Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 374 ]
�
� |
Reply liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4C, 5A, 5D, 7B, 7C and 7D) - Clarification of HAPS characteristics and studies
�
� |
WP 5C
� |
AI1.14
� |
2018-06-05 |
|
[ 373 ]
�
� |
Reply liaison statement to Working Party 5D (copy for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - Information on Adaptive Transmit Power Control (ATPC)
�
� |
WP 5C
� |
AI1.14
� |
2018-06-05 |
|
[ 372 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (copy for information to Working Parties 3M and 5B) - Progress on WRC-19 agenda item 1.14
�
� |
WP 5C
� |
AI1.14
� |
2018-06-05 |
|
[ 371 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 7B, 7C and 7D - Revision of Recommendation ITU-R F.1245
�
� |
WP 5C
� |
� |
2018-05-31 |
|
[ 370 ]
�
� |
Reply liaison statement to Working Parties 1A and 4C (copy for information to Working Parties 4A, 5D, 7B, and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations
�
� |
WPs 5A, 5B, 5C
� |
� |
2018-05-31 |
|
[ 369 ]
�
� |
Liaison statement to Working Parties 4A and 4C - Draft documents including draft CPM text related to WRC-19 agenda item 9.1, issue 9.1.4 - Resolution 763 (WRC-15)
�
� |
WP 5B
� |
� |
2018-05-30 |
|
[ 368 ]
�
� |
Reply liaison statement to ITU-R Working Party 5C (copy for information to Working Parties 3M, 4A, 4C, 5B, 5D, 7B, 7C, 7D and Task Group 5/1) - WRC-19 agenda item 1.14
�
� |
WP 5A
� |
AI1.14
� |
2018-05-25 |
|
[ 367 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 1/1 to ITU-R Study Groups 1, 4 and 5 on collaboration
�
� |
ITU-D SG 1
� |
� |
2018-05-24 |
|
[ 366 ]
�
� |
Reply liaison statement to Working Party 4C regarding proposed changes to preliminary draft new Recommendation ITU-R RS.[EESS_SAR-RNSS]
�
� |
WP 7C
� |
� |
2018-05-22 |
|
[ 365 ]
�
� |
Reply liaison statement to Working Party 4C - Working document towards a preliminary
draft new Report ITU-R M.[RAS-COMPAT] - Unwanted emissions in the RAS band from space-to-Earth transmissions from MSS Satellites
�
� |
WP 7D
� |
� |
2018-05-21 |
|
[ 364 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - Status of WRC-19 agenda item 1.7
�
� |
WP 7B
� |
AI1.7
� |
2018-05-21 |
|
[ 363 ]
�
� |
Liaison statement from ITU-D Study Group 2 on disaster relief use cases
�
� |
ITU-D SG 2
� |
� |
2018-05-21 |
|
[ 362 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations
�
� |
WP 7B
� |
� |
2018-05-17 |
|
[ 361 ]
�
� |
Liaison statement to Working Parties 4C and 5B - Availability of radio frequency spectrum for mobile satellite communications
�
� |
International Maritime Organization
,
International Mobile Satellite Organization
� |
� |
2018-05-14 |
|
[ 360 ]
�
� |
Liaison statement to Working Party 7B (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7
�
� |
WP 6A
� |
AI1.7
� |
2018-05-10 |
|
[ 359 ]
�
� |
Reply liaison statement to ITU-R Working Party 7A on UTC (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems�
regarding broadcasting systems
�
� |
WP 6B
� |
� |
2018-05-04 |
|
[ 358 ]
�
� |
Preliminary position on WRC-19 Agenda
�
� |
World Meteorological Organization
� |
� |
2018-05-03 |
|
[ 357 ]
�
� |
"Conclusion" section of the draft CPM texts on the 9 issues under WRC-19 agenda item 9.1
�
� |
Chairman, CPM
� |
� |
2018-04-30 |
|
[ 356 ]
�
� |
Liaison statement to Working Party 1C (copy for information to Working Party 4C) - Preliminary draft new Recommendation ITU-R S.[GUIDELINES HARMFUL INTERFERENCE REPORTING] - Guidelines for reporting harmful interference to GSO satellite networks
�
� |
WP 4A
� |
� |
2018-03-21 |
|
[ 355 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations
�
� |
WP 4A
� |
� |
2018-03-21 |
|
[ 354 ]
�
� |
Reply liaison statement to Working Party 5C (copy for information to Working Parties 3M, 4C, 5A, 5D, 7B, 7C and 7D) - WRC-19 agenda item 1.14
�
� |
WP 4A
� |
AI1.14
� |
2018-03-21 |
|
[ 353 ]
�
� |
Liaison statement to Working Party 5B (copy for information to Working Parties 4B, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and 3M) - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15)
�
� |
WP 4A
� |
AI1.10
� |
2018-03-21 |
|
[ 352 ]
�
� |
Liaison statement to Working Party 5B (copy for information to Working Parties 4C and 7B) - Draft documents including draft CPM text related to WRC-19 agenda item 9.1, issue 9.1.4 - Resolution 763 (WRC-15)
�
� |
WP 4A
� |
AI9.1
� |
2018-03-21 |
|
[ 351 ]
�
� |
Liaison statement to Worikng Parties 4B, 4C, 5A, 5C, 7B and 7C - Studies relating to the use of the frequency bands 17.7-19.7 GHz (space-to-Earth) and 27.5-29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service under WRC-19 agenda item 1.5
�
� |
WP 4A
� |
AI1.5
� |
2018-03-21 |
|
[ 350 ]
�
� |
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Draft documents including draft CPM text related to WRC-19 agenda item 1.6, Resolution 159 (WRC-15)
�
� |
WP 4A
� |
AI1.6
