Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 815 ]
�
� |
Liaison statement to Working Party 4A - Application of coordination arc in the Ka band under WRC-19 agenda item 7, Issue B
�
� |
WP 4C
� |
AI7
� |
2018-07-02 |
|
[ 814 ]
�
� |
Liaison statement to Working Party 4B (copy for information to Working Parties 4A and 5D) - MSS technical parameters in the range 1-3 GHz
�
� |
WP 4C
� |
� |
2018-07-02 |
|
[ 813 ]
�
� |
Proposals regarding WRC-19 agenda item 7, Issue N - Measures to facilitate entering new assignments into the RR Appendix 30B List
�
� |
Norway
� |
AI7
� |
2018-06-26 |
|
[ 812 ]
�
� |
Proposal for updates to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A
�
� |
France
,
Luxembourg
� |
AI17
� |
2018-06-26 |
|
[ 811 ]
�
� |
Proposal for updates to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A
�
� |
Luxembourg
� |
AI1.7
� |
2018-06-27 |
|
[ 810 ]
�
� |
Working material for discussions on protection criteria of fixed- and broadcasting satellite services in sharing studies under WRC-19 agenda items 1.13, 1.14 and 1.16
�
� |
SES ASTRA AB
� |
AI1.16, AI1.14, AI1.13
� |
2018-06-26 |
|
[ 809 ]
�
� |
Revisions to the working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS]
�
� |
United States of America
� |
AI1.5
� |
2018-06-26 |
|
[ 808 ]
�
� |
Working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9
�
� |
United States of America
� |
AI9.1
� |
2018-06-26 |
|
[ 807 ]
�
� |
Revisions to working document towards a preliminary draft new Report ITU-R S.[ESIM] - Operation of earth stations in motion (ESIM) in fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz - Protection criteria for feeder links of the MSS in the bands 19.3-19.7 GHz and 29.1-29.5 GHz
�
� |
United States of America
� |
AI1.5
� |
2018-06-26 |
|
[ 806 ]
�
� |
Draft CPM text for WRC-19 agenda item 7 - Issue D
�
� |
United States of America
� |
AI7
� |
2018-06-26 |
|
[ 805 ]
�
� |
Draft reply liaison statement to Working Party 5A regarding draft CPM text for WRC-19 agenda item 1.5
�
� |
United States of America
� |
AI1.5
� |
2018-06-26 |
|
[ 804 ]
�
� |
Revisions to working document toward preliminary draft CPM text for WRC-19 agenda item 1.5
�
� |
United States of America
� |
AI1.5
� |
2018-06-26 |
|
[ 803 ]
�
� |
Revisions to working document toward a preliminary draft new Report ITU-R S.[AGENDA ITEM 1.5] - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
�
� |
United States of America
� |
AI1.5
� |
2018-06-26 |
|
[ 802 ]
�
� |
Revisions to working document towards a preliminary draft new Report ITU-R S.[NGSO_BIU+MILESTONES] - Studies relating to the bringing into use of frequency assignments for all non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services
�
� |
United States of America
� |
AI7
� |
2018-06-26 |
|
[ 801 ]
�
� |
Revisions to preliminary draft CPM text for WRC-19 agenda item 7 - Issue A
�
� |
United States of America
� |
AI7
� |
2018-06-26 |
|
[ 800 ]
�
� |
Proposed addition to Section 4.2.1 of working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency bands 27.5-29.5 GHz and 17.7-19.7 GHz
�
� |
United States of America
� |
AI1.5
� |
2018-06-26 |
|
[ 799 ]
�
� |
Proposed addition to Section 4.2.3 of working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency bands 27.5-29.5 GHz and 17.7-19.7 GHz
�
� |
United States of America
� |
AI1.5
� |
2018-06-26 |
|
[ 798 ]
�
� |
Proposed revisions to the draft CPM text - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all regions - WRC-19 agenda item 1.4
�
� |
United States of America
� |
AI1.4
� |
2018-06-26 |
|
[ 797 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[FSS NGSO-TO-GSO] - Example Case Study on the Technical feasibility of using the Fixed Satellite Service (FSS) NGSO-to-GSO satellite links
�
� |
United States of America
� |
� |
2018-06-26 |
|
[ 796 ]
�
� |
Technical parameters of NGSO ISS for sharing studies in the frequency range 24.45-24.75 GHz
�
� |
Airbus Group
� |
� |
2018-06-26 |
|
[ 795 ]
�
� |
Preliminary draft new Recommendation ITU-R S.[50/40 GHZ FSS SHARING METHODOLOGY] - Maximum permissible levels of interference in a GSO FSS network caused by co-directional GSO and non-GSO FSS systems and in non-GSO FSS systems caused by other co-directional non-GSO FSS systems operating in the 50/40 GHz frequency bands
�
� |
Inmarsat Plc.
