Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG15 : R�union�2009-09-28�: Documents Temporaires� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG15� TD-WP1�(2009-09-28)�

UIT-T�SG15

Transport aspects of Access networks and home networking

P�riode d'�tudes 2009

R�union� du 2009-09-28 au 2009-10-09

Lieu : Suisse [Gen�ve]

Autres r�unions : 2012-09-10� 2012-05-11� 2011-12-052011-09-162011-02-142010-10-222010-05-312010-01-15� [ 2009-09-28 ]� 2009-05-152008-12-01

Resultats:150 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3
Documents Temporaires �(WP1) ��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 177-WP1 ]
G.lt Issues List � G.lt Editor Q4/15 2009-05-15
[ 176-WP1 ]
Issues list for ADSL projects � Editor ADSL Q4/15 2009-05-15
[ 175-WP1 ]
Updated G.ploam Issues List � Editor for G.997.1 Q4/15 2009-05-15
[ 174-WP1 ]
Updated G.hs Issues List � Editor for G.994.1 Q4/15 2009-05-15
[ 173-WP1 ]
G.hn: Updated Issues List for G.hn � Editor for G.hn Q4/15 2009-05-15
[ 172-WP1 ]
G.vdsl: Updated Issues List � Editor for G.vdsl Q4/15 2009-05-15
[ 171-WP1 ]
G.vdsl: Proposed corrigendum to G.993.2 Amendment 3 (for consent) � Editor for G.vdsl Q4/15 2009-05-15
[ 170-WP1 ]
(Rev.1)
List of Liaison Statements to / from Q1/15 (May meeting) � Rapporteur Q1/15 Q1/15 2009-05-15
[ 169-WP1 ]
Access Network Transport Standards Overview � Rapporteur Q1/15 Q1/15 2009-05-15
[ 168-WP1 ]
Draft text of G.hntreq "Requirements of transport functions in IP home network" � Editors Q1/15 2009-05-14
[ 167-WP1 ]
Draft Amendment 1 of G.lt (for consent) � Editor G.lt Q4/15 2009-05-14
[ 166-WP1 ]
Meeting report for Q2 interim meeting � Rapporteur, Q2/15 Q2/15 2009-05-14
[ 165-WP1 ]
(Rev.1)
Final list of participants � TSB Q4/15, Q2/15, Q1/15 2009-05-15
[ 164-WP1 ]
Draft G.994.1Amendment 4 (for consent) � Editor for G.hs Q4/15 2009-05-15
[ 163-WP1 ]
Means and impact of GPON power saving. White Paper. � Editors Q2/15 2009-05-14
[ 162-WP1 ]
Initial draft of G.xgpon.4 OMCI for XGPON � Ericsson, Huawei Q2/15 2009-05-14
[ 161-WP1 ]
Living list for G.xgpon.4 � Ericsson, Huawei Q2/15 2009-05-14
[ 160-WP1 ]
LS - ETSI ATTM/TM4 response on ANT Standards Overview � ETSI Q1/15 2009-05-14
[ 159-WP1 ]
Response to COM 15 - LS 32 - E, entitled "Response to BBF liaison entitled Respective domains of responsibilities of TR-69 and OMCI (20 November 2008)" � Broadband Forum Q2/15 2009-05-12
[ 158-WP1 ]
(Rev.1)
WP1/15 interim activities � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2009-05-15
[ 157-WP1 ]
(Rev.1)
Liaison Statements from WP1/15 meeting 15 May 2009 � Chairman WP 1/15 Q4/15, Q2/15, Q1/15 2009-05-15
[ 156-WP1 ]
(Rev.1)
Status of WP1/15 Recommendations 15 May 2009 � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2009-05-15
[ 155-WP1 ]
WP1/15 draft texts for consent and agreement on 15 May 2009 � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2009-05-15
[ 154-WP1 ]
