Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 813 ]
�
� |
2048/2049B transcoded 10GbE in ODU2
�
� |
Huawei
� |
11/15
� |
2008-01-31 |
|
[ 812 ]
�
� |
T-MPLS Ring Protection Mechanisms
�
� |
Huawei
,
China Mobile
� |
Q9/15
� |
2008-01-31 |
|
[ 811 ]
�
� |
Proposal on OAM architecture and attribute for EVPLAN services
�
� |
Huawei
,
China Mobile
� |
Q11/15
� |
2008-01-31 |
|
[ 810 ]
�
� |
Proposal on the model and architecture of EVPLAN
�
� |
Huawei
,
China Mobile
� |
Q11/15
� |
2008-01-31 |
|
[ 809 ]
�
� |
Considerations on deployment of T-MPLS Protection Ring
�
� |
Huawei
,
China Mobile
� |
Q9/15
� |
2008-01-31 |
|
[ 808 ]
�
� |
Comments on protocol description and state machine of G.8032
�
� |
Huawei
,
CATR, MII
� |
Q9/15
� |
2008-01-31 |
|
[ 807 ]
�
� |
Comments on the mechanism of G.8032
�
� |
Huawei
,
CATR, MII
� |
Q9/15
� |
2008-01-31 |
|
[ 806 ]
�
� |
40 Gbit/s DP-QPSK parameter update II
�
� |
Nortel
� |
Q6/15
� |
2008-01-31 |
|
[ 805 ]
�
� |
Comments on G.8032 - Ethernet rings protection switching
�
� |
ETRI
� |
Q9/15
� |
2008-01-31 |
|
[ 804 ]
�
� |
Comment on G.8011.4
�
� |
Hitachi
� |
Q11/15
� |
2008-01-31 |
|
[ 803 ]
�
� |
Proposal for VLAN Tagging Filter Data ME in G.984.4
�
� |
Hitachi
� |
Q2/15
� |
2008-01-31 |
|
[ 802 ]
�
� |
Comment on Connectivity Monitoring in G.8011.4
�
� |
Hitachi
� |
Q11/15
� |
2008-01-31 |
|
[ 801 ]
�
� |
Proposal for MAC Priority Queue ME in G.984.4
�
� |
Hitachi
� |
Q2/15
� |
2008-01-31 |
|
[ 800 ]
�
� |
Proposal for Extended VLAN Tagging Operation Configuration Data ME in G.984.4
�
� |
Hitachi
� |
Q2/15
� |
2008-01-31 |
|
[ 799 ]
�
� |
Proposal for treatment of Priority of the Extended VLAN tagging operation configuration data managed entity for G.984.4
�
� |
Hitachi
� |
Q2/15
� |
2008-01-31 |
|
[ 798 ]
�
� |
Proposal for IP precedence capability on the 802.1p mapper service profile managed entity for G.984.4
�
� |
Hitachi
� |
Q2/15
� |
2008-01-31 |
|
[ 797 ]
�
� |
Consideration on IP/MPLS and T-MPLS interworking
�
� |
Fujitsu
� |
Q12/15
� |
2008-01-31 |
|
[ 796 ]
�
� |
Proposed OTN hierarchy for SDH, 10GE, 40GE and 100GE
�
� |
Fujitsu
� |
Q11/15
� |
2008-01-31 |
|
[ 795 ]
�
� |
Consideration on mapping10GbE x 4 mapping into ODU3
�
� |
Fujitsu
� |
Q11/15
� |
2008-01-31 |
|
[ 794 ]
�
� |
Proposal for R-APS frame format in G.8032
�
� |
Fujitsu
� |
Q9/15
� |
2008-01-31 |
|
[ 793 ]
�
� |
Comments and proposed modification for draft G.8132
�
� |
Fujitsu
� |
Q9/15
� |
2008-01-31 |
|
[ 792 ]
�
� |
Comments and proposed modification for the clause 6 and 8 in G.8032
�
� |
Fujitsu
,
NEC
,
Mitsubishi
,
Hitachi
� |
Q9/15
� |
2008-01-31 |
|
[ 791 ]
�
� |
Proposal for a revision of Recommendation G.697
�
� |
Telecom Italia
� |
Q6/15
� |
2008-01-31 |
|
[ 790 ]
�
� |
G.INP, G.ADSL, G.VDSL: Impulsive noise characteristics measured in FT network
�
� |
France Telecom
� |
Q4/15
� |
2008-01-31 |
|
[ 789 ]
�
� |
State transitions tables for TM-SPRing
�
� |
Alcatel-Lucent
� |
Q9/15
� |
2008-01-31 |
|
[ 788 ]
�
� |
Complexity, Scalability, Independency, and Transparency
�
� |
BT
� |
Q12/15
� |
2008-01-31 |
|
[ 787 ]
�
� |
Proposal of PMD value that should be considered in 40Gb/s modulation formats
