Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP5D.AR : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP5D.AR� C�

UIT-R�WP5D.AR

Syst�mes IMT

Resultats:1520 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 �-�Suivant Next
Contributions��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 1422 ]
Draft reply liaison statement to Working Party 7B - WRC-27 agenda item 1.15 � United States of America 2024-09-17
[ 1421 ]
Draft reply liaison statement to Working Party 4C - WRC-27 agenda item 1.11 � United States of America 2024-09-17
[ 1420 ]
Draft reply liaison statement to Working Party 4A - WRC-27 agenda item 1.1 � United States of America 2024-09-17
[ 1419 ]
WRC-27 agenda item 1.7 - Annex 2 (7 125-8 400 MHz) � United States of America 2024-09-19
[ 1418 ]
WRC-27 agenda item 1.7 - Annex 1 (4 400-4 800 MHz) � United States of America 2024-09-17
[ 1417 ]
Draft reply liaison statement to Working Party 7C - WRC-27 agenda item 1.19 � United States of America 2024-09-17
[ 1416 ]
Draft reply liaison statement to Working Party 4C - WRC-27 agenda item 1.14 � United States of America 2024-09-17
[ 1415 ]
Draft reply liaison statement to Working Party 4C - WRC-27 agenda item 1.12 � United States of America 2024-09-17
[ 1414 ]
WRC-27 agenda item 1.7 - Annex 3 (14.8-15.35 GHz) � United States of America 2024-09-17
[ 1413 ]
Proposal on text of working document towards the preliminary draft new Report ITU-R M. [IMT-2030.TECH PERF REQ] � ATIS Next G Alliance 2024-09-17
[ 1412 ]
Proposal on test environments for IMT-2030 � ATIS Next G Alliance 2024-09-17
[ 1411 ]
Further information on updated material on "3GPP 5G-SRIT" and "3GPP 5G-RIT" for updating Recommendation ITU-R M.2150 to revision 3 � Alliance for Telecommunications Industry Solutions 2024-09-11
[ 1410 ]
Further information on updated material on LTE-advanced toward revision 7 of Recommendation ITU-R M.2012 � Alliance for Telecommunications Industry Solutions 2024-09-11
[ 1409 ] �
Document withdrawn � N/A � 2024-09-12
[ 1408 ]
Updates to the framework on sharing and compatibility studies under WRC-27 agenda item 1.7 � Brazil (Federative Republic of) 2024-09-05
[ 1407 ]
Working document towards preliminary draft CPM text for WRC-27 agenda item 1.7 � Brazil (Federative Republic of) 2024-09-05
[ 1406 ]
Liaison statement to ITU-R Working Parties 5B and 5D - WRC-27 agenda item 1.7 - Proposed Technical Parameters and Operating Scenarios to Consider in Adjacent Band Studies Involving Radio Altimeters and Wireless Avionics Intra Communications Operating in the 4 200 - 4 400 MHz Frequency Band � International Civil Aviation Organization 2024-08-22
[ 1405 ]
Considerations on draft Recommendation ITU-T SG5 K.DMEI on EMC mitigation for IMT � ATDI 2024-08-09
[ 1404 ]
Cognitive Radio spectrum access and resource management for re-configurable communication networks for future networks � General Authority of communication and Informatics 2024-07-18
[ 1403 ]
Required EMC emission levels in MM wave bands � Netherlands (Kingdom of the) 2024-06-13
[ 1402 ]
Proposal to the working document towards a preliminary draft new Recommendation / Report ITU-R S.[MITIGATION MEASURES] from Working Party 4A � Nokia Corporation 2024-06-13
[ 1401 ]
Proposal to the preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ] from Working Party 7D � Nokia Corporation 2024-06-13
[ 1400 ]
Initial observations on the candidate technology towards revision-3 of IMT-2020 � 5G India Forum 2024-06-13
[ 1399 ]
Inputs to WP 5D#46 (JUNE 2024) on coverage, mobility, sustainability, AI related capabilities towards working Document 5D/77 on M.[TPR] for IMT-2030 � Reliance Infocomm Ltd. 2024-06-13
[ 1398 ]
Inputs to WP 5D#46 (June 2024) on Annex 2 towards working Document 5D/77 on M.[TPR] for IMT-2030 � Reliance Infocomm Ltd. 2024-06-13
[ 1397 ]