� |
2018-03-21 |
|
[ 349 ]
�
� |
Reply liaison statement to Working Party 4C on WRC-19 agenda item 7, Issues H and I - Comments related to additional RR Appendix 4 data elements for non-GSO systems as regards RNSS systems
�
� |
WP 4A
� |
AI7
� |
2018-03-21 |
|
[ 348 ]
�
� |
Liaison statement to Working Party 4C - Application of coordination arc in the Ka band under WRC-19 agenda item 7, Issue B
�
� |
WP 4A
� |
� |
2018-03-21 |
|
[ 347 ]
�
� |
Liaison statement to Working Parties 4C, 5A, 7B and 7C - Studies relating to the bringing into use of frequency assignments to all non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services
�
� |
WP 4A
� |
� |
2018-03-21 |
|
[ 346 ]
�
� |
Recommendation ITU-R F.699-8 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to 86 GHz
�
� |
SG 5
� |
� |
2018-03-06 |
|
[ 345 ]
�
� |
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� regarding FSS/MSS/BSS
�
� |
WP 4B
� |
� |
2018-02-23 |
|
[ 344 ]
�
� |
Liaison statement to Working Party 4B (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding FSS/BSS
�
� |
WP 4A
� |
� |
2018-02-20 |
|
[ 343 ]
�
+Ann.1-19� |
Report on the meeting of Working Party 4C (Geneva, 13-20 February 2018)
�
� |
Chairman, WP 4C
� |
� |
2018-02-20 |
|
[ 342 ]
�
� |
Final list of participants - Working Party 4C (Geneva, 13-20 February 2018)
�
� |
Director, BR
� |
� |
2018-02-20 |
|
[ 341 ]
�
� |
Recommendation ITU-R P.681-10 - Propagation data required for the design of Earth-space land mobile telecommunication systems
�
� |
SG 3
� |
� |
2018-02-16 |
|
[ 340 ]
�
� |
List of documents issued (Documents 4C/261 - 4C/340)
�
� |
BR Study Groups Department
� |
� |
2018-12-02 |
|
[ 339 ]
�
� |
Liaison statement reply to ITU-R Working Party 5C (copied for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - WRC-19 agenda item 1.14
�
� |
WP 5D
� |
AI1.14
� |
2018-12-02 |
|
[ 338 ]
�
� |
Liaison statement - New ITU-T Study Group 13 terms and definitions
�
� |
ITU-R CCV, ITU-T SCV
� |
� |
2018-02-09 |
|
[ 337 ]
�
� |
Liaison statement to Working Party 4C - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries
�
� |
WP 5D
� |
� |
2018-02-07 |
|
[ 336 ]
�
� |
Working document towards a preliminary draft new Report ITU-R M.[RAS-COMPAT] - Unwanted emissions in the RAS band from space-to-Earth transmissions from MSS satellites
�
� |
Austria
,
Germany (Federal Republic of)
,
Netherlands (Kingdom of the)
� |
AI1.8
� |
2018-02-06 |
|
[ 335 ]
�
� |
Working document towards a preliminary draft new Report ITU-R M.[GMDSS-SATREG] - Introduction of additional mobile-satellite service systems into the GMDSS (WRC-19 agenda item 1.8)
�
� |
Austria
,
Germany (Federal Republic of)
,
Netherlands (Kingdom of the)
,
Switzerland (Confederation of)
� |
AI1.8
� |
2018-02-06 |
|
[ 334 ]
�
� |
Working document towards draft CPM text for WRC-19 agenda item 1.8
�
� |
Austria
,
Committee on Radio Astronomy Frequencies
,
Czech Republic
,
Netherlands (Kingdom of the)
� |
AI1.8
� |
2018-02-06 |
|
[ 333 ]
�
� |
OOB/Unwanted emissions from IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect to systems in the mobile-satellite service in the frequency band above 1 525 MHz
�
� |
Thuraya Telecommunications Company
� |
� |
2018-02-06 |
|
[ 332 ]
�
� |
Working document towards draft CPM text - WRC-19 agenda item 1.8
�
� |
Canada
� |
AI1.8
� |
2018-02-06 |
|
[ 331 ]
�
� |
Working document towards a preliminary draft new Report ITU-R M.[MSS & IMT L-BAND COMPATIBILITY] - Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect to systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz
�
� |
Thuraya Telecommunications Company
� |
� |
2018-02-06 |
|
[ 330 ]
�
� |
Proposed revisions to working document towards a preliminary draft new Report ITUR- M.[GMDSS-SATREG] - Introduction of additional mobile-satellite service systems into the GMDSS (WRC-19 agenda item 1.8)
�
� |
Inmarsat Plc.
� |
AI1.8
� |
2018-06-02 |
|
[ 329 ]
�
� |
Proposed revisions to draft CPM text related to agenda item 1.8
�
� |
Inmarsat Plc.
� |
AI1.8
� |
2018-06-02 |
|
[ 328 ]
�
� |
Proposed updates to the working document towards a preliminary draft new [RECOMMENDATION OR REPORT] ITU-R M.[MSS&IMT-ADVANCED SHARING]
�
� |
Inmarsat Plc.
� |
AI9.1
� |
2018-02-06 |
|
[ 327 ]
�
� |
Proposed revisions to the working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.1
�
� |
Inmarsat Plc.
� |
AI9.1
� |
2018-06-02 |
|
[ 326 ]
�
� |
Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect to systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz
�
� |
EMEA Satellite Operator's Association (ESOA)
� |
� |
2018-02-06 |
|
[ 325 ]
�
� |
Proposal for drafting CPM text and modification for working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-Advanced sharing] under agenda item 9.1, issue 9.1.1
�
� |
China (People's Republic of)
� |
AI9.1
� |
2018-02-06 |
Resultats:474 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):