokia Corporation
� |
Q13/15
� |
2018-01-16 |
|
[ 626 ]
�
� |
Examples of design options for APTS.
�
� |
Nokia Corporation
� |
Q13/15
� |
2018-01-16 |
|
[ 625 ]
�
� |
Consideration on Integrating Performance into G.7703 (ex. G.8080)
�
� |
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
� |
Q14/15, Q12/15
� |
2018-01-16 |
|
[ 624 ]
�
� |
Consideration and Comments in Chapter 15 and 16 of G.7702
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
,
Huawei Technologies Co., Ltd. (China)
� |
Q14/15, Q12/15
� |
2018-01-16 |
|
[ 623 ]
�
� |
eEEC and T-BC class C requirements for eCPRI
�
� |
Nokia Corporation
� |
Q13/15
� |
2018-01-16 |
|
[ 622 ]
�
� |
Proposed addition of 25G Interfaces to Q13 documents
�
� |
Nokia Corporation
,
Nokia USA
� |
Q13/15
� |
2018-01-16 |
|
[ 621 ]
�
� |
Proposal of cooperative DBA and cooperative interface for low-latency services in G.989.3 Amd2
�
� |
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
,
Verizon Communication Corporation (United States)
� |
Q2/15
� |
2018-01-16 |
|
[ 620 ]
�
� |
G.hn2: PLC optimization tool
�
� |
Hisilicon Technologies Co. Ltd.
� |
Q18/15
� |
2018-01-16 |
|
[ 619 ]
�
� |
G.hn2: PLC testing in real homes
�
� |
Hisilicon Technologies Co. Ltd.
� |
Q18/15
� |
2018-01-16 |
|
[ 618 ]
�
� |
New OTN application scenarios and opportunities in metro and access
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
IP Light
,
Ministry of Information and Communication Technology
,
Telecom Italia S.p.A.
,
ZTE Corporation (China)
� |
Q11/15
� |
2018-01-16 |
|
[ 617 ]
�
� |
Smart GNSS and PTP grand master
�
� |
ADVA Optical Networking (United Kingdom)
,
Microsemi Corporation (United States)
� |
Q13/15
� |
2018-01-16 |
|
[ 616 ]
�
� |
G.hn2: Proposals and considerations for power line communication
�
� |
Hisilicon Technologies Co. Ltd.
� |
Q18/15
� |
2018-01-16 |
|
[ 615 ]
�
� |
Attribute of RE reporting related ONU in G.988
�
� |
ZTE Corporation (China)
� |
Q2/15
� |
2018-01-16 |
|
[ 614 ]
�
� |
G.hn2: Constellation transformation for LCM (MLC)
�
� |
Futurewei Technologies US R&D Center (United States)
� |
Q18/15
� |
2018-01-16 |
|
[ 613 ]
�
� |
Progress on ultra-high precision time synchronization for 5G
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
� |
Q13/15
� |
2018-01-16 |
|
[ 612 ]
�
� |
Proposal on synchronization model attributes and their relationship with the synchronization recommendations
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
� |
Q14/15, Q13/15
� |
2018-01-16 |
|
[ 611 ]
�
� |
Proposal on objects of synchronization information model
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
� |
Q14/15, Q13/15
� |
2018-01-16 |
|
[ 610 ]
�
� |
Concerns for quiet window of multi-ODN in G.9807.2
�
� |
ZTE Corporation (China)
� |
Q2/15
� |
2018-01-16 |
|
[ 609 ]
�
(Rev.1)� |
Comments on Link Design Value for Attenuation
�
� |
Orange (France)
,
Prysmian SpA (Italy)
� |
Q5/15
� |
2018-01-16 |
|
[ 608 ]
�
� |
G.mgfast: Retransmission and round trip latency of TDMA and FDMA for a P2MP system
�
� |
Futurewei Technologies US R&D Center (United States)
� |
Q4/15
� |
2018-01-16 |
|
[ 607 ]
�
� |
Structure considerations for common TC specification
�
� |
ZTE Corporation (China)
� |
Q2/15
� |
2018-01-16 |
|
[ 606 ]
�
� |
G.mgfast: LDPC coded modulation as inner FEC
�
� |
Futurewei Technologies US R&D Center (United States)
� |
Q4/15
� |
2018-01-16 |
|
[ 605 ]
�
� |
G.mgfast: On Modulation
�
� |
Futurewei Technologies US R&D Center (United States)
� |
Q4/15
� |
2018-01-16 |
|
[ 604 ]
�
� |
Proposal of modifications to section 9 for G.sup.5GP
�
� |
FiberHome Technologies Group (China)
� |
Q2/15
� |
2018-01-16 |
|
[ 603 ]
�
� |
Proposal to amend G.8131 in line with IETF RFC 8234
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
Q9/15
� |
2018-01-16 |
|
[ 602 ]
�
� |
G.bond, G.fast: Corrigendum to G.998.2 related to TC-CRC in G.9701
�
� |
Metanoia Technologies, Inc.
� |
Q4/15
� |
2018-01-16 |
|
[ 601 ]
�
� |
G.mgfast: Reference Models
�
� |
Futurewei Technologies US R&D Center (United States)
,
Intel Corporation (United States)
,
Swisscom SA
� |
Q4/15
� |
2018-01-16 |
|
[ 600 ]
�
� |
G.mgfast: On the full duplex structure of G.mgfast
�
� |
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q4/15
� |
2018-01-16 |
|
[ 599 ]
�
� |
IPR: For information to ITU-T Q4/15 on an IPR declaration on G.9701
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q4/15
� |
2018-01-16 |
|
[ 598 ]
�
� |
IPR: For information to ITU-T Q4/15 on an IPR declaration on G.993.5
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q4/15
� |
2018-01-16 |
|
[ 597 ]
�
� |
SyncE Clauses [G.8273.4]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2018-01-16 |
|
[ 596 ]
�
� |
Variable Temperature Testing [G.8273.4]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2018-01-16 |
|
[ 595 ]
�
� |
cTE Duration [G8273.4]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2018-01-16 |
Resultats:346 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):