Contributions��![Documents / Contributions](/res/templates/dms/images/key.gif) |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 423 ]
�
� |
The choice of Waveshape of surge current through DBS SPDs
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q5/5
� |
2012-03-29 |
|
[ 422 ]
�
� |
Study cases in home networking environment
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q8/5, Q12/5
� |
2012-03-29 |
|
[ 421 ]
�
� |
Proposed structure of study report of lithium battery and proposal for a new work recommendation
�
� |
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q21/5
� |
2012-03-29 |
|
[ 420 ]
�
� |
Proposal on handbook_ infrastructure best practices
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q17/5
� |
2012-03-29 |
|
[ 419 ]
�
� |
Proposal on L.architecture developing form(it should be a recommendation )
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q19/5
� |
2012-03-29 |
|
[ 418 ]
�
� |
Proposal on L.spec DC voltage range
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q19/5
� |
2012-03-29 |
|
[ 417 ]
�
� |
Proposal on L.M&M_infra
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q17/5
� |
2012-03-29 |
|
[ 416 ]
�
� |
Proposal on content of L.architecture
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q19/5
� |
2012-03-29 |
|
[ 415 ]
�
� |
No Load Power and Ripple Voltage Test and Analysis for L.adapterPhase2
�
� |
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q21/5
� |
2012-03-29 |
|
[ 414 ]
�
� |
Reducing SAR in human head by using hands-free accessories
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q3/5
� |
2012-03-29 |
|
[ 413 ]
�
(Rev.1-3)� |
Handbook, Energy Efficiency Solutions for Telecommunication Equipment
�
� |
Cisco Systems, Inc.
� |
Q17/5
� |
2012-03-29 |
|
[ 412 ]
�
(Rev.1)� |
JOINT INDUSTRY INPUT TO ITU-T SG5 Q21/5 BATTERY SIZE STANDARDISATION STUDY
�
� |
Intel Corporation
� |
Q21/5
� |
2012-03-28 |
|
[ 411 ]
�
� |
Revision of the wording of Question 16 for the next study period
�
� |
United States
� |
Q16/5
� |
2012-03-28 |
|
[ 410 ]
�
(Rev.1)� |
Scope of L.adapter Phase 2
�
� |
United States
� |
Q21/5
� |
2012-03-28 |
|
[ 409 ]
�
� |
Scope of L.1000 phase 2
�
� |
Canada
� |
Q21/5
� |
2012-03-28 |
|
[ 408 ]
�
� |
Canadian Regulatory Requirements for Radio Frequency Exposure Compliance of Radiocommunication Apparatus and Installations (POWERPOINT PRESENTATION)
�
� |
Canada
� |
Q3/5
� |
2012-03-28 |
|
[ 407 ]
�
(Rev.1)� |
Canadian Regulatory Requirements for Radio Frequency Exposure Compliance of Radiocommunication Apparatus and Installations
�
� |
Canada
� |
Q3/5
� |
2012-03-28 |
|
[ 406 ]
�
� |
Draft text of Recommendation K.secmiti "Mitigation methods against EM security threats"
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q15/5
� |
2012-03-28 |
|
[ 405 ]
�
� |
Leveraging and enhancing the ICT Environmental sustainability
�
� |
Alcatel-Lucent France
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
,
Nokia Siemens Networks GmbH & Co. KG
,
Telecom Italia S.p.A.
� |
Q23/5, Q22/5, Q21/5, Q19/5, Q18/5, Q17/5
� |
2012-03-28 |
|
[ 404 ]
�
(Rev.1)� |
Comments on K.guide: time averaging scheme
�
� |
National Institute of Information and Communications Technology
� |
Q3/5
� |
2012-03-28 |
|
[ 403 ]
�
(Rev.1)� |
Selection of resolution bandwidth (RBW) of the spectrum analyzer
�
� |
National Institute of Information and Communications Technology
,
NTT DOCOMO, Inc.
� |
Q3/5
� |
2012-03-28 |
|
[ 402 ]
�
� |
Proposed new work item on life-cycle approach for ICT equipment
�
� |
United Nations Environment Programme
� |
Q21/5
� |
2012-03-28 |
|
[ 401 ]
�
(Rev.1)� |
Comments on the Initial Draft of Recommendation K.mag: Evaluation techniques and working procedures for compliance with limits to power-frequency (DC, 50 Hz, and 60 Hz) magnetic field exposure of network operator personnel (TD 853 (GEN/5), September 2011)
�
� |
National Institute of Information and Communications Technology
� |
Q3/5, Q11/5
� |
2012-03-28 |
|
[ 400 ]
�
(Rev.1)� |
Main elements in DC power feeding systems
�
� |
KT Corporation
� |
Q19/5
� |
2012-03-28 |
|
[ 399 ]
�
� |
Proposal of the collaboration work with IEC 37B regarding the standardization of Lightning isolation transformers
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q4/5, Q13/5
� |
2012-03-28 |
|
[ 398 ]
�
(Rev.1)� |
Safety Analysis for DC Remote Power-Feeding System in RRU.
