Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2113 ]
�
� |
Incremental Query in SDN
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-06 |
|
[ 2112 ]
�
� |
Alarm Processing in Virtual Network
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-06 |
|
[ 2111 ]
�
� |
Transport network batch query and processing solution in SDN environment
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2016-09-06 |
|
[ 2110 ]
�
(Rev.1)� |
Transport synchronization message in FlexO interface
�
� |
ZTE Corporation
� |
Q13/15, Q11/15
� |
2016-09-06 |
|
[ 2109 ]
�
� |
Overhead processing of FlexE and FlexO atomic function
�
� |
ZTE Corporation
� |
Q11/15
� |
2016-09-06 |
|
[ 2108 ]
�
� |
Comments on draft G.8131 Amd.2 (TD575/PLEN)
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2016-09-06 |
|
[ 2107 ]
�
� |
Proposed modification to Clause 9.1.3.1 (EDNI message) of G.Sup-ELPDNI
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2016-09-06 |
|
[ 2106 ]
�
� |
Sterlite's proposal on revision of G.652 and G.657
�
� |
Sterlite Optical Technologies Ltd
� |
Q5/15
� |
2016-09-06 |
|
[ 2105 ]
�
� |
Proposed revision for Appendixes on draft Recommendation L.380 (ex L.nrr-frm) "Framework of disaster management for network resilience and recovery"
�
� |
National Institute of Information and Communications Technology
� |
Q17/15
� |
2016-09-06 |
|
[ 2104 ]
�
� |
Consideration on holdover state for T-BC
�
� |
NEC Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2103 ]
�
� |
G.8272.1 edits
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2102 ]
�
� |
G.8272.1 Appendix D
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2101 ]
�
� |
G.8272.1 autonomous primary reference clock performance requirements
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2100 ]
�
� |
Modelling of ETY layer
�
� |
Coriant GmbH & Co. KG
� |
Q14/15, Q11/15, Q10/15
� |
2016-09-06 |
|
[ 2099 ]
�
(Rev.1)� |
Analysis of the synchronization requirements of 5G and suggestion on new network reference model
�
� |
China Mobile Communications Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2098 ]
�
� |
Proposed text for MPLS-TP Shared Ring Protection (G.8132)
�
� |
China Mobile Communications Corporation
,
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2016-09-06 |
|
[ 2097 ]
�
(Rev.1)� |
Basic requirements for channel bonding of NG-PON2
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-09-06 |
|
[ 2096 ]
�
(Rev.1)� |
Proposal for interface requirements in Recommendation L.pneid clause 10
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q16/15
� |
2016-09-06 |
|
[ 2095 ]
�
(Rev.1)� |
Channel bonding establishment for NGPON2
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-09-06 |
|
[ 2094 ]
�
� |
The suggestion on the service information model based on MPLS-TP
�
� |
China Mobile Communications Corporation
,
FiberHome Technologies Group
� |
Q14/15, Q12/15
� |
2016-09-06 |
|
[ 2093 ]
�
(Rev.1)� |
Big channel scheme for channel bonding of NG-PON2
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-09-06 |
|
[ 2092 ]
�
(Rev.1)� |
proposal for 25G PON
�
� |
ZTE Corporation
� |
Q2/15
� |
2016-09-06 |
|
[ 2091 ]
�
� |
The suggestion about adding some new characteristics of optical transport network equipment
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
� |
Q11/15
� |
2016-09-06 |
|
[ 2090 ]
�
� |
Attributes for SyncE extended SSM
�
� |
ZTE Corporation
� |
Q14/15, Q13/15
� |
2016-09-06 |
|
[ 2089 ]
�
� |
G.fast: Excluding persistent near-end los defect from fast retrain triggers
�
� |
Huawei Technologies Co., Ltd.
