International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : SG01 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�SG01� C�

ITU-R�SG01

Spectrum Management

Results:165 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 65 ]
Final List of Participants - Study Group 1 (E-meeting, 3 June 2021) � Director, BR 2021-06-03
[ 64 ]
List of documents issued (Documents 1/42 - 1/64) � BR, Study Groups Department 2021-06-03
[ 63 ]
(Rev.1)
Revision of Report ITU-R SM.2351-2 - Smart grid utility management systems � WP 1A 2021-06-02
[ 62 ]
(Rev.1)
Revision of Report ITU-R SM.2303-2 - Wireless power transmission using technologies other than radio frequency beam � WP 1A Q210/1 2021-06-02
[ 61 ]
(Rev.3)
Executive Report on the May-June 2021 meeting of Working Party 1A (e-Meeting, 25 May - 2 June 2021) � Chairman, WP 1A 2021-06-02
[ 60 ]
(Rev.1)
Revision of Report ITU-R SM.2392-0 - Applications of wireless power transmission via radio frequency beam � WP 1A 2021-06-02
[ 59 ]
Liaison statement on work related to environment energy efficiency and the circular economy and new areas of study � ITU-T SG5 2021-06-02
[ 58 ]
Executive Report on Working Party 1B meeting (Online meeting, 25 May - 2 June 2021) � Acting Chairman, WP 1B 2021-06-02
[ 57 ]
(Rev.1)
Draft new Recommendation ITU-R SM.[MOB DF PERF] - Performance evaluation of Mobile DF units in operational environment � WP 1C 2021-06-02
[ 56 ]
Executive Report to Study Group 1 � Chairman, WP 1C 2021-06-02
[ 55 ]
Draft revision of Recommendation ITU-R SM.575-2 - Protection of fixed monitoring stations against interference from nearby or strong transmitters � WP 1C 2021-06-02
[ 54 ]
Proposed new Chairman and Vice-Chairman of Working Party 1B � Chairman, SG 1 2021-06-01
[ 53 ]
(Rev.1)
Draft new Recommendation ITU-R SM.[TDOA-ACC] - Test procedure for determining the accuracy of TDOA systems � WP 1C 2021-06-01
[ 52 ]
(Rev.1)
New Report ITU-R SM.2486-0 - Use of commercial drones for ITU-R spectrum monitoring tasks � WP 1C 2021-05-31
[ 51 ]
(Rev.1)
Revision to Report ITU-R SM.2093-3 � WP 1B 2021-05-31
[ 50 ]
(Rev.1)
Revision of Report ITU-R SM.2153-7 - Technical and operating parameters and spectrum use for short range radiocommunication devices � WP 1B 2021-05-31
[ 49 ]
(Rev.1)
Draft new Question ITU-R [GPR/WPR]/1 - Spectrum management framework for the introduction of Ground- and Wall- Penetrating Radar (GPR/WPR) imaging systems � WP 1B 2021-05-31
[ 48 ]
Report on CISPR activities from November 2020 to May 2021 � Rapp. SG 1 (RG) on Liaison with CISPR , Rapp. to CISPR on WPT issues 2021-05-24
[ 47 ]
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan � ITU-T SG15 2021-05-07
[ 46 ]
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan � ITU-T SG15 2021-05-06
[ 45 ]
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan � ITU-T SG9 2021-05-06
[ 44 ]
Liaison statement to CISPR (Subcommittees B and H) (copy for information to Study Group 1 and Working Parties 1A, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Update to Standard frequency and time signal services protection requirements in the CISPR radio services database � WP 7A 2021-04-26
[ 43 ]
(Rev.1)
Liaison statement to CISPR and CISPR/H (copy for information to Study Group 1 and Working Parties 5A, 6A and 7D) - Liaison between ITU-R and CISPR on the protection of radio services in the 6-40 GHz frequency range � WP 1A 2020-12-15
[ 42 ]
+Ann.1
Summary Record of the meeting of Radiocommunication Study Group 1 (On-line meeting, 3 December 2020) � Chairman, SG 1 2020-12-04
[ 41 ]
Final list of participants Study Group 1: E-meeting, 3 December 2020 � Director, BR 2020-12-03
[ 40 ]
List of Documents issued (Documents 1/1 - 1/40) � BR, Study Groups Department 2020-12-03
[ 39 ]
Proposed organization of the work of the Study Group 1 � Chairman, SG 1 2020-12-02
[ 38 ]
