International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�

ITU-T�SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 2290 ]
Not used �
Withdrawn: Reposted as TD694/PLEN
N/A � 2012-08-28
[ 2289 ]
G.Fast: Proposal to solve inconsistent terminology � The Netherlands Organisation for Applied Scientific Research (TN Q4A/15 2012-08-28
[ 2288 ]
Not used �
Withdrawn: Reposted as TD295/WP2
N/A � 2012-08-28
[ 2287 ]
(Rev.1)
G.hn: Improving the existing CBTS back-off rules � ZTE Corporation Q4B/15 2012-08-28
[ 2286 ]
Correction to TD712 (WP3/15) Report of the MPLS-TP experts meeting (Seoul, South Korea, 11-15 June 2012) � France T�l�com Orange Q10/15 2012-08-28
[ 2285 ]
Precedence statement for G.8113.2 � Cisco Systems, Inc. , France T�l�com Orange , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation Q10/15 2012-08-28
[ 2284 ]
(Rev.1)
Server layer-based SD detection method in packet network � ZTE Corporation Q9/15, Q10/15 2012-08-28
[ 2283 ]
G.fast: FEC simulation results with noise � Marvell Semiconductor Inc. Q4A/15 2012-08-28
[ 2282 ]
G.fast: LDPC decoder feasibility � Marvell Semiconductor Inc. Q4A/15 2012-08-28
[ 2281 ]
The considerations about beyond 100G OTN requirements � China Telecommunications Corporation Q6/15, Q12/15, Q11/15 2012-08-28
[ 2280 ]
(Rev.1)
Proposal for modification of G.697 for high bitrates DWDM System � China Unicom Q6/15 2012-08-28
[ 2279 ]
(Rev.1-2)
Next Generation Metro WDM � China Unicom Q6/15 2012-08-28
[ 2278 ]
(Rev.1)
Low cost metro systems: proposed scope for a new Recommendation � China Unicom Q6/15 2012-08-28
[ 2277 ]
(Rev.1)
Clarification for the concerns on Next Generation Metro WDM � China Unicom Q6/15 2012-08-28
[ 2276 ]
Concerns regarding the packet selection methods for the PEC � China Unicom Q13/15 2012-08-28
[ 2275 ]
Proposals for specifying relative aspects of T-BC recommended in G.8273.2 � China Unicom Q13/15 2012-08-28
[ 2274 ]
G.8273.3: Proposals about the functions of T-TC devices based on experimental results � China Unicom Q13/15 2012-08-28
[ 2273 ]
(Rev.1)
Consideration on protection interworking between SMP and other protection techniques � China Unicom Q9/15 2012-08-28
[ 2272 ]
Proposed updated draft for ITU-T Recommendation G.8011.4/Y.1307.4 � Alcatel-Lucent USA Inc. Q10/15 2012-08-28
[ 2271 ]
Considerations re ETH-LM and Link Aggregation � AimValley BV , Alcatel-Lucent USA Inc. Q14/15, Q10/15 2012-08-28
[ 2270 ]
(Rev.1)
ITU-T study item discussion on transport network with backhaul traffic optimization � China Unicom Q12/15 2012-08-28
[ 2269 ]
Considerations re Multipoint Ethernet Connection Protection New Work Item � ADVA Optical Networking , AimValley BV , Alcatel-Lucent USA Inc. , Ciena Corporation , Cisco Systems, Inc. , Ericsson, Inc. Q9/15 2012-08-28
[ 2268 ]
Proposed text and figures for Appendix II/G.8012.1 � Huawei Technologies Co. Ltd. Q10/15 2012-08-28
[ 2267 ]
(Rev.1)
Some requirements for performance measurement methods in 100G DWDM system � China Unicom Q6/15 2012-08-28
[ 2266 ]
(Rev.1)
Scenario suggestion on protection interworking between MSTP and packet transport network � China Unicom Q9/15 2012-08-28
[ 2265 ]
(Rev.1-2)
Application Scenario for ODU SMP Deployment in telecom operator's network � China Unicom Q9/15 2012-08-28
[ 2264 ]
