Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1059 ]
�
� |
Ethernet Protection over Dual Parented Type B (TDM/TDMA) PON
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q2/15
� |
2014-11-11 |
|
[ 1058 ]
�
� |
Editorial Comments to the current text for BNM in draft G.8013
�
� |
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2014-11-11 |
|
[ 1057 ]
�
� |
Support of the DiffServ Uniform Model in G.8121
�
� |
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2014-11-11 |
|
[ 1056 ]
�
� |
Need for P/CoS information for 1DM Sink processing in G.8021 and G.8121
�
� |
Huawei Technologies Co. Ltd.
� |
Q14/15, Q10/15
� |
2014-11-11 |
|
[ 1055 ]
�
� |
Editorial Comments to MEP compound functions notes in G.8121, G.8152, G.8021 and G.8052
�
� |
Huawei Technologies Co. Ltd.
� |
Q14/15, Q10/15
� |
2014-11-11 |
|
[ 1054 ]
�
� |
Comments about dFOP and cFOP definitions in G.8121 and G.8021
�
� |
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2014-11-11 |
|
[ 1053 ]
�
� |
On DRRus report format to support queue fill and traffic arrival triggers for LPM state changes
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2014-11-11 |
|
[ 1052 ]
�
(Rev.1)� |
G.989.3 Rogue Modifications
�
� |
Alcatel-Lucent USA Inc.
� |
Q2/15
� |
2014-11-11 |
|
[ 1051 ]
�
� |
Draft new recommendation for PRIME 1.4 networks
�
� |
STMicroelectronics
� |
Q15/15
� |
2014-11-11 |
|
[ 1050 ]
�
� |
G.vdsl,G.inp: Format for tone grouping in L2-SRA message
�
� |
Broadcom Corporation
� |
Q4/15
� |
2014-11-11 |
|
[ 1049 ]
�
� |
Interferometric crosstalk measurement and model
�
� |
Telefon AB - LM Ericsson
� |
Q6/15
� |
2014-11-11 |
|
[ 1048 ]
�
(Rev.1)� |
Multiple radio signal downlink transmission based on IF-band RoF transmission scheme
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
SK Telecom
� |
Q2/15
� |
2014-11-11 |
|
[ 1047 ]
�
� |
G.fast: need for information to other organisations
�
� |
Swisscom SA
� |
Q4/15
� |
2014-11-11 |
|
[ 1046 ]
�
� |
G.fast: Compatibility Issues with multi-mode VDSL2/G.fast FTTdp equipment.
�
� |
Swisscom SA
� |
Q4/15
� |
2014-11-11 |
|
[ 1045 ]
�
� |
Proposal for test plan for parameters related to EVM
�
� |
ADVA Optical Networking
,
Coriant GmbH & Co. KG
� |
Q6/15
� |
2014-11-11 |
|
[ 1044 ]
�
� |
Proposal on Clause 10 (OTN MDSP) of G.mdsp
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2014-11-11 |
|
[ 1043 ]
�
� |
Editorial comments on G.873.2
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2014-11-11 |
|
[ 1042 ]
�
� |
Proposal to add a new type of ODNs topologies in G.multi
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2014-11-11 |
|
[ 1041 ]
�
� |
Clarifications on G.8262
�
� |
Rakon Limited
� |
Q13/15
� |
2014-11-11 |
|
[ 1040 ]
�
� |
Comments on G.654.E fibre category proposal
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q6/15, Q5/15
� |
2014-11-11 |
|
[ 1039 ]
�
� |
Proposal to add PON-ID checking in G.989.3
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2014-11-11 |
|
[ 1038 ]
�
� |
Proposal of ODU SMP
�
� |
ZTE Corporation
� |
Q9/15
� |
2014-11-11 |
|
[ 1037 ]
�
� |
Proposed protection for a failure of interconnected link in G.MDSP
�
� |
China Unicom
,
ZTE Corporation
� |
Q9/15
� |
2014-11-11 |
|
[ 1036 ]
�
� |
Consideration on network objective in G.mdsp
�
� |
China Unicom
,
ZTE Corporation
� |
Q9/15
� |
2014-11-11 |
|
[ 1035 ]
�
� |
G.vdsl: New VDSL2 Band Plan for China
�
� |
Futurewei Technologies US R&D Center
,
Metanoia Technologies, Inc.