�
� |
NTT
� |
Q6/15
� |
2008-01-31 |
|
[ 786 ]
�
� |
40 GbE MTTFPA when using 512B/513B transcoding
�
� |
NTT
� |
Q11/15
� |
2008-01-31 |
|
[ 785 ]
�
� |
OTN enhancement accommodating Ethernet clients with bit transparency as well as block code transparency
�
� |
NTT
� |
Q11/15
� |
2008-01-31 |
|
[ 784 ]
�
� |
G.lt: Comments about "Draft text for G.lt" recommendation
�
� |
Telecom Italia
� |
Q4/15
� |
2008-01-31 |
|
[ 783 ]
�
� |
G.vdsl: inclusion of SOS mechanism in new G.993.2 amendment
�
� |
Telecom Italia
� |
Q4/15
� |
2008-01-31 |
|
[ 782 ]
�
� |
Proposed study items for packet based transport technologies for the next study period (2009-2012)
�
� |
NTT
� |
QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15
� |
2008-01-31 |
|
[ 781 ]
�
� |
Proposed update for "Optical Transport Networks & Technologies Standardization Work Plan"
�
� |
NTT
� |
Q3/15
� |
2008-01-31 |
|
[ 780 ]
�
� |
Information on Raman gain distribution measurement technique
�
� |
NTT
� |
Q8/15
� |
2008-01-31 |
|
[ 779 ]
�
� |
Proposal regarding Q8/15 study items for the 2009-2012 study period
�
� |
NTT
� |
Q8/15
� |
2008-01-31 |
|
[ 778 ]
�
� |
Proposal regarding Q5/15 study items for the 2009-2012 study period
�
� |
NTT
� |
Q5/15
� |
2008-01-31 |
|
[ 777 ]
�
� |
Proposal of a draft for a new supplement regarding the general characteristics of optical fibre under actual use conditions
�
� |
NTT
� |
Q5/15
� |
2008-01-31 |
|
[ 776 ]
�
� |
Summary of correspondence activity on a new supplement regarding the general characteristics of an optical fibre under actual use conditions
�
� |
NTT
� |
Q5/15
� |
2008-01-31 |
|
[ 775 ]
�
� |
Additional measurement data for RZ-DQPSK modulation format at 43Gb/s
�
� |
Fujitsu
� |
Q6/15
� |
2008-01-31 |
|
[ 774 ]
�
� |
Proposal on the definition and measurement method of PDL tolerance for modulation format comparison
�
� |
Fujitsu
� |
Q6/15
� |
2008-01-31 |
|
[ 773 ]
�
� |
Proposal on requirements for the transportation of Ethernet client over OTN
�
� |
KDDI
� |
Q11/15
� |
2008-01-31 |
|
[ 772 ]
�
� |
Proposal for Study of Multi-protocol over GEM
�
� |
ZTE
� |
Q2/15
� |
2008-01-31 |
|
[ 771 ]
�
� |
Proposal for Security Aspect of PLOAM messaging in GPON System
�
� |
ZTE
,
China Netcom
� |
Q2/15
� |
2008-01-31 |
|
[ 770 ]
�
� |
G.VDSL2: On-line reconfiguration according PMD and PMS-TC layer
�
� |
ZTE
� |
Q4/15
� |
2008-01-31 |
|
[ 769 ]
�
� |
G.984.4: Management Entity of xDSL OLR function
�
� |
ZTE
� |
Q2/15
� |
2008-01-31 |
|
[ 768 ]
�
� |
Further Proposal for Key Consistency in GPON System
�
� |
ZTE
,
China Netcom
� |
Q2/15
� |
2008-01-31 |
|
[ 767 ]
�
� |
Correction to figure 10-6/G.806
�
� |
Huawei
� |
Q9/15
� |
2008-01-31 |
|
[ 766 ]
�
� |
G.hn: Application-driven Requirements for G.hn
�
� |
Broadcom
,
TI
,
Matsushita
,
Intel
� |
Q4/15
� |
2008-01-31 |
|
[ 765 ]
�
� |
G.hn: PHY level retransmission and acknowledgement
�
� |
CopperGate Communications
� |
Q4/15
� |
2008-01-31 |
|
[ 764 ]
�
� |
G.hn: Media Access Rules for Contention Slots
�
� |
CopperGate Communications
� |
Q4/15
� |
2008-01-31 |
Resultats:289 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):