Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 313 ]
�
(Rev.1)� |
Modification of Chaper 7.5 for Q. BNG Pool
�
� |
China Unicom
,
Huawei Technologies Co., Ltd.
� |
Q5/11
� |
2015-11-18 |
|
[ 312 ]
�
(Rev.1)� |
Modification of Chaper 7.4 for Q. BNG Pool
�
� |
China Unicom
,
Huawei Technologies Co., Ltd.
� |
Q5/11
� |
2015-11-18 |
|
[ 311 ]
�
(Rev.1)� |
Modification of Chaper 7.3 for Q. BNG Pool
�
� |
China Unicom
,
Huawei Technologies Co., Ltd.
� |
Q5/11
� |
2015-11-18 |
|
[ 310 ]
�
(Rev.1)� |
Modification of Chaper 7.2 for Q. BNG Pool
�
� |
China Unicom
,
Huawei Technologies Co., Ltd.
� |
Q5/11
� |
2015-11-18 |
|
[ 309 ]
�
(Rev.1)� |
Modification of Chaper 7.1 for Q. BNG Pool
�
� |
China Unicom
,
Huawei Technologies Co., Ltd.
� |
Q5/11
� |
2015-11-18 |
|
[ 308 ]
�
� |
Proposal to extend/enhance/introduce protocol capabilities in case of heterogeneous network environment to support priority calling
�
� |
Ministry of Communications and Information Technology Dept. of T
� |
Q3/11
� |
2015-11-18 |
|
[ 307 ]
�
(Rev.1)� |
Proposed updates of ToR of Q9/11 for the next study period
�
� |
Korea (Rep. of)
� |
Q9/11
� |
2015-11-18 |
|
[ 306 ]
�
� |
Proposal for new work item on "Managed P2P communications: Multimedia streaming signalling requirements"
�
� |
Korea (Rep. of)
� |
Q9/11
� |
2015-11-18 |
|
[ 305 ]
�
� |
Proposal to start a new draft Recommendation for signalling requirements of SDN-based access networks with media independent management capabilities
�
� |
Korea (Rep. of)
� |
Q7/11
� |
2015-11-18 |
|
[ 304 ]
�
� |
X.mp2p-pamp: Proposed modifications from clause 2 to clause 8
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/11
� |
2015-11-18 |
|
[ 303 ]
�
(Rev.1)� |
X.mp2p-orcp: Proposed modifications from clause 1 to clause 6
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/11
� |
2015-11-18 |
|
[ 302 ]
�
� |
X.mp2p-pamp: Proposed modifications for clause 9
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/11
� |
2015-11-18 |
|
[ 301 ]
�
� |
Proposal for a baseline text of the procedure for appointing a conformity assessment ITU-T technical expert
�
� |
Ghana
� |
CASC/11
� |
2015-11-17 |
|
[ 300 ]
�
� |
Proposal for interface requirements in draft Q.PVMapping
�
� |
China Unicom
,
Huawei Technologies Co., Ltd.
� |
Q4/11
� |
2015-11-17 |
|
[ 299 ]
�
� |
Proposal for modifications and addition on Summary, Definition, Conventions, and other related clauses in draft Q.PVMapping
�
� |
China Unicom
,
Huawei Technologies Co., Ltd.
� |
Q4/11
� |
2015-11-17 |
|
[ 298 ]
�
� |
Proposal for adding new clause on overview of PVMapping in draft Q.PVMapping
�
� |
China Unicom
,
Huawei Technologies Co., Ltd.