Proposed draft reply liaison statement to Working Party 4C on WRC-27 agenda item 1.13 � Reliance Infocomm Ltd. , Bharti Airtel Limited 2024-06-13
[ 1396 ]
Proposal on working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] � India (Republic of) 2024-06-13
[ 1395 ]
Proposal for the working document towards a preliminary draft revision of Report ITU-R M.2527-0 � India (Republic of) 2024-06-13
[ 1394 ]
Proposal for the working document towards a preliminary draft revision of Report ITU-R M.2480 � India (Republic of) 2024-06-13
[ 1393 ]
Proposal towards sharing and compatibility studies of IMT systems for WRC-27 agenda item 1.7 � India (Republic of) 2024-06-13
[ 1392 ]
Proposal for the working document towards preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] � Qualcomm, Inc. 2024-06-13
[ 1391 ]
Proposal for the working document towards preliminary draft new Report ITU-R M.[IMT-2030.EVAL] � Qualcomm, Inc. 2024-06-13
[ 1390 ]
Proposals for the working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] � Telefon AB - LM Ericsson 2024-06-13
[ 1389 ]
Considerations of test environments for the evaluation of IMT-2030 � Telefon AB - LM Ericsson 2024-06-13
[ 1388 ]
Considerations for developing new ITU-R report of Technology Performance Requirements (TPR) for IMT-2030 and beyond � Electronics and Telecommunications Research Institute (ETRI) 2024-06-12
[ 1387 ]
Considerations for developing new ITU-R report of Technology Performance Requirements (TPR) for IMT-2030 and beyond � Electronics and Telecommunications Research Institute (ETRI) 2024-06-12
[ 1386 ]
UWB spectrum: the need of reliable spectrum for short-range wireless technologies development � Access Partnership Limited 2024-06-13
[ 1385 ]
Proposed system characteristics to be considered for Earth Exploration-Satellite Service (EESS) (space-to-earth) in the band 8 025 8 400 MHz under agenda item 1.7 � Egypt (Arab Republic of) 2024-06-13
[ 1384 ]
List of assignments that the administration of Arab Republic of Egypt had notified to the bureau and that are within the frequency band subject to WRC-27 agenda item 1.13 � Egypt (Arab Republic of) 2024-06-13
[ 1383 ]
Draft working document on sharing and compatibility studies of IMT systems in the frequency band 7 125-8 400 MHz � Egypt (Arab Republic of) 2024-06-13
[ 1382 ]
Draft working document on sharing and compatibility studies of IMT systems in the frequency band 4 400-4 800 MHz � Egypt (Arab Republic of) 2024-06-13
[ 1381 ]
Draft document on sharing and compatibility studies of IMT systems in the frequency band 14.8-15.35 GHz � Egypt (Arab Republic of) 2024-06-13
[ 1380 ]
Calculation of pfd limits for protection of terrestrial IMT under WRC-27 AI 1.13 � Germany (Federal Republic of) 2024-06-13
[ 1379 ]
Proposed draft reply liaison statement to Working Party 4C concerning WRC-27 agenda item 1.13 � Japan 2024-06-13
[ 1378 ]
Proposed working document on frequency arrangements used for terrestrial IMT systems in the frequency ranges between 694/698 MHz and 2.7 GHz concerning WRC-27 agenda item 1.13 � Japan 2024-06-13
[ 1377 ]
Proposals on working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27 � Japan 2024-06-13
[ 1376 ]
Proposal on a draft reply liaison statement to Working Parties 4C and 7B for WRC-27 agenda items 1.12, 1.13, 1.14, 1.15 � Japan 2024-06-13
[ 1375 ]
Proposal to finalize the work on draft revision of Recommendation ITU-R M.1036-7 � Japan 2024-06-13
[ 1374 ]
Proposals to working document of document IMT-2030/2 "Process: submission, evaluation process and consensus building for IMT-2030" � Japan 2024-06-13
[ 1373 ]
Proposals to working document towards a preliminary draft new Recommendations ITU-R M.[IMT-2020.UNWANT.BS] and M.[IMT-2020.UNWANT.MS] � Japan 2024-06-13
Resultats:1520 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2025-01-08