Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP1B : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-R�WP1B� C�

UIT-R�WP1B

Metodolog�as para la Gesti�n Eficaz del Espectro y Estrategias Econ�micas

Resultados :383 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 283 ]
Study of the impact of wireless power transfer systems for electric vehicles operating in the 79-90 KHz range on radio communications systems in the 79-90 KHz range on radio communications systems in the amateur service � International Amateur Radio Union AI9.1 2018-05-28
[ 282 ]
Proposed revision of preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] � Japan Q210/1, AI9.1 2018-05-28
[ 281 ]
Proposal on preliminary draft revision of Recommendation ITU-R SM.2110-0 � Japan Q210/1, AI9.1 2018-05-28
[ 280 ]
Commentary on working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]- [Methodology for spectrum management of wireless power transmission (WPT)] � International Amateur Radio Union AI9.1 2018-05-28
[ 279 ]
Proposed revision of Report ITU-R SM.2093-2 � Korea (Republic of) 2018-05-28
[ 278 ]
Proposed revision of Report ITU-R SM.2012-5 � Korea (Republic of) 2018-05-28
[ 277 ]
Proposal regarding the working document towards a preliminary draft revision of Recommendation ITU-R SM.1896 � Germany (Federal Republic of) 2018-05-28
[ 276 ]
Proposed on study of spectrum efficiency and economic value � China (People's Republic of) 2018-05-28
[ 275 ]
Consideration on coexistence between WPT4EV and SFTS � China (People's Republic of) 2018-05-28
[ 274 ]
Proposed modification to the working document towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.7 � China (People's Republic of) AI9.1 2018-05-28
[ 273 ]
The study of coexistence between WPT4EV and MF broadcast � China (People's Republic of) 2018-05-28
[ 272 ]
Proposal of draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 Resolution 958 (WRC-15) Annex item 1 (WPT4EV) � China (People's Republic of) 2018-05-28
[ 271 ]
Wireless power transfer (WPT) further studies on the performance of MF AM sound broadcasting receivers in the presence of interference from WPT � British Broadcasting Corporation (BBC) Q210/1 2018-05-25
[ 270 ]
Statement to ITU-R Working Party 1A (copy to ITU-R Working Party 1B) - Information on medium frequency broadcast operation and listening in portions of Region 2 for WPT Impact Assessment � North American Broadcasters Association (NABA) 2018-05-25
[ 269 ]
Working document towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 � Turkey AI9.1 2018-05-25
[ 268 ]
Proposals for CPM text for agenda item 9.1 issue 9.1.6 � United Kingdom of Great Britain and Northern Ireland AI9.1 2018-05-25
[ 267 ]
Study on the impact of WPT-EV on the 60 kHz standard frequency and time signal service � United Kingdom of Great Britain and Northern Ireland 2018-05-25
[ 266 ]
Proposed editorial update of five Recommendations � Chairman, SG 1 CG on editorial review 2018-05-28
[ 265 ]
Comments to the ITU-R Questions, Recommendations and Reports assigned to ITU-R Working Party 1B � Chairman, SG 1 CG on editorial review 2018-05-28
[ 264 ]
(Rev.1)
Proposed modifications to the working document towards a preliminary draft revision of Report ITU-R SM.2015 � Korea (Republic of) 2018-05-25
[ 263 ]
Proposal on draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 - Resolution 958 (WRC-15) Annex item 1 (WPT4EV) � Korea (Republic of) Q210/1, AI9.1 2018-05-25
[ 262 ]
(Rev.1)
Proposed modification of a preliminary draft revision of Recommendation ITU-R SM.2110-0 � Korea (Republic of) Q210/1, AI9.1 2018-05-25
[ 261 ]
Proposed revision of preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] � Korea (Republic of) Q210/1, AI9.1 2018-05-25
[ 260 ]
Proposals towards draft new Report ITU-R SM.[SPECTRUM AUCTIONS] -Assessment of the economic efficiency and economic value of the radio spectrum � Russian Federation Q240/1 2018-05-25
[ 259 ]
