Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1769 ]
�
� |
Considerations about G.metro system capacity for mobile front-hauling.
�
� |
Telecom Italia S.p.A.
� |
Q6/15
� |
2016-02-02 |
|
[ 1768 ]
�
� |
Architecture discussion of G.metro
�
� |
China Unicom
� |
Q6/15
� |
2016-02-02 |
|
[ 1767 ]
�
� |
Synchronization performance monitoring with Probe
�
� |
ADVA Optical Networking
,
China Unicom
� |
Q13/15
� |
2016-02-02 |
|
[ 1766 ]
�
� |
XGS-PON TC considerations on XGS-PON and XG-PON1 co-existence
�
� |
ZTE Corporation
,
China Unicom
� |
Q2/15
� |
2016-02-02 |
|
[ 1765 ]
�
(Rev.1)� |
Proposal of adding PW linear protection to G.8131
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Telecom Italia S.p.A.
� |
Q9/15
� |
2016-02-02 |
|
[ 1764 ]
�
� |
Proposal for NG-PON2 amendment on channel bonding
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-02-02 |
|
[ 1763 ]
�
� |
Comments on G.988 Amendment 2
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-02-02 |
|
[ 1762 ]
�
� |
Comments on G.988 Amendment 1
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-02-02 |
|
[ 1761 ]
�
� |
Proposal of line coding for 25Gb channel rate
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-02-02 |
|
[ 1760 ]
�
� |
Reviews and proposed actions on TD438/WP3 (LS/i/r on request for clarification on IEEE STD 802.1AX)
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2016-02-02 |
|
[ 1759 ]
�
� |
Proposal for external ID tag detection of non-contact type ID tags
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q16/15
� |
2016-02-02 |
|
[ 1758 ]
�
� |
DNI protection method in G.MDSP
�
� |
ZTE Corporation
� |
Q9/15
� |
2016-02-02 |
|
[ 1757 ]
�
� |
Clarifications and further considerations on WD16 of Pisa meeting
�
� |
China Unicom
,
Orange
� |
Q13/15
� |
2016-02-02 |
|
[ 1756 ]
�
� |
Coexistence Solution discussion for XGS-PON
�
� |
China Unicom
� |
Q2/15
� |
2016-02-02 |
|
[ 1755 ]
�
� |
Performance requirements for passive node elements with ID tags
�
� |
China Unicom
� |
Q16/15
� |
2016-02-02 |
|
[ 1754 ]
�
� |
Usage of path-trace option in G.8275.1 profile.
�
� |
Juniper Networks
� |
Q13/15
� |
2016-02-02 |
|
[ 1753 ]
�
� |
Proposals and Discussion Points for Revised Recommendation G.781
�
� |
Huawei Technologies Co., Ltd.
,
China Mobile Communications Corporation
� |
Q13/15
� |
2016-02-02 |
|
[ 1752 ]
�
� |
NGPON2 and XGS-PON: Use of PLOAM to Reboot ONU
�
� |
ADTRAN
� |
Q2/15
� |
2016-02-02 |
|
[ 1751 ]
�
� |
G.8275.2 Editor's Notes Cleanup
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-02-02 |
|
[ 1750 ]
�
� |
Optional TLV for enhanced clock accuracy
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-02-02 |
|
[ 1749 ]
�
� |
G.8272.1 transient response
�
� |
A1 Telekom Austria AG
,
ADVA Optical Networking
,
Deutsche Telekom AG
,
Microsemi Corporation
,
Orange
� |
Q13/15
� |
2016-02-02 |
|
[ 1748 ]
�
� |
G.8272.1 MTIE mask short term
�
� |
A1 Telekom Austria AG
,
ADVA Optical Networking
,
Deutsche Telekom AG
,
Microsemi Corporation
,
Orange
� |
Q13/15
� |
2016-02-02 |
|
[ 1747 ]
�
� |
Heterogeneous CPRI multiplexing using GFP
�
� |
Microsemi Corporation
� |
Q13/15, Q11/15
� |
2016-02-02 |
|
[ 1746 ]
�
� |
Recommendation for Mapping a FlexE Sub-Group into an ODUflex
�
� |
Microsemi Corporation
� |
Q13/15, Q11/15
� |
2016-02-02 |
|
[ 1745 ]
�
� |
Observations to "FG IMT-2020: Report on Standards Gap Analysis"
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/15
� |
2016-02-02 |
|
[ 1744 ]
�
� |
On the details of TIGAV procedure
�
� |
Intel Corporation
� |
Q4/15
� |