WP1/15 meeting report (15 May 2009) � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2009-05-15
[ 153-WP1 ]
WP1/15 meeting agenda for 15 May 2009 (see: http://1f8a81b9b0707b63-19211.webchannel-proxy.scarabresearch.com/md/T09-SG15-090515-TD/en ) � N/A � 2009-05-15
[ 152-WP1 ]
Meeting Minutes for 14 Apr 2009 Teleconference � Rapporteur, Q2/15 Q2/15 2009-05-04
[ 151-WP1 ]
Meeting Minutes for 17 Mar 2009 Teleconference � Rapporteur, Q2/15 Q2/15 2009-05-04
[ 150-WP1 ]
Meeting Minutes for 17 Feb 2009 Teleconference � Rapporteur, Q2/15 Q2/15 2009-05-04
[ 149-WP1 ]
Meeting Minutes for 27 Jan 2009 Teleconference � Rapporteur, Q2/15 Q2/15 2009-05-04
[ 148-WP1 ]
Meeting Minutes for 16 Jan 2009 Teleconference � Rapporteur, Q2/15 Q2/15 2009-05-04
[ 147-WP1 ]
Draft new Supplement G.Suptp - G-PON PHY/TC Interoperability Test Plan (for agreement) � Editors G.suptp Q2/15 2009-04-22
[ 146-WP1 ]
Withdrawn � N/A � N/A
[ 145-WP1 ]
Liaison communication from IEEE 802.3 to ITU-T Study Group 15 regarding OUI-based extensions to the Slow-Protocol � IEEE 802.3 Working Group Q2/15 2009-04-01
[ 144-WP1 ]
Response on Slow protocols question on a 1Gbit/s point-to-point Ethernet-based optical access system � IEEE 802.3 Working Group Q2/15 2009-04-01
[ 143-WP1 ]
Response to liaison from Q1/15 on Home Networking Topics � ITU-T Study Group 12 Q1/15 2009-03-31
[ 142-WP1 ]
Draft Recommendation G.hntreq � Broadband Forum Q1/15 2009-03-27
[ 141-WP1 ]
Reply to liaison on GPON power conversation � Chairman and vice-chairman Q2/15 2009-03-11
[ 140-WP1 ]
Reply liaison to SG 15 on G.hntreq � ITU-T SG 17 Q1/15 2009-03-04
[ 139-WP1 ]
Liaison to Q4/15 on Retransmission � ETSI ATTM TM6 Q4/15, Q1/15 2009-02-24
[ 138-WP1 ]
Liaison to ITU-T SG15 Q4 on MIMO channel model � ETSI ATTM TM6 Q4/15, Q1/15 2009-02-24
[ 137-WP1 ]
Liaison to ITU-T SG15 Q4 � Home Gateway Initiative Q4/15, Q1/15 2009-02-24
[ 136-WP1 ]
Liaison to ITU-T SG15 Q2 � Home Gateway Initiative Q2/15, Q1/15 2009-02-24
[ 135-WP1 ]
LS on the completion of the 1st version of home network QoS analysis � ITU-T Study Group 16 Q4/15, Q2/15, Q1/15 2009-02-23
[ 134-WP1 ]
Reply LS to ITU-T SG15 on Home Network and ANT Standards Overview � ITU-T Study Group 16 Q4/15, Q2/15, Q1/15 2009-02-23
[ 133-WP1 ]
(Rev.1-2)
Initial list of candidate texts for consent or agreement � TSB Q4/15, Q2/15, Q1/15 2009-02-23
[ 132-WP1 ]
LS on the completion of the 1st version of home network QoS analysis � ITU-T Study Group 16 Q4/15, Q2/15, Q1/15 2009-02-17
[ 131-WP1 ]
Reply LS to Q1/15 on draft recommendation G.hntreq -Generic Home Network Transport Architecture � ITU-T Study Group 13 Q1/15 2009-02-11
[ 130-WP1 ]
RE: Clarification response to the liaison from Q4/13 � ITU-T Study Group 13 Q1/15 2009-02-11
[ 129-WP1 ]
Reply LS on Draft Recommendations G.hnta and G.hntreq � ITU-T Study Group 9 Q1/15 2009-02-11
[ 128-WP1 ]
Reply to Liaison Statements on ANTS (TD27) � ITU-T Study Group 9 Q1/15 2009-02-11
Resultats:150 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-25