� |
Q4/15
� |
2014-11-11 |
|
[ 1034 ]
�
� |
Calculation of Hlog
�
� |
Futurewei Technologies US R&D Center
� |
Q4/15
� |
2014-11-11 |
|
[ 1033 ]
�
� |
G.fast: Symbol transmission in L2.2 state
�
� |
Futurewei Technologies US R&D Center
� |
Q4/15
� |
2014-11-11 |
|
[ 1032 ]
�
� |
ONU power levelling for G.989.3
�
� |
Alcatel-Lucent USA Inc.
,
Electronics and Telecommunications Research Institute (ETRI)
� |
Q2/15
� |
2014-11-11 |
|
[ 1031 ]
�
� |
Proposal for EECv2 specifications
�
� |
Rakon Limited
� |
Q13/15
� |
2014-11-11 |
|
[ 1030 ]
�
� |
Withdrawn
�
Reposted as TD116/WP2, "G.972: Living list"
� |
N/A
� |
� |
2014-11-11 |
|
[ 1029 ]
�
� |
Proposal to revise G.suppl.41 considering 100G application
�
� |
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
� |
Q8/15
� |
2014-11-11 |
|
[ 1028 ]
�
� |
Proposal to revise G.973.1 considering 100G application
�
� |
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
� |
Q8/15
� |
2014-11-11 |
|
[ 1027 ]
�
� |
Proposal to revise G.973 considering 100G application
�
� |
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
� |
Q8/15
� |
2014-11-11 |
|
[ 1026 ]
�
� |
G.993.2: Proposed additions to G.993.2 Amendment 6
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-11-11 |
|
[ 1025 ]
�
� |
G.993.2, G.hn: The role of DSL protection mode in DSL-PLT coexistence
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-11-11 |
|
[ 1024 ]
�
� |
G.993.2, G.hn: On the VDSL2-PLT coordination procedure
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-11-11 |
|
[ 1023 ]
�
� |
G.993.2, G.hn: Protocol structure for support DSL-PLT coexistence
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-11-11 |
|
[ 1022 ]
�
� |
G.993.2, G.fast: Improving services from VDSL2 17A cabinets using G.fast
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-11-11 |
|
[ 1021 ]
�
� |
Amendment of G.7041- considerations of PTP & SyncO over OTN
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-11 |
|
[ 1020 ]
�
� |
Amendment of G.709- considerations of PTP & SyncO over OTN
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2014-11-11 |
|
[ 1019 ]
�
� |
Proposal for Clause 13 and Appendix II
�
� |
China Telecommunications Corporation
,
ZTE Corporation
� |
Q2/15
� |
2014-11-11 |
|
[ 1018 ]
�
� |
Conclusions of "PTP only" and "SyncE+PTP" network test
�
� |
China Unicom
� |
Q13/15
� |
2014-11-11 |
|
[ 1017 ]
�
� |
Proposed Edits to Draft Amendment 4 to Recommendation ITU-T G.998.4 (2010)
�
� |
TQ DELTA. LLC
� |
Q4/15
� |
2014-11-11 |
|
[ 1016 ]
�
� |
Test experience and requirements of intelligent node elements in optical fiber networks
�
� |
China Unicom
� |
Q16/15
� |
2014-11-11 |
|
[ 1015 ]
�
� |
Consideration on the interconnected link at the domain boundary
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q9/15
� |
2014-11-11 |
|
[ 1014 ]
�
� |
Consideration on the Back-to-Back interconnection scenarios of G.MDSP
�
� |
China Unicom
� |
Q9/15
� |
2014-11-11 |
|
[ 1013 ]
�
� |
Requirement of one to one and bidirectional switching protection of optical layer
�
� |
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
FiberHome Technologies Group
� |
Q9/15
� |
2014-11-11 |
|
[ 1012 ]
�
� |
On Operation of G.hn technology over the phone line medium in the presence of neighbouring domains
�
� |
KT Corporation
� |
Q18/15
� |
2014-11-11 |
|
[ 1011 ]
�
� |
Proposal of left questions in G.873.1 Amendment 1
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2014-11-11 |
|
[ 1010 ]
�
� |
Consideration of higher bitrate service in G.metro
�
� |
China Unicom
,
Ericsson Canada, Inc.
� |
Q6/15
� |
2014-11-11 |
Results:382 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):