2016-02-02 |
|
[ 1743 ]
�
� |
Proposed eoc settings for Annex Q when used with G.993.5
�
� |
Intel Corporation
� |
Q4/15
� |
2016-02-02 |
|
[ 1742 ]
�
� |
On the timeout of L2.1-Entry procedure (G.9701 Amd 1)
�
� |
Intel Corporation
� |
Q4/15
� |
2016-02-02 |
|
[ 1741 ]
�
� |
Use of Frequency, Time traceable flags in G.8275.1 and G.8275.2 telecom profiles
�
� |
Juniper Networks
� |
Q13/15
� |
2016-02-02 |
|
[ 1740 ]
�
� |
Proposed corrigendum to G.9701
�
� |
Intel Corporation
� |
Q4/15
� |
2016-02-02 |
|
[ 1739 ]
�
� |
L.79_Draft revised Recommendation ITU-T L.79_2016-02_OFS comments
�
� |
OFS Fitel, LLC
� |
Q16/15
� |
2016-02-02 |
|
[ 1738 ]
�
� |
Physical and logical node in G.MDSP
�
� |
FiberHome Technologies Group
� |
Q9/15
� |
2016-02-02 |
|
[ 1737 ]
�
(Rev.1)� |
ERP consideration in G.MDSP
�
� |
FiberHome Technologies Group
� |
Q9/15
� |
2016-02-02 |
|
[ 1736 ]
�
� |
Protection method for DNI scenario in G.mdsp
�
� |
FiberHome Technologies Group
� |
Q9/15
� |
2016-02-02 |
|
[ 1735 ]
�
(Rev.1)� |
Proposals for Interconnection use case in Appendix I of G.MDSP
�
� |
FiberHome Technologies Group
� |
Q9/15
� |
2016-02-02 |
|
[ 1734 ]
�
� |
FlexO frame & sub-frame alignment and markers
�
� |
Inphi Corporation
� |
Q11/15
� |
2016-02-02 |
|
[ 1733 ]
�
� |
Proposal of G.RoF system architecture and reference configuration
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
SK Telecom
� |
Q2/15
� |
2016-02-02 |
|
[ 1732 ]
�
� |
Proposed update to G.7711 Annex A UML Modeling Guidelines
�
� |
Alcatel-Lucent USA Inc.
,
Deutsche Telekom AG
� |
Q14/15
� |
2016-02-02 |
|
[ 1731 ]
�
� |
400GBASE-R mapping into OPUflex
�
� |
Inphi Corporation
� |
Q11/15
� |
2016-02-02 |
|
[ 1730 ]
�
� |
Proposed update to G.7711 for new Appendix II and Appendix III
�
� |
Alcatel-Lucent USA Inc.
,
Ciena Corporation
� |
Q14/15
� |
2016-02-02 |
|
[ 1729 ]
�
� |
Dual-rate support in XGS-PON
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Telecommunications Corporation
,
China Unicom
,
FiberHome Technologies Group
,
Futurewei Technologies US R&D Center
,
Huawei Technologies Co., Ltd.
,
Orange
,
ZTE Corporation
� |
Q2/15
� |
2016-02-02 |
|
[ 1728 ]
�
� |
Proposed update to G.7711 Clause 8 and Appendix I
�
� |
Alcatel-Lucent USA Inc.
,
Ciena Corporation
� |
Q14/15
� |
2016-02-02 |
|
[ 1727 ]
�
� |
Proposed update to G.7711 Clause 6 Model Overview
�
� |
Alcatel-Lucent USA Inc.
,
Ciena Corporation
� |
Q14/15
� |
2016-02-02 |
|
[ 1726 ]
�
� |
Values proposed for table B.II.1 of G.XGS-PON
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
� |
Q2/15
� |
2016-02-02 |
|
[ 1725 ]
�
� |
G.hn: Updated text for parts of G.9978Recommendation
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
� |
Q18/15
� |
2016-02-02 |
|
[ 1724 ]
�
� |
Using Standard GFP-T to map CPRI clients into an ODU Carrier - Proposed addition to the draft CPRI-over-OTN Supplement
�
� |
Coriant GmbH & Co. KG
,
Microsemi Corporation
� |
Q13/15, Q11/15
� |
2016-02-01 |
|
[ 1723 ]
�
� |
G.RoF system architecture
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2016-02-01 |
|
[ 1722 ]
�
� |
G.989.2 Background of Upstream OPP Values
�
� |
Alcatel-Lucent USA Inc.
� |
Q2/15
� |
2016-02-01 |
|
[ 1721 ]
�
� |
Proposal for 10G burst profile in G.XGS-PON
�
� |
Broadcom Corporation
,
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2016-02-01 |
|
[ 1720 ]
�
� |
Example of a Link Design Value (LDV) for Chromatic Dispersion
�
� |
Corning Incorporated
,
OFS Fitel, LLC
� |
Q6/15, Q5/15
� |
2016-02-01 |
Resultats:371 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):