� |
AI1.6
� |
2018-06-26 |
|
[ 794 ]
�
� |
Revisions to link budget information of FSS and BSS GSO systems for non-GSO studies
�
� |
Al Yah Satellite Communications (YahSat)
� |
� |
2018-06-26 |
|
[ 793 ]
�
� |
Updates to working document towards a preliminary draft revision of Recommendation ITU-R S.1782-0 and updates to the related work plan - Possibilities for global broadband Internet access by fixed-satellite service systems
�
� |
France
� |
� |
2018-06-26 |
|
[ 792 ]
�
� |
Protection criteria of systems in the fixed-satellite service
�
� |
France
,
Luxembourg
,
Netherlands (Kingdom of the)
,
Spain
,
Switzerland (Confederation of)
� |
� |
2018-06-26 |
|
[ 791 ]
�
� |
Proposed modifications to the preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - WRC-19 agenda item 9.1 issue 9.1.9
�
� |
France
� |
AI9.1
� |
2018-06-26 |
|
[ 790 ]
�
� |
Proposed modifications to the working document towards draft CPM text WRC-19 - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
France
� |
AI9.1
� |
2018-06-26 |
|
[ 789 ]
�
� |
Proposed liaison statement to Working Party 3M - Support on rain attenuation calculation from Recommendation ITU-R P.618
�
� |
France
� |
AI1.6
� |
2018-06-26 |
|
[ 788 ]
�
� |
Study of Impact of NGSO systems on unavailability of GSO links in the Q/V bands - WRC-19 agenda item 1.6
�
� |
Luxembourg
� |
AI1.6
� |
2018-06-26 |
|
[ 787 ]
�
� |
Technical characteristics of GSO FSS parameters WRC-19 agenda item 1.6
�
� |
Luxembourg
� |
AI1.6
� |
2018-06-26 |
|
[ 786 ]
�
� |
Revision of studies addressing protection of EESS (passive) in the 50.2-50.4 GHz band - WRC-19 agenda item 1.6
�
� |
Luxembourg
� |
AI1.6
� |
2018-06-26 |
|
[ 785 ]
�
� |
Proposed revisions to draft CPM text for WRC-19 agenda item 1.6
�
� |
Luxembourg
� |
AI1.6
� |
2018-06-26 |
|
[ 784 ]
�
� |
Draft working document on Resolution 49 (Rev.WRC-15)
�
� |
United States of America
� |
� |
2018-06-26 |
|
[ 783 ]
�
� |
Proposed updates to working document towards preliminary draft new Recommendation ITU-R S.[50/40 REFERENCE LINKS] - WRC-19 agenda item 1.6
�
� |
United States of America
� |
AI1.6
� |
2018-06-26 |
|
[ 782 ]
�
� |
Proposed updates to working document towards a preliminary draft new Report on sharing between 50/40 GHz GSO networks and non-GSO systems - WRC-19 agenda item 1.6
�
� |
United States of America
� |
AI1.6
� |
2018-06-26 |
|
[ 781 ]
�
� |
Proposed updates to preliminary draft new Recommendation ITU-R S.[50/40 GHz FSS SHARING METHODOLOGY]
�
� |
United States of America
� |
AI1.6
� |
2018-06-26 |
|
[ 780 ]
�
� |
Preliminary working document towards a draft revision of Recommendations ITU-R S.1428-1 and ITU-R BO.1443-3 - Study to analyze appropriate treatment of spill-over lobe in NGSO/GSO interference calculations and resolve conflicting guidance
�
� |
United States of America
� |
� |
2018-06-26 |
|
[ 779 ]
�
� |
