International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP3M : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP3M� C�

ITU-R�WP3M

Point-to-point and Earth-space propagation

Results:419 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 319 ]
Supporting information for rain attenuation modeling - Considering wet antenna effect � China (People's Republic of) 2018-06-12
[ 318 ]
Proposed preliminary revision to Recommendation ITU-R P.618-13 - A new rain attenuation model considering wet antenna effect � China (People's Republic of) 2018-06-12
[ 317 ]
Proposed preliminary modification to Report ITU-R P.2346-2 - Building entry loss measurements in an urban environment at 27.5 and 39.5 GHz � China (People's Republic of) 2018-06-12
[ 316 ]
Mathworks MATLAB implementation of Recommendation ITU-R P.2001-2 � Switzerland (Confederation of) , LS telcom AG 2018-06-12
[ 315 ]
Information document - Measurement and analysis of clutter loss by using drone � Japan Q211/3 2018-06-12
[ 314 ]
Fixed link long term measurements � United Kingdom of Great Britain and Northern Ireland 2018-06-11
[ 313 ]
Independent and joint statistics of clutter loss and building entry loss - Initial measurements � United Kingdom of Great Britain and Northern Ireland 2018-06-11
[ 312 ]
Building entry loss - New measurements of domestic buildings � United Kingdom of Great Britain and Northern Ireland 2018-06-11
[ 311 ]
Recommendation ITU-R P.452-16 performance evaluation � United Kingdom of Great Britain and Northern Ireland 2018-06-11
[ 310 ]
UK mobile measurement data preparation and benchmarking method � United Kingdom of Great Britain and Northern Ireland 2018-06-11
[ 309 ]
On measurement methodologies: Conditions for comparability of measurements data � Telefon AB - LM Ericsson , Electronics and Telecommunications Research Institute (ETRI) 2018-06-12
[ 308 ]
Proposed revision to Recommendation ITU-R P.452-16 - Additional measurements for modification of the height-gain model � Korea (Republic of) 2018-06-11
[ 307 ]
Satellite measurement data at 20 GHz from high North Latitudes � Telenor ASA 2018-06-11
[ 306 ]
Proposed revision of Recommendation ITU-R P.2109-0 - Effect of Antenna Beamwidth on Building Entry Loss � Korea (Republic of) 2018-06-11
[ 305 ]
(Rev.1)
Information document to Recommendation ITU-R P.452-16 - Anomalous propagation measurements in South Coast of Korea � Korea (Republic of) 2018-06-11
[ 304 ]
Building entry loss (BEL) measurement databank � ORANGE POLSKA S.A. 2018-06-07
[ 303 ]
Liaison statement to Working Party 6A (copied for information to Working Parties 3K, 3M, 5B and 5C) - Updated on work towards WRC-19 agenda item1.1 � WP 5A 2018-06-06
[ 302 ]
Proposed revision of Study Group 3 data banks formatted Table VII-7 � United States of America 2018-06-05
[ 301 ]
Proposed revision to VBA implementation of Recommendation ITU-R P.452-16 � United States of America 2018-06-05
[ 300 ]
Proposed draft revision to Recommendation ITU-R P.452-16 - Prediction procedure for the evaluation of interference between stations on the surface of the Earth at frequencies above about 0.1 GHz � United States of America 2018-06-05
[ 299 ]
Working document towards a preliminary draft revision of Recommendation ITU-R P.619-3 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth � United States of America 2018-06-05
[ 298 ]
Draft revision of Recommendation ITU-R P.1144-9 guide to the application of the propagation methods of Rediocommunication Study Group 3 � United States of America 2018-06-05
[ 297 ]
Working document towards a preliminary draft revision of Recommendation ITU-R P.618-13 � United States of America 2018-06-05
[ 296 ]
Draft new fascicle FAS/3M/X - Fascicle on Hydrometeor Scatter Interference � United States of America 2018-06-05
[ 295 ]