� |
Q4/11
� |
2015-11-17 |
|
[ 297 ]
�
� |
Proposal for content of chapter 7.1 in Q.IPv6ProBB
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q6/11
� |
2015-11-17 |
|
[ 296 ]
�
� |
Proposal for security consideration in Q.IPv6ProMM
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q6/11
� |
2015-11-17 |
|
[ 295 ]
�
� |
Proposal for adding cloud computing interoperability testing methodology in draft Recommendation Q.fw.cloud.iop
�
� |
China Telecommunications Corporation
� |
Q14/11
� |
2015-11-16 |
|
[ 294 ]
�
� |
Proposal on description related to cloud computing interfaces in draft Recommendation Q.fw.cloud.iop
�
� |
China Telecommunications Corporation
� |
Q14/11
� |
2015-11-16 |
|
[ 293 ]
�
� |
Proposal to remove Cloud service measurement index in draft Recommendation Q.FW.cloud.iop
�
� |
China Telecommunications Corporation
� |
Q14/11
� |
2015-11-16 |
|
[ 292 ]
�
� |
Proposal to update overview of Cloud Computing interoperability testing in draft Recommendation FW.cloud.iop
�
� |
China Telecommunications Corporation
� |
Q14/11
� |
2015-11-16 |
|
[ 291 ]
�
� |
The proposals for service performance parameters of Q.CCP
�
� |
China Telecommunications Corporation
� |
Q13/11
� |
2015-11-13 |
|
[ 290 ]
�
� |
The proposals for service availability parameters of Q.CCP
�
� |
China Telecommunications Corporation
� |
Q13/11
� |
2015-11-13 |
|
[ 289 ]
�
� |
The proposals for parameters of resources operating and controlling of Q.CCP
�
� |
China Telecommunications Corporation
� |
Q13/11
� |
2015-11-13 |
|
[ 288 ]
�
� |
The proposals for monitoring parameters of network of Q.CCP
�
� |
China Telecommunications Corporation
� |
Q13/11
� |
2015-11-13 |
|
[ 287 ]
�
� |
The proposals for parameters of virtual resources of Q.CCP
�
� |
China Telecommunications Corporation
� |
Q13/11
� |
2015-11-13 |
|
[ 286 ]
�
� |
The proposals for parameters of physical resources of Q.CCP
�
� |
China Telecommunications Corporation
� |
Q13/11
� |
2015-11-13 |
|
[ 285 ]
�
(Rev.1)� |
Proposal to advance the draft Recommendation ITU-T Q.MNP_TS "Conformance test plan for Number Portability requirements defined by ITU-T Q.Suppl.4"
�
� |
Ministry of Telecom and Mass Communications of the Russian Federation
� |
Q11/11
� |
2015-11-12 |
|
[ 284 ]
�
� |
Update to Q.CSO
�
� |
Huawei Technologies Co., Ltd.
� |
Q4/11
� |
2015-11-10 |
|
[ 283 ]
�
(Rev.1)� |
Consent - draft new Recommendation ITU-T Q.39_SI_BC_Net_TS_Part2 v.1 [3GPP Release 10] "IMS specific use of SIP and SDP. Conformance testing. Part 2: TSS and TP"
�
� |
A1 Telekom Austria AG
� |
Q11/11
� |
2015-11-09 |
|
[ 282 ]
�
(Rev.1)� |
Consent - draft new Recommendation ITU-T Q.39_SI_BC_Net_TS_Part1 V.1 [3GPP Release 10] "IMS specific use of SIP and SDP. Conformance testing. Part 1: PICS"
�
� |
A1 Telekom Austria AG
� |
Q11/11
� |
2015-11-09 |
|
[ 281 ]
�
(Rev.1)� |
Consent - Draft new Recommendation ITU-T Q.34_SI_BC_Req v.1 [3GPP Release 10] "IP multimedia call control protocol based on the session initiation protocol and the session description protocol. Basic call. Requirements for user side and network side (V10.20.0)"
�
� |
A1 Telekom Austria AG
� |
Q2/11
� |
2015-11-09 |
|
[ 280 ]
�
(Rev.1)� |
Contribution-Propose to add signalling requirements for Southbound Interface in Q.SBAN
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
� |
Q4/11
� |
2015-11-06 |
|
[ 279 ]
�
(Rev.1)� |
Contribution-Propose to add overview of signalling requirements in Q.SBAN
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
� |
Q4/11
� |
2015-11-06 |
|
[ 278 ]
�
(Rev.1)� |
Proposals on Study on Counterfeit, Substandard and Unauthorised ICT devices in Africa Region
�
� |
Ministry of Communication and ICT, Benin
� |
Q8/11
� |
2015-10-26 |
|
[ 277 ]
�
� |
Information on combating counterfeit equipment in Guinea
�
� |
Minist�re Postes et T�l�com; Guin�e
� |
Q8/11
� |
2015-10-26 |
Resultados :137 documentos Resultados :�
Anterior�-�
1 -
2 -
3
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):