Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP7D : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP7D� C�

UIT-R�WP7D

Radioastronomie

Resultats:222 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 �-�Suivant Next
Contributions��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 122 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7 � WP 7B AI1.7 2017-11-01
[ 121 ]
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� � WP 7A 2017-11-01
[ 120 ]
Liaison statement to Working Party 1B (copy to working Parties 1A, 5B, 5C, 6A and 7D for information) - Studies on "Wireless Power Transmission (WPT)" � WP 7A Q210/1 2017-11-01
[ 119 ]
+Ann.1-6
Report of the meeting of Working Party 7D (Geneva, 24-27 October 2017) � Chairman, WP 7D 2017-11-01
[ 118 ]
Final list of participants Working Pafty 7D (24 - 27 October 2017) � Director, BR 2017-10-27
[ 117 ]
List of documents issued (Document 7D/89 - 7D/117) � BR Study Groups Department 2017-10-23
[ 116 ]
Modifications to the list of radio telescopes capable of operating in the frequency band 10.6-10.7 GHz in Annex 2 to Recommendation ITU-R RS.2066-0 � Committee on Radio Astronomy Frequencies 2017-10-17
[ 115 ]
Update to Annex 7 to Report ITU-R A.2259 - Characteristics of radio quiet zones: protection of the IRAM 30 m radio telescope in Spain � Committee on Radio Astronomy Frequencies 2017-10-17
[ 114 ]
Draft reply liaison statement to Task Group 5/1 on the apportionment of interference between services � Committee on Radio Astronomy Frequencies AI1.13 2017-10-17
[ 113 ]
Working document towards a preliminary draft new Report ITU-R RA.[COEXISTENCE] - Coexistence between the radio astronomy service and radiolocation service applications in the frequency band 76-81 GHz (Resolution 759 (WRC-15)) � Committee on Radio Astronomy Frequencies 2017-10-17
[ 112 ]
Proposal for avoiding RAS interference by all harmonics of the satellite downlink emissions-WRC-19 agenda item 1.9.2 � Japan AI1.9.2 2017-10-17
[ 111 ]
Draft liaison statement to Working Party 4C - Unwanted emissions in the RAS band from space-to-Earth transmissions from MSS satellites � Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science , Committee on Radio Astronomy Frequencies AI1.8 2017-10-16
[ 110 ]
Chapter 4 of working document towards a preliminary draft new Report ITU-R RA.[COEXISTENCE] - Coexistence between radio astronomy service and radiolocation service applications in the frequency band 76-81 GHz (Resolution 759 (WRC-15)) � CG Coexistence RAS-VRad 2017-10-17
[ 109 ]
Sharing between short duration NGSO satellites and the radio astronomy service in the 150.05-153 MHz and 406.1-410 MHz frequency bands � Netherlands (Kingdom of the) AI1.7 2017-10-16
[ 108 ]
Parameters needed for the registration of distributed radio astronomy systems - The experience with registering LOFAR � Netherlands (Kingdom of the) Q252/7 2017-10-12
[ 107 ]
Working document towards a preliminary draft new Report ITU-R RA.[COEXISTENCE] - Coexistence between radio astronomy service and radiolocation service applications in the frequency band 76 -81 GHz � United States of America 2017-10-06
[ 106 ]
Reconsideration of RR. No. 4.6 � Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science 2017-09-28
[ 105 ]
Compatibility between radio astronomy and fixed service operations in the spectrum band 275-450 GHz � Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science Q257/7, AI1.15 2017-09-26
[ 104 ]
Reply liaison statement to Working Party 1A on propagation characteristics in the frequency range 275 450 GHz (copy to Working Parties 5A, 5C, 7C and 7D for information) � WPs 3J, 3K and 3M 2017-09-06
[ 103 ]
Reply liaison statement to Working Party 7C (copy to Working Parties 7A, 7B and 7D) - WRC-23 agenda item 2.2 regarding EESS (active) around the 45 MHz frequency region � WP 3L 2017-09-06
[ 102 ]
Reply liaison statement to Working Party 7D (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, and 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services � WP 1A 2017-07-10
[ 101 ]
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15 � WP 1A AI1.15 2017-07-10
[ 100 ]
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7A, 7B, 7C & 7D on Resolution 63 (Rev. WRC-12) � WP 1A 2017-07-10
[ 99 ]
Reply liaison statement to Working Party 1A (copy for information to Working Parties 3L, 5A, 5B, 5C, 6A, 7A and 7D) - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services � WP 1C 2017-07-07
[ 98 ]
