Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 128 ]
�
� |
Proposed edits/amendments to document 4C/77, Annex 7
�
� |
United States
� |
� |
2024-09-27 |
|
[ 127 ]
�
� |
Contribution toward working document regarding WRC-27 agenda item 1.11 - Non-geostationary satellites operating space-to-space links in mobile-satellite service (MSS) allocations in the frequency bands 1 518-1 544 MHz, 1 545-1 559 MHz, 1 610-1 645.5 MHz, 1 646.5-1 660 MHz, 1 670-1 675 MHz and 2 483.5-2 500 MHz
�
� |
United States
� |
AI1.11
� |
2024-09-27 |
|
[ 126 ]
�
� |
MSS system characteristics relevant to WRC-27 agenda item 1.7 studies
�
� |
United States
� |
AI1.7
� |
2024-09-27 |
|
[ 125 ]
�
� |
Updates to draft revision of Recommendation on new non-GSO RNSS system in the 1 164-1 215 MHz and 1 559-1 610 MHz frequency bands
�
� |
United States
� |
� |
2024-09-27 |
|
[ 124 ]
�
� |
Proposed draft reply liaison statement to Working Party 7C on EESS-RNSS matters - RNSS-Related Comments on [Working Document Toward a] Preliminary draft new Report ITU-R RS.[AGG_EESS_SAR-RNSS]
�
� |
United States
� |
� |
2024-09-27 |
|
[ 123 ]
�
� |
Proposed Revisions to preliminary draft revision of Report ITU-R M.2305-0 - Consideration of aggregate radio frequency interference event potentials from multiple Earth exploration-satellite service systems on radionavigation-satellite service receivers operating in the 1 215-1 300 MHz frequency band
�
� |
United States
� |
� |
2024-09-27 |
|
[ 122 ]
�
� |
Proposed revisions to reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7
�
� |
Australia
� |
AI1.7
� |
2024-09-26 |
|
[ 121 ]
�
� |
Views regarding the topics to be addressed during Working Parties 4C and 5D joint meeting
�
� |
Germany
� |
AI1.13
� |
2024-09-25 |
|
[ 120 ]
�
� |
Proposed draft revision of Recommendation ITU-R M.1787-5 - Description of systems and networks in the radionavigation-satellite service (space-to-Earth and space-to-space) and technical characteristics of transmitting space stations operating in the bands 1 164-1 215 MHz, 1 215-1 300 MHz and 1 559-1 610 MHz
�
� |
Korea (Rep. of)
� |
� |
2024-09-26 |
|
[ 119 ]
�
� |
Consideration of issues raised from the Working Party 5D related to WRC-27 agenda item 1.13
�
� |
Korea (Rep. of)
� |
AI1.13
� |
2024-09-26 |
|
[ 118 ]
�
� |
Proposed revisions to working document regarding WRC-27 agenda item 1.11
�
� |
Korea (Rep. of)
� |
AI1.11
� |
2024-09-26 |
|
[ 117 ]
�
� |
Studies and elements for the working document regarding WRC-27 agenda item 1.12
�
� |
Norway
,
Canada
� |
AI1.12
� |
2024-09-25 |
|
[ 116 ]
�
� |
Reply liaison statement to Working Party 7B (copy to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7C and 7D for information) - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.15 on lunar communications
�
� |
WP 7A
� |
AI1.15
� |
2024-09-23 |
|
[ 115 ]
�
� |
Preliminary studies on protection requirement of IMT TN from MSS under WRC-27 agenda item 1.13
�
� |
France
� |
AI1.13
� |
2024-09-21 |
|
[ 114 ]
�
� |
Studies on development of regulatory measures to limit the unauthorized operations of non-geostationary-satellite orbit (non-GSO) Earth stations in the fixed-satellite service (FSS) and mobile-satellite service (MSS) and associated issues related to the service area of non-GSO FSS and MSS satellite systems
