Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 337 ]
�
� |
Report on the Correspondence Group on fixed service use and future trends
�
� |
Chairman, CG FS-tends
� |
� |
2014-10-17 |
|
[ 336 ]
�
� |
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 6A and ITU-T Study Group 15) - Considerations on the G.9700 power spectral density (PSD) limit mask
�
� |
WP 7D
� |
� |
2014-10-17 |
|
[ 335 ]
�
� |
Editorial update to Recommendation ITU-R F.1703
�
� |
Chairman, WP 5C
� |
� |
2014-10-17 |
|
[ 334 ]
�
� |
Liaison statement to Working Party 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (for information)
�
� |
WP 7B
� |
� |
2014-10-16 |
|
[ 333 ]
�
� |
Liaison statement to Working Party 5C - Sharing analyses of wideband EESS SAR transmissions with stations in the fixed, mobile, amateur and amateur-satellite services operating in the frequency bands 8 700-9 300 MHz and 9 900-10 500 MHz - WRC-15 agenda item 1.12
�
� |
WP 7C
� |
� |
2014-10-15 |
|
[ 332 ]
�
� |
Draft revision Recommendation ITU-R F.758-5 "System parameters and consideration in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference"
�
� |
Russian Federation
� |
� |
2014-10-15 |
|
[ 331 ]
�
� |
Progress Report of Joint Correspondence Group activity
�
� |
Chairman, JCG 5A/5C
� |
� |
2014-10-13 |
|
[ 330 ]
�
� |
Liaison statement on current status on draft Recommendation ITU-T K.mhn and issues related to coexistence of wired telecommunications and radio communication
�
� |
ITU-T SG 9
� |
� |
2014-10-09 |
|
[ 329 ]
�
� |
Reply liaison statement to Working Party 5C - Revisions of Recommendations ITU-R F.1247-3, ITU-R F.1249-3 and ITU-R F.1509-2
�
� |
WP 7B
� |
� |
2014-10-06 |
|
[ 328 ]
�
� |
Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)
�
� |
ITU-T SG 9
� |
� |
2014-09-30 |
|
[ 327 ]
�
� |
Liaison statement to Working Party 5C - The channel characteristics of HF propagation paths through the auroral region
�
� |
WP 3L
� |
� |
2014-09-15 |
|
[ 326 ]
�
� |
Liaison statement to Working Party 5C - Response to Working Party 5C regarding propagation models for planning and interference assessment involving fixed service links in bands above 50 GHz
�
� |
WPs 3J, 3K and 3M
� |
� |
2014-09-12 |
|
[ 325 ]
�
� |
Liaison statement to Working Party 5C - WRC-15 agenda item 1.6
�
� |
WP 4A
� |
� |
2014-09-10 |
|
[ 324 ]
�
� |
Liaison statement to Working Party 5C - WRC-15 agenda item 1.9.1
�
� |
WP 4A
� |
� |
2014-09-10 |
|
[ 323 ]
�
(Rev.1)� |
Results of the 21th RAG meeting
�
� |
Chairman, SG 5
� |
� |
2014-08-27 |
|
[ 322 ]
�
� |
Reply liaison statement informing about MEF 22.1 and MEF 22.1.1 - Mobile backhaul implementation agreement
�
� |
Director, BR
� |
� |
2014-08-20 |
|
[ 321 ]
�
� |
Reply liaison statement to Working Party 5C - WRC-15 agenda item 1.10
�
� |
WP 4C
� |
� |
2014-07-17 |
|
[ 320 ]
�
� |
Reply liaison statement to Working Party 5C - WRC-15 agenda item 1.9.2
�
� |
WP 4C
� |
� |
2014-07-17 |
|
[ 319 ]
�
� |
Reply liaison statement to Working Party 5C - Further development of the Recommendation/Report aimed at assisting coordination between RDSS/MSS and the fixed service in the 2 483.5-2 500 MHz band
�
� |
WP 4C
� |
� |
2014-07-17 |
|
[ 318 ]
�
� |
Liaison statement to Working Parties 4A and 5C - WRC-15 agenda item 1.8
�
� |
WP 4C
� |
� |
2014-06-30 |
|
[ 317 ]
�
� |
Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 316 ]
�
� |
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - ITU-R interest in K series Recommendations
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 315 ]
�
� |
Liaison statement to the broadband forum (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Specifications and performance of cabling intended for use with G.fast
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 314 ]
�
� |
Liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 4C, 5A, 5B, 5C, 6A and 7D) - Considerations on the G.9700 power spectral density (PSD) limit mask
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 313 ]
�
� |
Liaison statement to ITU-T Study Groups 5 and 15 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Excessive levels of radio frequency noise in the environment
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 312 ]
�
� |
Liaison statement to ITU-T Study Group 15 and CENELEC (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Ensuring that telecommunication systems that depend on the use of radio frequencies have been properly assessed for compatibility and the avoidance of harmful interference
�
� |
WP 1A
� |
� |
2014-06-20 |
|
[ 311 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
�
� |
WP 1B