Liaison statement to Working Party 3K on propagation characteristics in the 275-450 GHz band (copy to Working Parties 3J, 3M, 5A, 5C, 7C and 7D for information) � WP 1A AI1.15 2017-07-05
[ 97 ]
Liaison statement to Working Party 7C and 7D (copy to Working Party 5A) - Foreign Object Debris (FOD) detection system operating in the band 92-100 GHz � WP 5B 2017-06-22
[ 96 ]
Liaison statement to Working Parties 1A and 7C (copy to Working Parties 3K, 5A and 7D for information) - WRC-19 agenda item 1.15 � WP 5C AI1.15 2017-06-01
[ 95 ]
Liaison statement to Working Parties 1A and 7C (copy to Working Parties 5C and 7D for information) - WRC-19 agenda item 1.15 � WP 5A AI1.15 2017-06-05
[ 94 ]
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5D, 7B,7C, 7D and Task Group 5/1 - WRC-19 agenda item 1.14 � WP 5C AI1.14 2017-06-05
[ 93 ]
Liaison statement to Working Party 7D on WRC-19 agenda item 1.6 � WP 4A AI1.6 2017-05-24
[ 92 ]
Liaison statement to working Parties 5A, 5C, 5D, 7C and 7D (copy to Working Parties 4B and 3M) - WRC-19 agenda item 9.1, issue 9.1.9 � WP 4A AI9.1 2017-05-19
[ 91 ]
Liaison statement to Working Party 5B (copy to Working Party 7D for information) - Studies related to WRC-19 agenda item 1.8 � WP 4C AI1.8 2017-05-16
[ 90 ]
Note to Chairman of Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Microsoft EXCEL implementation of clutter loss and building entry loss calculations � Chairmen, SG 3 and WPs 3J, 3K & 3M 2017-04-13
[ 89 ]
+Ann.1-2
Report of the meeting of Working Party 7D (Geneva, 5-11 April 2017) � Chairman, WP 7D 2017-04-11
[ 88 ]
Final list of participants: Working Party 7D (Geneva, 4-11 April 2017) � Director, BR 2017-04-11
[ 87 ]
Liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Preparations for WRC-19 agenda item 1.13 � Chairman, WP 6A AI1.13 2017-04-05
[ 86 ]
List of documents issued (Documents 7D/55 - 7D/86) � BR Study Groups Department 2017-04-04
[ 85 ]
Liaison statement to Working Parties 1A and 1B, and to their Rapporteur Group on WPT issues, to Working Party 5B, and to the Study Group 1 Rapporteur Group on liaison with CISPR and Rapporteur to CISPR on WPT issues (copy for information to Working Parties 5A, 5C, 7A & 7D) - Liaison between ITU-R and CISPR � WP 6A 2017-04-03
[ 84 ]
Liaison statement to Working Parties 1A, 1B and their Rapporteur Group on WPT issues (copy for information to Working Parties 5A, 5B, 5C, 7A & 7D) - Developments on Wireless Power Transfer under Question ITU-R 210-3/1 and issue 9.1.6 of WRC-19 � WP 6A Q210-3/1 2017-04-03
[ 83 ]
Liaison statement to Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Guidance on the use of ITU-R P-Series Recommendations for interference prediction and sharing studies under WRC-19 agenda item 1.13 � WPs 3K, 3J & 3M AI1.13 2017-03-31
[ 82 ]
Reply liaison statement to Working Party 1A (copy to Working Parties 5A, 5C, 7C and 7D for information) - Request for input related to WRC-19 agenda item 1.15 � WPs 3J, 3K and 3M AI1.15 2017-03-31
[ 81 ]
Working document towards a preliminary draft revision of Question ITU-R 145-2/7 - Technical factors involved in the protection of radioastronomical observations � United States of America Q145-2/7 2017-03-27
[ 80 ]
Information paper - Assessing the range of interference of 20-40 GHz airport body scanners � United States of America 2017-03-27
[ 79 ]
Working document towards a preliminary draft revision of Question ITU-R 226-1/7 - Frequency sharing between the radio astronomy service and other services in bands above 70 GHz � United States of America Q226-1/7 2017-03-27
[ 78 ]
Draft liaison statement to Working Party 5C - Radio astronomy sites operating in the bands 21.4 - 22 GHz and 23.6 - 24 GHz in Region 2 � Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science 2017-03-06
[ 77 ]
Draft liaison statement to Working Party 1A (copy to Working Party 5C for information) - Technical and operational characteristics of radio astronomy systems in the spectrum band 275-450 GHz � Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science 2017-03-06
[ 76 ]
Revision of Question ITU-R 226-2 (2012) � Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science 2017-03-06
[ 75 ]
Reply liaison statement to ITU-R Working Party 1B (copy to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means... � WP 5D 2017-02-24
[ 74 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands... � WP 1B 2016-12-14
[ 73 ]
Liaison statement to Working Parties 1A, 5B, 5C, 6A, 7A and 7D - Studies on "Wireless power transmission (WPT)" � WP 1B Q210/1 2016-12-14
Resultats:222 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2019-07-22