International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP7C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP7C� C�

ITU-R�WP7C

Remote Sensing Systems

Results:390 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 290 ]
Reply liaison statement to Working Party 5B (copy to Working Parties 5A and 7C) Foreign Object Debris detection system operating in the band 92-100 GHz � WP 7D 2018-05-18
[ 289 ]
Reply liaison statement to Working Party 5A (copied to Working Parties 5B and 7C for information) - Coexistence between high-speed railway radiocommunication system between train and trackside operating in the frequency bands 92-94 GHz, 94.1-100 GHz and 102-109.5 GHz, and active and passive services � WP 7D 2018-05-18
[ 288 ]
+Ann.1-15
Report of the meeting of Working Party 7C (Geneva, 14-18 May 2018) � Chairman, WP 7C 2018-05-18
[ 287 ]
Final List of Participants - Working Party 7C (Geneva, 14-18 May 2018) � Director, BR 2018-05-18
[ 286 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations � WP 7B 2018-05-17
[ 285 ]
List of documents issued (Documents 7C/200 - 7C/285) � BR Study Groups Department 2018-05-11
[ 284 ]
Liaison statement to Working Party 7C - Progress of sharing studies between a 45 MHz radar sounder and incumbent fixed, mobile, broadcasting and space research services operating in the 40-50 MHz frequency range � WP 6A AI2.2 2018-05-10
[ 283 ]
Revisions to the preliminary draft new Report ITU-R RS.[275-450 GHz CHARS] - Technical and operational characteristics of EESS (passive) systems in the frequency range 275-450 GHz � European Space Agency , European Organisation for the Exploitation of Meteorological Satellites AI1.15 2018-05-07
[ 282 ]
Further element towards revision to Recommendation ITU-R RS.1861 � European Space Agency , European Organisation for the Exploitation of Meteorological Satellites 2018-05-07
[ 281 ]
Proposed reply liaison statement to Working Party 4A on WRC-19 agenda items 1.6 and 9.1, issue 9.1.9 � China (People's Republic of) AI9.1, AI1.6 2018-05-07
[ 280 ]
Proposal for modification of preliminary draft revised Recommendation ITU-R RS.1861 � China (People's Republic of) 2018-05-07
[ 279 ]
Analysis of RFI caused to EESS passive from FSS GSO operations in the 18.6-18.8 GHz band - WRC-19 agenda item 1.5 � Institute of Electrical and Electronics Engineers, Inc. AI1.5 2018-05-07
[ 278 ]
Reply liaison statement to Working Party 5C - WRC-19 agenda item 1.14 � European Space Agency , European Organisation for the Exploitation of Meteorological Satellites AI1.14 2018-05-05
[ 277 ]
Reply to Working Party 4A liaison statement related to the EESS (passive) protection criteria under agenda items 1.6 and 9.1 issue 9 � France , European Organisation for the Exploitation of Meteorological Satellites , European Space Agency 2018-05-07
[ 276 ]
Prioritisation of space weather RF instruments for consideration in planning for WRC-23 preliminary - Agenda item 2.3 � World Meteorological Organization AI2.3 2018-05-04
[ 275 ]
Reply liaison statement to ITU-R Working Party 7A on UTC (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� regarding broadcasting systems � WP 6B 2018-05-04
[ 274 ]
Proposed draft CPM text for WRC-19 agenda item 10 (WRC-23 preliminary agenda item 2.3) � United States of America AI10 2018-05-03
[ 273 ]
Proposed draft CPM text for WRC-19 agenda item 10 (WRC-23 preliminary agenda item 2.2) � United States of America AI10 2018-05-03
[ 272 ]
Draft reply liaison statement to ITU-R Working Party 5C - WRC-19 agenda item 1.14 � United States of America AI1.14 2018-05-03
[ 271 ]
Preliminary position on WRC-19 Agenda � World Meteorological Organization 2018-05-03
[ 270 ]
Proposals for modification of the preliminary draft revision of Recommendation ITU-R RS.1861 � Russian Federation 2018-05-03
[ 269 ]
Draft reply liaison statement to Working Party 7A from Working Party 7C - UTC application in the systems of the Earth exploration satellite service, space research service, and meteorological satellite service � Russian Federation 2018-05-03
[ 268 ]
"Conclusion" section of the draft CPM texts on the 9 issues under WRC-19 agenda item 9.1 � Chairman, CPM AI1.9 2018-04-30
[ 267 ]
Draft revision of Recommendation ITU-R RS.1859-0 - Use of remote sensing systems for data collections to be used in the event of natural disasters and similar emergencies � United States of America 2018-04-27
[ 266 ]
Preliminary draft revision of Recommendation ITU-R RS.1166-4 - Performance and interference criteria for active spaceborne � United States of America 2018-04-27
[ 265 ]
Proposed reply liaison statement to Working Party 6A - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2) � United States of America AI2.2 2018-04-27
[ 264 ]
Draft revision of Recommendation ITU-R RS.1883 - Use of remote sensing systems in the study of climate change and the effects thereof � United States of America 2018-04-27
