Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 558 ]
�
� |
Supporting document for Draft K.jup
�
� |
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
� |
Q3/5
� |
2015-09-26 |
|
[ 557 ]
�
� |
Comments for L.Ass_DC
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/5
� |
2015-09-25 |
|
[ 556 ]
�
� |
Proposal for updates of sub-clause 6.2 of ITU-T L.Infrastructure_adaptation on "Landslides" and "Temperature"
�
� |
Korea (Rep. of)
� |
Q15/5
� |
2015-09-25 |
|
[ 555 ]
�
� |
Proposal for sub-clause 7.6, "Climate change effects by the thunder," of the draft Supplement to Recommendation ITU-T L.1500
�
� |
Korea (Rep. of)
� |
Q15/5
� |
2015-09-25 |
|
[ 554 ]
�
� |
Proposal for sub-clause 7.5, "Climate change effects by the sea temperature," of the draft Supplement to Recommendation ITU-T L.1500
�
� |
Korea (Rep. of)
� |
Q15/5
� |
2015-09-25 |
|
[ 553 ]
�
� |
Requirement of energy management in companies involved with the smart factory/manufacturing
�
� |
Korea (Rep. of)
� |
Q17/5
� |
2015-09-25 |
|
[ 552 ]
�
(Rev.1)� |
Colour and marking of DC cable in Republic of Korea
�
� |
Korea (Rep. of)
� |
Q19/5
� |
2015-09-25 |
|
[ 551 ]
�
(Rev.1)� |
Functional requirements for energy management systems in green data centres
�
� |
Korea (Rep. of)
� |
Q17/5
� |
2015-09-25 |
|
[ 550 ]
�
� |
Current standardization activities on smart cities
�
� |
Korea (Rep. of)
� |
Q20/5
� |
2015-09-25 |
|
[ 549 ]
�
� |
Proposal for sub-clause 8.5, "Possible impacts on energy sector," of the draft Supplement to Recommendation ITU-T L.1500
�
� |
Korea (Rep. of)
� |
Q15/5
� |
2015-09-25 |
|
[ 548 ]
�
� |
Proposal for the new draft of K.env
�
� |
Korea (Rep. of)
� |
Q7/5
� |
2015-09-25 |
|
[ 547 ]
�
� |
Draft of "Communication method of printing label to provide rare metals information in ICT goods"
�
� |
Korea (Rep. of)
� |
Q13/5
� |
2015-09-25 |
|
[ 546 ]
�
(Rev.1)� |
Adjustment of the ICNIRP exposure limits
�
� |
ORANGE POLSKA S.A.
� |
Q7/5
� |
2015-09-24 |
|
[ 545 ]
�
(Rev.1)� |
Inherently compliant from ICNIRP basic restriction issued as criteria for K. 52 and proposal of new category of "perfectly compliant".
�
� |
National Institute of Information and Communications Technology
,
NTT DoCoMo, Inc.
� |
Q7/5
� |
2015-09-24 |
|
[ 544 ]
�
� |
K.44 - Resolving the Remote Feeding Telecommunication circuit definition conflict with K.50
�
� |
Bourns Limited
� |
Q4/5, Q2/5
� |
2015-09-19 |
|
[ 543 ]
�
� |
K.44 Generator updates
�
� |
Bourns Limited
� |
Q4/5, Q2/5
� |
2015-09-19 |
|
[ 542 ]
�
� |
Proposal for new work program on Recommendations regarding atmospheric radiation effects (soft errors)
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q10/5
� |
2015-09-18 |
|
[ 541 ]
�
(Rev.1)� |
K.50 Base Document
�
� |
Littelfuse UK Ltd.