�
� |
China Telecommunications Corporation
� |
Q5/5, Q11/5
� |
2012-03-28 |
|
[ 397 ]
�
(Rev.1-2)� |
Guidance on how to evaluate EM-environment in home networking for the drafting of K.henv.
�
� |
China Telecommunications Corporation
� |
Q8/5
� |
2012-03-28 |
|
[ 396 ]
�
� |
Exposure of RRU protection module in distribution base stations during lightning events
�
� |
Greece
,
Raycap SA
� |
Q6/5, Q5/5
� |
2012-03-27 |
|
[ 395 ]
�
� |
Additional information for K.guide about measurements of the electromagnetic fields from GSM mobile phone base stations
�
� |
Tanzania
� |
Q3/5
� |
2012-03-27 |
|
[ 394 ]
�
(Rev.1)� |
An induction problem on metallic tension member(TM) of optical cable in case of power faults
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q9/5
� |
2012-03-27 |
|
[ 393 ]
�
(Rev.1)� |
An example of lightning damage of telecommunication equipment in customer premises
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q4/5, Q13/5
� |
2012-03-27 |
|
[ 392 ]
�
(Rev.1)� |
Methodology to maximize the efficiency of Solar Photovoltaic energy sources and to reduce the OPEX of telecommunication infrastructure for rural communications in developing countries.
�
� |
India
,
Ministry of Communications and Information Technology
� |
Q22/5
� |
2012-03-27 |
|
[ 391 ]
�
(Rev.1)� |
Inputs for handbook on Requirements for setting up a low cost sustainable telecommunication infrastructure for rural communications in developing countries
�
� |
India
,
Ministry of Communications and Information Technology
� |
Q22/5
� |
2012-03-27 |
|
[ 390 ]
�
� |
Test reports of the isolation reinforced HGW against overvoltages
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q4/5
� |
2012-03-27 |
|
[ 389 ]
�
(Rev.1)� |
Comments on K. guide: Exposure assessment procedure
�
� |
NTT DoCoMo, Inc.
� |
Q3/5
� |
2012-03-26 |
|
[ 388 ]
�
� |
withdrawn
�
� |
N/A
� |
� |
2012-03-23 |
|
[ 385 ]
�
� |
Comments on CATR ID05 Ripple Voltage and No Load Power Test and Investigation for Adapters of ICT Devices
�
� |
Research in Motion
� |
Q21/5
� |
2012-03-23 |
|
[ 384 ]
�
� |
Comments on CATR Contribution ID02 Study on common mode noise immunity test for touch screen ICT devices
�
� |
Research in Motion
� |
Q21/5
� |
2012-03-23 |
|
[ 383 ]
�
� |
Research area in the field of EMF measurement from base stations and its results in Korea
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q3/5
� |
2012-03-16 |
|
[ 382 ]
�
� |
Additional IEC TC106 Comments on ITU-T K.Guide
�
� |
International Electrotechnical Commission
� |
Q3/5
� |
2012-03-12 |
|
[ 381 ]
�
� |
IEC TC106 Comments on ITU-T K.Guide
�
� |
International Electrotechnical Commission
� |
Q3/5
� |
2012-03-09 |
|
[ 380 ]
�
(Rev.1)� |
Draft recommendation L.m&m output of Turin meeting
�
� |
Cisco Systems, Inc.
� |
Q17/5
� |
2012-02-23 |
|
[ 378 ]
�
� |
Cellular network with capacity transfer
�
� |
Russian Federation
� |
Q22/5
� |
2012-01-13 |
|
[ 377 ]
�
� |
Proposals towards Q21/5 Recommendation on L.adapter phase2
�
� |
Telecom Italia
,
Belgacom
,
Deutsche Telekom AG
,
France Telecom Orange
,
Swisscom
,
TDC
,
Telef�nica SA
,
Telekom Austria Group
� |
Q21/5
� |
2011-09-09 |
|
[ 376 ]
�
� |
Draft text of K.44 Annex A, A.2.1 Equipment ports
�
� |
Deutsche Telekom AG
� |
Q4/5
� |
2011-09-09 |
|
[ 375 ]
�
� |
Additional K.44 text to cover signal ports with isolation barriers
�
� |
IEEE
� |
Q4/5
� |
2011-09-09 |
|
[ 374 ]
�
(Rev.1)� |
Selection of quantification methodologies (ORG)
�
� |
Telefon AB - LM Ericsson
� |
Q18/5
� |
2011-09-09 |
|
[ 373 ]
�
� |
Consolidation approach and organizational boundaries (ORG)
�
� |
Telefon AB - LM Ericsson
� |
Q18/5
� |
2011-09-09 |
|
[ 372 ]
�
� |
Clarification of interface between ICT organizations and ICT in organizations (ORG)
�
� |
Telefon AB - LM Ericsson
� |
Q18/5
� |
2011-09-09 |
|
[ 371 ]
�
� |
Clarification of energy concept (ORG)
�
� |
Telefon AB - LM Ericsson
� |
Q18/5
� |
2011-09-09 |
Resultats:520 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11
�-�Suivant
![Next](/res/templates/dms/images/next.gif)
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):