Consideration on ODU SMP Protection Characteristics � China Unicom Q9/15 2012-08-28
[ 2263 ]
Propose a new equipment model of converged access and transport node � ZTE Corporation Q9/15, Q2/15, Q12/15 2012-08-28
[ 2262 ]
(Rev.1)
Proposal to study a converged access and transport network � ZTE Corporation Q2/15, Q12/15 2012-08-28
[ 2261 ]
(Rev.1)
Some requirements of noise classification in 100G DWDM system � China Unicom Q6/15 2012-08-28
[ 2260 ]
Proposal for adding Nyquist WDM in to section 7 7 in G sup39 � China Unicom Q6/15 2012-08-28
[ 2259 ]
(Rev.1)
Proposal for defining a parameter about I- and Q- imbalance � China , China Unicom , ZTE Corporation Q6/15 2012-08-28
[ 2258 ]
Comment to the proposed draft revised Rec. G.657 � Ministry of Industry and Information Technology (MIIT) Q5/15 2012-08-28
[ 2257 ]
Some parameters consideration on 100G DP-QPSK modulation format � Ministry of Industry and Information Technology (MIIT) , ZTE Corporation Q6/15 2012-08-28
[ 2256 ]
Some consideration on low cost metro WDM � Ministry of Industry and Information Technology (MIIT) , ZTE Corporation Q6/15 2012-08-28
[ 2255 ]
Extend bit-rate scope to 40/100G in G.697 � Ministry of Industry and Information Technology (MIIT) , ZTE Corporation Q6/15 2012-08-28
[ 2254 ]
Consideration for ODU SMP supporting ODUflex signal resizing � Electronics and Telecommunications Research Institute (ETRI) Q9/15, Q11/15 2012-08-28
[ 2253 ]
Some considerations on the ETH-TST and ETH-LCK in Y.1731 � Ministry of Industry and Information Technology (MIIT) Q10/15 2012-08-28
[ 2252 ]
Not used �
Duplicate of C-2254
N/A � 2012-08-28
[ 2251 ]
(Rev.1)
Propose to promoting the progress of MPLS-TP linear protection � Ministry of Industry and Information Technology (MIIT) Q9/15 2012-08-28
[ 2250 ]
G.fast: On-Line Reconfiguration - Revisited � Futurewei Technologies US R&D Center Q4A/15 2012-08-28
[ 2249 ]
A proposal of other alternative OTUkV frame structures for low latency transport � Altera Corporation , Electronics and Telecommunications Research Institute (ETRI) , LG-Ericsson , SK Telecom Q11/15 2012-08-28
[ 2248 ]
Proposal for G.multi architecture � FiberHome Technologies Group Q2/15 2012-08-28
[ 2247 ]
(Rev.1)
Clarification to various types of MW-PON systems in G.multi Scope � FiberHome Technologies Group Q2/15 2012-08-28
[ 2246 ]
+Corr.1
Serial data acquisition by XGPON � FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation Q2/15 2012-08-28
[ 2245 ]
DVB_ASI Jitter Accumulation over OTN Islands � Huawei Technologies Co. Ltd. , Huawei Technologies Co. Ltd. Q9/15, Q13/15 2012-08-28
[ 2244 ]
Criterion for Minimum Detectable Floor Delay Step using minMATIE � Huawei Technologies Co. Ltd. , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2243 ]
Effect of Turnaround on Time Transport Performance using PTP � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2242 ]
Advantages of the Pdelay Mechanism in Time Transport using PTP for the case where SyncE is not Used for Frequency Transport � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2241 ]
Discussion of T-BC/T-TSC Noise Generation for Phase/Time Synchronization using PTP without SyncE Support � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
Results:2390 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2021-01-29