Preliminary working document towards a draft revision of Recommendation ITU-R S.1503-3: Further improvements to model capabilities of advanced NGSO FSS satellite systems below 30 GHz
�
� |
United States of America
� |
� |
2018-06-26 |
|
[ 778 ]
�
� |
Comments on the example Resolution for WRC-19 agenda item 1.5
�
� |
Kenya (Republic of)
,
Rwanda (Republic of)
� |
AI1.5
� |
2018-06-26 |
|
[ 777 ]
�
� |
Preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
� |
AI9.1
� |
2018-06-26 |
|
[ 776 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[50/40 GHZ ADJACENT BAND STUDIES] - Protection of EESS (passive) and RAS systems from non-GSO fixed satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands - WRC-19 agenda item 1.6
�
� |
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
� |
� |
2018-06-26 |
|
[ 775 ]
�
� |
Proposed modifications of the preliminary draft CPM text for WRC-19 agenda item 7 - Issue A
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
AI7
� |
2018-06-26 |
|
[ 774 ]
�
� |
Earth stations in motion (ESIM) compatibility with non-GSO MSS feeder links in the bands 19.3-19.7 GHz and 29.1-29.5 GHz
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
AI1.5
� |
2018-06-26 |
|
[ 773 ]
�
� |
Proposed changes to working document towards draft CPM text for WRC-19 agenda item 1.5
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
AI1.5
� |
2018-06-26 |
|
[ 772 ]
�
� |
Sharing and compatibility between ESIM and mobile service
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
AI1.5
� |
2018-06-26 |
|
[ 771 ]
�
� |
Proposed changes to the example Resolution for the WRC-19 agenda item 1.5
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
AI1.5
� |
2018-06-26 |
|
[ 770 ]
�
� |
Proposal on draft CPM text for WRC-19 agenda item 1.4
�
� |
Benin (Republic of)
,
Burkina Faso
,
Burundi (Republic of)
,
Guinea (Republic of)
,
Kenya (Republic of)
,
Lesotho (Kingdom of)
,
Mali (Republic of)
,
Niger (Republic of the)
,
Nigeria (Federal Republic of)
,
Rwanda (Republic of)
,
Senegal (Republic of)
,
South Africa (Republic of)
,
South Sudan (Republic of)
,
Tanzania (United Republic of)
,
Uganda (Republic of)
,
Zambia (Republic of)
� |
AI1.4
� |
2018-06-26 |
|
[ 769 ]
�
� |
Considerations on the work of ITU-R regarding Radiocommunication Assembly Resolution 69 - Resolution ITU-R 69 (development and deployment of international public telecommunications via satellite in developing countries)
�
� |
Cameroon (Republic of)
,
C�te d'Ivoire (Republic of)
� |
� |
2018-06-25 |
|
[ 768 ]
�
� |
Administrative due diligence applicable to some satellite radiocommunication services
�
� |
Director, BR
� |
� |
2018-06-26 |
|
[ 767 ]
�
� |
WRC-19 agenda item 7 - Issues H, I, L - Consolidated proposed changes to Appendix 4
�
� |
Director, BR
� |
AI7
� |
2018-06-26 |
|
[ 766 ]
�
� |
WRC-19 agenda item 7, issue C2 - Proposed implementation
�
� |
Director, BR
� |
� |
2018-06-26 |
Results:915 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):