Working document towards a draft revision of Report ITU-R SM.2405-0 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities � Colombia (Republic of) 2018-05-25
[ 258 ]
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Study Group 1 and ITU-T Study Group 3 on collaboration among the three sectors of ITU on economic issues � ITU-D SG 1 2018-05-24
[ 257 ]
Liaison statement from ITU-D Study Group 1 Question 1/1 to ITU-R Study Groups 1, 4 and 5 on collaboration � ITU-D SG 1 2018-05-24
[ 256 ]
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 1 on collaboration � ITU-D SG 1 2018-05-22
[ 255 ]
Proposed revision of Report ITU-R SM.2012-5 - Economic aspects of spectrum management � ATDI Q240/1 2018-05-20
[ 254 ]
Reply from the taskforce Chair of SAE J2954 on wireless power transfer and alignment to the November 2017 liaison statement from ITU-R Working Party 1B � Director, BR 2018-05-21
[ 253 ]
Proposed revisions to the working document toward a preliminary draft new Report ITU-R SM.[LPWAN.MTC] � United States of America 2018-05-18
[ 252 ]
Working towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 - Resolution 958 (WRC-15), Annex item 1 � United States of America AI9.1 2018-05-18
[ 251 ]
Proposed revisions to working document towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.7 - Resolution 958 (WRC-15), Annex item 2 � United States of America AI9.1 2018-05-18
[ 250 ]
Reply liaison statement to Working Party 1B (copy to Working Party 1A for information) - Work on WRC-19 agenda item 9.1, issue 9.1.6 � WP 7A AI9.1 2018-05-18
[ 249 ]
Proposals to the working document towards a preliminary draft new Report ITU-R SM.[LPWAN.MTC] � Sigfox 2018-05-16
[ 248 ]
Liaison statement on mechanisms for pricing of licenses for mobile/broadband/fixed � ITU-T SG 3 2018-05-08
[ 247 ]
Preliminary position on WRC-19 Agenda � World Meteorological Organization 2018-05-03
[ 246 ]
Liaison statement to ITU-R Working Party 1B (copy to ITU-R Working Party 1A) - Information on current activities in APT Wireless Group on Wireless Power Transmission (WPT) � Asia-Pacific Telecommunity 2018-05-01
[ 245 ]
"Conclusion" section of the draft CPM texts on the 9 issues under WRC-19 agenda item 9.1 � Chairman, CPM AI9.1 2018-04-30
[ 244 ]
Liaison statement to Working Party 1B (copy for information to Working Parties 1A and 5B) - Draft CPM text for WRC-19, agenda item 9.1, issue 9.1.6 � WP 6A AI9.1 2018-04-26
[ 243 ]
Liaison statement to Working Party 1B - Further comments on the Report ITU-R SM.2405 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities � WP 6A 2018-04-26
[ 242 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L, 5A, and 5B) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz] � WP 6A 2018-04-26
[ 241 ]
Final consolidated contributions to the Rapporteur Group draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 - Resolution 958 (WRC-15) Annex item 1 (WPT4EV) � Rapporteur, RG-WPT 2018-03-28
[ 240 ]
Liaison statement to Working Party 1B (copy for information to Working Party 1C) - WRC-19 agenda item 9.1, issue 9.1.7 � WP 4A AI9.1 2018-03-21
[ 239 ]
Reply liaison statement to Working Parties 1B and 5A - Work on WRC-19 agenda item 9.1, issue 9.1.8 � WP 5D AI9.1 2018-02-13
[ 238 ]
Liaison statement to Working Parties 3L, 5A, 5B and 6A (copy to Working Party 1B for information) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz] � WP 1A 2017-12-12
[ 237 ]
+Ann.1-13
Report on the fourth 2015-2019 meeting of Working Party 1B (Geneva, 23 - 30 November 2017) � Chairman, WP 1B 2017-11-30
[ 236 ]
(Rev.1)
Final List of Participants - Working Party 1B (Geneva, 23-30 November 2017) � Director, BR 2017-11-30
[ 235 ]
Liaison statement on information about work that is being carried out which is under study in ITU-T Q3/5; ITU-R and ITU-D � ITU-T SG 5 2017-11-23
[ 234 ]
List of documents issued (Documents 1B/193 - 1B/234) � BR Study Groups Department 2017-11-22
Resultados :383 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2020-12-16