� |
Q4/5
� |
2015-09-17 |
|
[ 540 ]
�
� |
Draft Revised ITU-T K.67: Expected surges on telecommunication networks due to lightning
�
� |
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
� |
Q5/5
� |
2015-09-17 |
|
[ 539 ]
�
(Rev.1-2)� |
Electrical parameter classifications of IEC safety standards
�
� |
Bourns Limited
� |
Q4/5, Q2/5
� |
2015-09-13 |
|
[ 538 ]
�
(Rev.1)� |
In force K.50 (2000) reformatted to 2015 Recommendation template
�
� |
Bourns Limited
� |
Q4/5, Q2/5
� |
2015-09-12 |
|
[ 537 ]
�
(Rev.1)� |
Review and comment on ATIS-STEP Liaisons received for October 2015 SG5 meeting
�
� |
Bourns Limited
� |
Q4/5, Q2/5
� |
2015-09-12 |
|
[ 536 ]
�
(Rev.1-3)� |
Draft K.jup: Joint use of poles by power and telecommunications lines: management of the power-cross
�
� |
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
� |
Q3/5
� |
2015-09-10 |
|
[ 535 ]
�
(Rev.1)� |
K.50 Figure 4 Review: Part 4 of 4
�
� |
Bourns Limited
� |
Q4/5, Q2/5
� |
2015-09-07 |
|
[ 534 ]
�
� |
Input for CONNECT2020 - Framework for estimating the global electricity usage and GHG emissions of ICT towards 2020
�
� |
Huawei Technologies Co., Ltd.
� |
Q18/5
� |
2015-09-07 |
|
[ 533 ]
�
(Rev.1)� |
Draft K.tup: Installation of telecommunication equipment on utility poles
�
� |
Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes
� |
Q3/5
� |
2015-09-05 |
|
[ 532 ]
�
� |
Standardization to harmonize Eco-rating of mobile phones
- the way to sustainability measures for individual products
�
� |
Huawei Technologies Co., Ltd.
� |
Q16/5
� |
2015-09-03 |
|
[ 531 ]
�
� |
Huawei on details for functionality moderator in Draft Recommendation ITU-T L.Eco-Rating
�
� |
Huawei Technologies Co., Ltd.
� |
Q16/5
� |
2015-09-03 |
|
[ 530 ]
�
� |
Questions to be discussed on scope and list of missing criteria in Version 19 (ID140) of Draft Recommendation ITU-T L.Eco-Rating
�
� |
Huawei Technologies Co., Ltd.
� |
Q16/5
� |
2015-09-03 |
|
[ 529 ]
�
(Rev.1)� |
Do existing eco-rating schemes in reality penalize smartphone functionality?
�
� |
Huawei Technologies Co., Ltd.
� |
Q16/5
� |
2015-09-03 |
|
[ 528 ]
�
(Rev.1)� |
List of missing criteria in Version 19 (ID140) of Draft Recommendation ITU-T L.Eco-Rating
�
� |
Huawei Technologies Co., Ltd.
� |
Q16/5
� |
2015-09-03 |
|
[ 527 ]
�
� |
K.50 Figure 4 Review: Part 3
�
� |
Bourns Limited
� |
Q4/5, Q2/5
� |
2015-08-25 |
|
[ 526 ]
�
(Rev.1)� |
K.50 Figure 4 Review: Part 2
�
� |
Bourns Limited
� |
Q4/5, Q2/5
� |
2015-08-19 |
|
[ 525 ]
�
(Rev.1)� |
K.50 Figure 4 Review: Part 1
�
� |
Bourns Limited
� |
Q4/5, Q2/5
� |
2015-08-16 |
|
[ 524 ]
�
� |
Proposed text of new Q20/5 and Q15/5
�
� |
Huawei Technologies Co., Ltd.
� |
Q20/5, Q15/5
� |
2015-08-11 |
|
[ 523 ]
�
(Rev.1-2)� |
Interaction of switching surge protective components with Ethernet ports
�
� |
Bourns Limited
� |
Q2/5
� |
2015-08-10 |
Results:136 total items. Result page:�
Previous�-�
1 -
2 -
3
� |