�
� |
IAFI
� |
� |
2024-09-20 |
|
[ 113 ]
�
� |
Draft liaison statements to Working Party 4A - WRC-27 agenda item 1.5
�
� |
Kazakhstan
� |
AI1.5
� |
2024-09-20 |
|
[ 112 ]
�
� |
Characteristics of GSO MSS networks for compatibility studies under WRC-27 agenda items 1.13 and 1.14
�
� |
United Kingdom
� |
AI1.14, AI1.13
� |
2024-09-17 |
|
[ 111 ]
�
� |
Suggested timeline for the collaborations between Working Parties 4C and 5D on preparatory studies for WRC-27 agenda item 1.13
�
� |
Chair, WP 4C and Acting Chair, WP 5D
� |
AI1.13
� |
2024-09-13 |
|
[ 110 ]
�
� |
Information on joint sessions between Working Parties 4C and 5D in October 2024 to facilitate the ITU-R preparatory studies for WRC-27 agenda item 1.13
�
� |
Chair, WP 4C and Acting Chair, WP 5D
� |
AI1.13
� |
2024-09-13 |
|
[ 109 ]
�
� |
Modifications to the structure of Working Party 4C
�
� |
Chair, WP 4C
� |
� |
2024-09-09 |
|
[ 108 ]
�
� |
ITU-R Handbook on satellite communications
�
� |
Editor of Satellite Communications Handbook
� |
� |
2024-09-05 |
|
[ 107 ]
�
� |
Liaison statement to ITU-R working parties 4C and 5B - WRC-27 agenda item 1.13 - Proposed Technical Parameters to Consider in Studies for Possible New Allocations to the Mobile-Satellite Service Involving Aeronautical Systems Operating in the 960-1 215 MHz Frequency Band
�
� |
International Civil Aviation Organization
� |
AI1.13
� |
2024-08-22 |
|
[ 106 ]
�
� |
Liaison statement on creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators
�
� |
ITU-T SG3
� |
� |
2024-07-19 |
|
[ 105 ]
�
� |
Information on the preparation of texts for the draft CPM Report to WRC-27
�
� |
Chair, CPM-27
� |
� |
2024-07-09 |
|
[ 104 ]
�
� |
Liaison statement to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - WRC-27 agenda item 1.7
�
� |
WP 5D
� |
AI1.7
� |
2024-07-08 |
|
[ 103 ]
�
� |
Reply liaison statement to Working Parties 4C and 7B for WRC-27 agenda items 1.12, 1.13, 1.14 and 1.15 - Technical and operational characteristics of HIBS for sharing and compatibility studies in preparation for WRC-27
�
� |
WP 5D
� |
AI1.15, AI1.14, AI1.13, AI1.12
� |
2024-07-08 |
|
[ 102 ]
�
� |
Reply liaison statement to Working Party 4C - Work related to WRC-27 agenda item 1.13
�
� |
WP 5D
� |
AI1.13
� |
2024-07-08 |
|
[ 101 ]
�
� |
Reply liaison statement to Working Party 7C (copy to Working Parties 4C, 5A, 5D and 7D for information) - Beam Wireless Power Transmission (WPT)
�
� |
WP 1A
� |
� |
2024-06-21 |
|
[ 100 ]
�
� |
Reply liaison statement to Working Party 4C (copy to Working Parties 5A, 5D, 7C and 7D for information) - Work of Working Party 1A on beam-Wireless Power Transmission (WPT)
�
� |
WP 1A
� |
� |
2024-06-21 |
|
[ 99 ]
�
� |
Reply liaison statement to Working Party 7D (copy to Working Parties 4C, 5A, 5D and 7C for information) - Beam Wireless Power Transmission (WPT)
�
� |
WP 1A
� |
� |
2024-06-21 |
|
[ 98 ]
�
� |
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.17
�
� |
WPs 3 L and 3M
� |
AI1.17
� |
2024-06-12 |
|
[ 97 ]
�
� |
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1
�
� |
WP 3M
� |
AI1.1
� |
2024-06-12 |
|
[ 96 ]
�
� |
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14
�
� |
WPs 3L and 3M
� |