[ 263 ]
Proposed draft new Report ITU-R RS.[275-450 GHZ CHARS] - Technical and operational characteristics of EESS (passive) systems in the frequency range 275-450 GHz � United States of America AI1.15 2018-04-27
[ 262 ]
Proposed changes to preliminary draft new Recommendation ITU-R RS.[EESS_SAR-RNSS] � United States of America 2018-04-30
[ 261 ]
Proposed modifications to preliminary draft new Report ITU-R RS.[VHF.SOUNDER] - Preliminary results of sharing studies between a 45 MHz radar sounder and incumbent fixed, mobile, broadcasting and space research services operating in the 40-50 MHz frequency range � United States of America 2018-04-27
[ 260 ]
Preliminary draft revision of Recommendation ITU-R RS.1861 - Typical technical and operational characteristics of Earth exploration-satellite service (passive) systems using allocations between 1.4 and 275 GHz � United States of America 2018-04-27
[ 259 ]
Liaison statement to Working Party 5B on comparison of highest known e.i.r.p. of terrestrial radars operating in EESS (active) frequency bands from 432 MHz to 238 GHz with highest e.i.r.p. given in corresponding ITU-R M-series Recommendations � United States of America 2018-04-27
[ 258 ]
Reply liaison statement to Working Party 5A on working document towards a preliminary draft new Report ITU-R M.[90GHZ.RSTT.COEXIST] � United States of America 2018-04-27
[ 257 ]
Analysis of potential OOB interference to a spaceborne cloud profile radar in the 94.0-94.1 GHz band from RSTT systems in adjacent bands � United Arab Emirates 2018-04-27
[ 256 ]
Reply liaison statement to Working Party 5B on working document towards a preliminary draft new Report ITU-R M.[FOD 92-100 GHZ] � United States of America 2018-04-27
[ 255 ]
(Rev.1)
Sections of text relating to metaids from proposed revisions to the preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - SHARING STUDIES] - Studies on the suitability of existing allocations to the space operation service below 1 GHz and additional sharing studies on possible new and/or upgraded allocations � United States of America 2018-04-27
[ 254 ]
Analysis of potential in-band interference to a spaceborne cloud profile radar in the 94.0-94.1 GHz band from fod detection systems in the radiolocation service � United States of America 2018-04-27
[ 253 ]
Proposed reply liaison statement to Working Party 5C - Technical and operational characteristics for fixed wireless systems operating within the 40-50 MHz frequency range - WRC-23 preliminary agenda item 2.2 � United States of America AI2.2 2018-04-27
[ 252 ]
Proposed reply liaison statement to Working Party 5B - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range - WRC-23 preliminary agenda item 2.2 � United States of America AI2.2 2018-04-30
[ 251 ]
Proposed reply liaison statement to Working Party 5A - Technical and operational characteristics for the 40-50 MHz frequency range - WRC-23 preliminary agenda item 2.2 � United States of America AI2.2 2018-04-27
[ 250 ]
Review of Recommendations, Reports and Opinions - Under the Purview of Working Party 7C � United States of America 2018-04-27
[ 249 ]
Preliminary draft new Report ITU-R RS.[SPACE_WEATHER_SENSROS] - Technical and operational characteristics of RF-based Space weather sensors � United States of America 2018-04-27
[ 248 ]
Draft revised Recommendation ITU-R RS.1263-1 - Interference criteria for meteorological aids operated in the 400.15-406 MHz and 1 668.4-1 700 MHz bands � United States of America 2018-04-27
[ 247 ]
Draft revised Recommendation ITU-R RS.1165 - Technical characteristics and performance criteria for systems in the meteorological aids service in the 403 MHz and 1 680 MHz bands � United States of America 2018-04-27
[ 246 ]
Draft revision of Recommendation ITU-R RS.2042-0 - Typical technical and operating characteristics for speceborne radar sounder systems using the 40-50 MHz frequency band � United States of America 2018-04-27
[ 245 ]
Working document toward a preliminary draft new Report ITU-R RS.[GROUND-PASS-SENSORS]- Technical and operational characteristics of ground-based passive sensors operating in 22 to 1 000 GHz frequency range � United States of America 2018-04-27
[ 244 ]
Preliminary draft new Report - Technical and operational characteristics of RF-base Space weather sensors � World Meteorological Organization 2018-04-27
[ 243 ]
Preliminary draft new Report ITU-R RS.[SPACE_WEATHER_SENSORS] - Technical and operational characteristics of RF-based space weather sensors � Switzerland (Confederation of) 2018-03-23
[ 242 ]
Liaison statement to Working Parties 4B, 5A, 5C, 5D, 7C and 7D regarding WRC-19 agenda item 9.1, issue 9.1.9 � WP 4A AI9.1 2018-03-21
[ 241 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations � WP 4A 2018-03-21
Results:390 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2021-01-19