Executive Report on the November-December 2020 meeting of Working Party 1A (e-Meeting, 24 November - 2 December 2020) � Chairman, WP 1A 2020-12-02
[ 37 ]
(Rev.1)
Executive Report on Working Party 1B (Online meeting, 24 November - 1 December 2020) � Acting Chairman, WP 1B 2020-12-02
[ 36 ]
(Rev.1)
Executive Report to Study Group 1 � Chairman, WP 1C 2020-12-02
[ 35 ]
(Rev.1)
Draft new Recommendation ITU-R SM.[FS-ACC] - Test procedure for measuring monitoring system field strength measurement accuracy in the VHF/UHF frequency range � WP 1C 2020-12-02
[ 34 ]
(Rev.1)
Draft revision of Report ITU-R SM.2130-1 - Inspection of radio stations � WP 1C 2020-12-02
[ 33 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.1392-2 - Essential requirements for a spectrum monitoring system for developing countries � WP 1C 2020-11-30
[ 32 ]
(Rev.1)
Draft revision of Report ITU-R SM.2405-0 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities � WP 1B 2020-11-30
[ 31 ]
Proposed Correspondence Group on the editorial review and maintenance of ITU-R Recommendations and Reports assigned to Study Group 1 � Chairman, SG 1 2020-11-24
[ 30 ]
Studies under Resolution 731 (Rev.WRC-19) - Consideration of sharing and adjacent-band compatibility between passive and active services above 71 GHz � Chairmen, SGs 1, 5 & 7 2020-11-20
[ 29 ]
+Corr.1
Report on CISPR activities from June 2019 to November 2020 � Rapp. SG 1 (RG) on Liaison with CISPR , Rapp. to CISPR on WPT issues 2020-11-19
[ 28 ]
Liaison statement from ITU-D Study Group 2 Questions 5/2 to ITU-T SG 2, ITU-T SG 5, ITU-T SG 11, ITU-T SG 12, ITU-T SG 15, ITU-T SG 16, ITU-T SG 20, ITU-R Study Group 1, Working Parties 1B, 1C, 4A, 4B, 4C, 5A, 5D, Study Group 6, Working Party 6A, Study Group 7 on the final Report of ITU-D Q5/2 and draft future work of ITU-D Q5/2 to WTDC-21 � ITU-D SG2 2020-10-27
[ 27 ]
Reply liaison statement to CISPR and CISPR/H on the protection requirements for the broadcasting service (copy to ITU-R Study Group 1 and Working Party 1A) � WP 6A 2020-10-16
[ 26 ]
Liaison statement from ITU-D Study Group 1 Question 6/1 on comments and information on the draft final Report - ITU-D Study Group 1 Question 6/1: Consumer information, protection and rights: Laws, regulation, economic bases, consumer networks � ITU-D SG1 2020-10-08
[ 25 ]
Liaison statement to CISPR and CISPR/H (copy to ITU-R Study Group 1 and Working Parties 1A and 6A) - Additional information about the impact of WPT-EV on LF and MF broadcasting � SG 1 RG on Liaison with CISPR 2020-10-01
[ 24 ]
Liaison statement from ITU-D Question 2/1 to ITU-R Study Group 1, specially Working Party 1B, ITU-T Study Groups 9 and 16, and EBU on comments and information on the draft final Report - Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and implementation of new services � ITU-D SG1 2020-09-30
[ 23 ]
Liaison statement on the new version of the Access Network Transport (ANT) standard overview and work plan � ITU-T SG15 2020-09-22
[ 22 ]
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan � ITU-T SG15 2020-09-22
[ 21 ]
Information on the preparation of texts for the draft CPM Report to WRC-23 � Chairman, CPM-23 2020-09-18
[ 20 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups) � Chairman, CCV 2020-07-14
[ 19 ]
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other subordinate groups � Director, BR 2020-06-25
[ 18 ]
Proposal for the revision of relevant existing questions dealing with electromagnetic compatibility and unintentional electromagnetic emissions � Italy 2020-06-19
[ 17 ]
Reply liaison statement on the new version of the Access Network Transport (ANT) standard overview and work plan � ITU-T SG9 2020-05-27
[ 16 ]
Liaison response from CISPR/H to Working Party 6A on their proposal for changes in the radioservices database of IEC � International Special Committee on Radio Interference 2020-05-07
Results:165 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2023-10-19