AI1.14, AI1.13, AI1.12, AI1.11
� |
2024-06-12 |
|
[ 95 ]
�
� |
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4C, 5A, 5C, 7C and 7D for information) - Propagation information to support studies in preparation
for WRC-27 agenda item 1.8
�
� |
WPs 3J, 3K and 3M
� |
AI1.8
� |
2024-06-12 |
|
[ 94 ]
�
� |
Reply liaison statement to Working Parties 7C and 7D (copy to Working Parties 4A, 4C, 5A, 5B and 5C for information) - Propagation aspects related to WRC-27 agenda item 1.18
�
� |
WPs 3J and 3M
� |
AI1.18
� |
2024-06-12 |
|
[ 93 ]
�
� |
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15
�
� |
WP 3J
� |
AI1.15
� |
2024-06-12 |
|
[ 92 ]
�
� |
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
�
� |
WPs 3J and 3M
� |
AI1.10
� |
2024-06-11 |
|
[ 91 ]
�
� |
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7
�
� |
WPs 3K and 3M
� |
AI1.7
� |
2024-06-10 |
|
[ 90 ]
�
� |
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 4A, 4C, 5A, 5B and 5D for information) - WRC-27 agenda items 1.16
�
� |
WPs 3J and 3M
� |
AI1.16
� |
2024-06-10 |
|
[ 89 ]
�
� |
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15
�
� |
WP 5C
� |
AI1.15
� |
2024-05-29 |
|
[ 88 ]
�
� |
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13
�
� |
WP 5C
� |
AI1.13
� |
2024-05-29 |
|
[ 87 ]
�
� |
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7
�
� |
WP 5C
� |
AI1.7
� |
2024-05-29 |
|
[ 86 ]
�
� |
Reply liaison statement to Working Party 7C (copy to Working Parties 3J, 3M, 4A, 4C, 5A and 5B for information) - Relevant technical information to support studies under WRC-27 agenda item 1.18 and update on supporting materials
�
� |
WP 5C
� |
AI1.18
� |
2024-05-29 |
|
[ 85 ]
�
� |
Liaison statement to Working parties 4A, 4C, 5A, 5B, 3J and 3M (copy to Working Parties 1A, 4B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
�
� |
WP 5C
� |
AI1.10
� |
2024-05-29 |
|
[ 84 ]
�
� |
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5C, 7B, 7C, 7D and ICAO) - Relevant technical information for sharing studies under WRC-27 agenda item 1.7
�
� |
WP 5B
� |
AI1.7
� |
2024-05-28 |
|
[ 83 ]
�
� |
Reply liaison statement to Working Party 4C (copy to Working Party 5D for information) - Relevant technical information for sharing studies
under WRC-27 agenda item 1.13
�
� |
WP 5B
� |
AI1.13
� |
2024-05-28 |
|
[ 82 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5C, and 7D (copy to Working Party 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8
�
� |
WP 5B
� |
AI1.8
� |
2024-05-21 |
|
[ 81 ]
�
� |
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 4C, 5A, 5B, 5C, 3J and 3M) - Relevant technical information to support studies
under WRC-27 agenda item 1.18
�
� |
WP 4A
� |
AI1.18
� |
2024-05-15 |
|
[ 80 ]
�
� |
Liaison statement to Working Party 4C (copy to Working Party 1B for information) - Relevant technical and operational information to support studies under WRC-27 agenda item 1.5
�
� |
WP 4A
� |
AI1.5
� |
2024-05-14 |
|
[ 79 ]
�
� |
Liaison statement to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D (copy to Working Party 7C for information) - Information to support studies under WRC-27 agenda item 1.1
�
� |
WP 4A
� |
AI1.1
� |
2024-05-13 |
Resultados :228 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):