� |
� |
2014-06-19 |
|
[ 310 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D (copy to Working Parties 1B and 1C) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
�
� |
WP 1A
� |
� |
2014-06-19 |
|
[ 309 ]
�
� |
Liaison statement to Working Party 5B (copy for information to Working Parties 5A and 5C) - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
�
� |
WP 1C
� |
240/5
� |
2014-06-17 |
|
[ 308 ]
�
� |
Liaison statement to Working Parties 5B and 5C (copy for information to Working Party 3L) - WRC-15 agenda item 1.4 - Status of studies and draft CPM text for WRC-15 agenda item 1.4
�
� |
WP 5A
� |
� |
2014-06-04 |
|
[ 307 ]
�
� |
Liaison statement to Working Party 4C (copied for information to Working Parties 3M, 4A, 4B, 5C, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
�
� |
WP 5A
� |
� |
2014-06-03 |
|
[ 306 ]
�
� |
Liaison statement to ITU-T FG Innovation, TSAG and Study Group 17 (copy for information to ITU-R Study Group 5, Working Parties 5B, 5C and 5D) - New standardization activities for the International Telecommunication Union - Standardization Sector (ITU-T)
�
� |
WP 5A
� |
� |
2014-06-03 |
|
[ 305 ]
�
� |
Liaison statement on coexistence of wired telecommunications with radiocommunication systems (reply to COM5-LS45)
�
� |
ITU-T SG 9
� |
� |
2014-06-02 |
|
[ 304 ]
�
� |
Liaison statement on additional information on regional regulations related to coexistence of wired telecommunication with radiocommunication systems
�
� |
ITU-T SG 9
� |
� |
2014-06-02 |
|
[ 303 ]
�
� |
Liaison statement to Working Parties 1A, 5A, 5C and 5D regarding development of a Report on out-of-band emissions in the 2 700-2 900 MHz frequency band from service operating below 2 690 MHz
�
� |
WP 5B
� |
� |
2014-05-30 |
|
[ 302 ]
�
� |
Reply liaison statement to Working Party 5C - Potential impact to the fixed service from automotive collision avoidance radar in adjacent frequency bands 76-77 GHz and 77-81 GHz
�
� |
WP 5B
� |
� |
2014-05-30 |
|
[ 301 ]
�
� |
Liaison statement to Working Party 1B (copied to Working Parties 5B, 5C and 5D for information) - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
�
� |
WP 5A
� |
� |
2014-05-30 |
|
[ 300 ]
�
� |
Liaison statement to ITU-T Study Groups 5, 9, 15 and ITU-R Working Party 1A (copied for information to ITU-R Working Parties 5A, 5C, 5D and 6A) - Liaison statement on coexistence of wired telecommunications with radiocommunication systems
�
� |
WP 5B
� |
� |
2014-05-30 |
|
[ 299 ]
�
� |
Liaison statement to Working Party 1B (copied for information to ITU-R Working Parties 5A, 5C and 5D) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]
�
� |
WP 5B
� |
� |
2014-05-30 |
|
[ 298 ]
�
+Ann.1-9� |
Report of the thirteenth meeting of Working Party 5C (Geneva, 19-28 May 2014)
�
� |
Chairman, WP 5C
� |
� |
2014-05-28 |
|
[ 297 ]
�
� |
Final list of participants - Working Party 5C (Geneva, 19-28 May 2014)
�
� |
Director, BR
� |
� |
2014-05-28 |
|
[ 296 ]
�
� |
Liaison statement on Recommendation ITU-R F.1105-3 (Fixed wireless systems for disaster mitigation and relief operations)
�
� |
ITU-T FG DR&NRR
� |
� |
2014-05-26 |
|
[ 295 ]
�
� |
Reply liaison statement - Potential impact to the fixed service from automotive collision avoidance radar in adjacent frequency bands 76-77 GHz and 77-81 GHz
�
� |
WP 5A
� |
� |
2014-05-23 |
|
[ 294 ]
�
� |
List of documents issued (Documents 5C/235 - 5C/294)
�
� |
BR Study Groups Department
� |
� |
2014-05-16 |
|
[ 293 ]
�
� |
Liaison statement to Working Party 5C (WRC-15 agenda item 1.12) - Sharing studies between the earth exploration-satellite service (active) and the fixed service in the frequency bands 8 700-8 750 MHz and 10 000-10 500 MHz
�
� |
WP 7C
� |
� |
2014-05-15 |
|
[ 292 ]
�
� |
Reply liaison statement to Working Party 5C - Revisions of Recommendations ITU-R F.1247-3, ITU-R F.1249-3 and ITU-R F.1509-2
�
� |
WP 7B
� |
� |
2014-05-13 |
|
[ 291 ]
�
� |
Reply liaison statement to Working Party 5C - Proposed revision to Recommendation ITU-R SA.1154 - Updating of characteristics of current digital ENG systems and their usage/deployment
�
� |
WP 7B
� |
� |
2014-05-13 |
|
[ 290 ]
�
� |
Satellite component of the VDES for agenda item 1.16 (WRC-15)
�
� |
France
,
European Space Agency
� |
� |
2014-05-12 |
|
[ 289 ]
�
� |
Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
�
� |
Japan
� |
� |
2014-05-12 |
|
[ 288 ]
�
� |
Proposed revision of working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial [mobile] broadband systems
�
� |
Japan
� |
253/5, 247/5
� |
2014-05-12 |
Resultats:437 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):