� |
Q4/15
� |
2016-09-06 |
|
[ 2088 ]
�
(Rev.1)� |
Synchronization OAM
�
� |
ZTE Corporation
� |
Q14/15, Q13/15
� |
2016-09-06 |
|
[ 2087 ]
�
� |
G.fast: INM procedure and control parameters
�
� |
Intel Corporation
� |
Q4/15
� |
2016-09-06 |
|
[ 2086 ]
�
� |
G.fast: The next generation of DSL beyond current G.fast
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
Swisscom SA
� |
Q4/15
� |
2016-09-06 |
|
[ 2085 ]
�
� |
Requirements for a common service information model
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
� |
Q14/15
� |
2016-09-06 |
|
[ 2084 ]
�
� |
G.fast: Revising ETR_min and ETR_min_eoc
�
� |
Futurewei Technologies US R&D Center
� |
Q4/15
� |
2016-09-06 |
|
[ 2083 ]
�
� |
G.fast: Simulation results on linear precoding and non-linear precoding
�
� |
Futurewei Technologies US R&D Center
� |
Q4/15
� |
2016-09-06 |
|
[ 2082 ]
�
� |
Adding a note to clarify PRMPSDds
�
� |
Futurewei Technologies US R&D Center
� |
Q4/15
� |
2016-09-06 |
|
[ 2081 ]
�
� |
APTS network limit of G.8271.2 and noise generation of G.8273.4
�
� |
Huawei Technologies Co., Ltd.
,
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2080 ]
�
� |
G.vector: Extending pilot sequence length to 1024
�
� |
Futurewei Technologies US R&D Center
� |
Q4/15
� |
2016-09-06 |
|
[ 2079 ]
�
� |
Proposals for G.8266 clock with GNSS receiver and G.8272.1 scope
�
� |
Huawei Technologies Co., Ltd.
,
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2078 ]
�
� |
G.vector: Supporting zero bits and measuring QLN based on zero bits
�
� |
Futurewei Technologies US R&D Center
� |
Q4/15
� |
2016-09-06 |
|
[ 2077 ]
�
� |
SyncE clock ID of G.8264
�
� |
Huawei Technologies Co., Ltd.
,
Orange
� |
Q13/15
� |
2016-09-06 |
|
[ 2076 ]
�
� |
G.vlc: Multi-pulse Pulse Position Modulation with dimming support
�
� |
Futurewei Technologies US R&D Center
� |
Q18/15
� |
2016-09-06 |
|
[ 2075 ]
�
� |
Sub-Nyquist Artefacts and Sampling Moir� Effects when Measuring PTP to PTP and PTP to 1 PPS Noise Transfer (G.8272.3, G.supp)
�
� |
Huawei Technologies Co., Ltd.
� |
Q13/15
� |
2016-09-06 |
|
[ 2074 ]
�
� |
Proposed notes for 7.3.1/G.8273.2 (PTP to PTP noise transfer) and C.2.3.1/G.8273.2 (PTP to 1PPS noise transfer)
�
� |
Huawei Technologies Co., Ltd.
� |
Q13/15
� |
2016-09-06 |
|
[ 2073 ]
�
� |
Miscellaneous Proposals for Revised Recommendation G.781
�
� |
Huawei Technologies Co., Ltd.
� |
Q13/15
� |
2016-09-06 |
|
[ 2072 ]
�
� |
Initial Simulation Results for Wander Accumulation in a Chain of eEECs (G.8262.1, G.supp)
�
� |
Huawei Technologies Co., Ltd.
� |
Q13/15
� |
2016-09-06 |
|
[ 2071 ]
�
� |
G.8275.2 - Deny service
�
� |
Huawei Technologies Co., Ltd.
� |
Q13/15
� |
2016-09-06 |
|
[ 2070 ]
�
(Rev.1)� |
Same path of SyncE frequency and PTP time
�
� |
Huawei Technologies Co., Ltd.
� |
Q13/15
� |
2016-09-06 |
|
[ 2069 ]
�
� |
OMCI management support for XGS-PON
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
� |
Q2/15
� |
2016-09-06 |
|
[ 2068 ]
�
� |
Short-term phase transient and phase discontinuity of G.8266
�
� |
Huawei Technologies Co., Ltd.
� |
Q13/15
� |
2016-09-06 |
|
[ 2067 ]
�
� |
Wide-Band Jitter Accumulation Simulation Results for Transport of Higher-Rate Ethernet Clients over B100G OTN based on Multiple Replications
�
� |
Huawei Technologies Co., Ltd.
� |
Q13/15
� |
2016-09-06 |
|
[ 2066 ]
�
� |
Proposals on Chinese experience in revision of Rec. L.79
�
� |
FiberHome Technologies Group
� |
Q16/15
� |
2016-09-06 |
|
[ 2065 ]
�
� |
Proposed future ONU management reference model in G.988
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2016-09-06 |
|
[ 2064 ]
�
� |
Proposed G.FAST updates in G.988
�
� |
Huawei Technologies Co., Ltd.
� |
Q2/15
� |
2016-09-06 |
Results:2210 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):