Working document towards a preliminary draft revision of Recommendation ITU-R P.452, Section 5 � United States of America 2018-06-05
[ 294 ]
Study Group 3 data banks contribution - Wide-band statistics of aeronautical mobile-ground links in the 5030-5091 MHz frequency range � United States of America 2018-06-05
[ 293 ]
Working document towards a preliminary draft modification of Recommendation ITU-R P.618-13 - Modifying the upper probability limit of the rain attenuation prediction method � Luxembourg , Italy 2018-06-05
[ 292 ]
Reply liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4C, 5A, 5D, 7B, 7C and 7D) - Clarification of HAPS characteristics and studies � WP 5C 2018-06-05
[ 291 ]
Reply liaison statement to Working Party 5D (copy for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - Information on Adaptive Transmit Power Control (ATPC) � WP 5C AI1.14 2018-06-05
[ 290 ]
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (copy for information to Working Parties 3M and 5B) - Progress on WRC-19 agenda item 1.14 � WP 5C AI1.14 2018-06-05
[ 289 ]
Correspondence Group 3J-3M-13 validation examples Report of Activities (2017 - 2018) � Chairman, 3J-3M-13 2018-06-04
[ 288 ]
Multi-year trans-horizon radio propagation measurements at 3.5 GHz � Netherlands (Kingdom of the) 2018-06-04
[ 287 ]
Information document: Engineered surfaces research at the Communications Research Centre Canada for engineering the wireless radio environment � Canada 2018-06-01
[ 286 ]
Proposed draft new ITU-R Question on the impact of engineered surfaces on electromagnetic wave propagation and service coexistence � Canada 2018-06-01
[ 285 ]
Reply liaison statement to ITU-R Working Party 5C (copy for information to Working Parties 3M, 4A, 4C, 5B, 5D, 7B, 7C, 7D and Task Group 5/1) - WRC-19 agenda item 1.14 � WP 5A AI1.14 2018-05-25
[ 284 ]
Correspondence Group 3M-4 Activity Report 2017 - 2018 � Chairman, CG 3M-4 2018-05-24
[ 283 ]
Liaison statement to Working Parties 3J and 3M - Analysis of RFI caused to EESS (passive) in the 18.6-18.8 GHz band � WP 7C 2018-05-22
[ 282 ]
Chairman's Report � CG 3K-3M-12 2018-05-21
[ 281 ]
Report on activities of the Correspondence Group - Building entry loss � CG 3J-3K-3M-8 2018-05-18
[ 280 ]
Liaison statement to Working Party 5A - Copied for information to Working Parties 3K, 3M, 5B and 5C - WRC-19 agenda item.1.1 sharing and compatibility studies � WP 6A AI1.1 2018-05-11
[ 279 ]
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 5A and 5D) - WRC-19 agenda item 1.3 � WP 6A AI1.3 2018-05-10
[ 278 ]
Liaison statement to Working Party 3K (copy for information to Working Party 3J and Working Party 3M) - Use of Modulation Error Ratio (MER) to assess ducting � WP 6A 2018-05-10
[ 277 ]
Reply liaison statement to Working Party 5C (copy for information to Working Parties 3M, 4C, 5A, 5D, 7B, 7C and 7D) - WRC-19 agenda item 1.14 � WP 4A AI1.14 2018-03-21
[ 276 ]
Liaison statement to Working Party 5B (copy for information to Working Parties 4B, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and 3M) - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15) � WP 4A AI1.10 2018-03-21
[ 275 ]
Liaison statement on ITU inter-Sector coordination � ITU-T (TSAG) 2018-03-05
[ 274 ]
Liaison statement reply to ITU-R Working Party 5C (copied for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - WRC-19 agenda item 1.14 � WP 5D 2018-02-12
[ 273 ]
Liaison statement to Working Parties 3K, 3M, 5B, 5C and 6A - Progress report on WRC-19 agenda item 1.1 sharing and compatibility studies � WP 5A 2017-11-22
[ 272 ]
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (and copy to Working Parties 3M and 5B for information) - WRC-19 agenda item 1.14 � WP 5C 2017-11-22
[ 271 ]
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5C, 5D, 6A, 7C, 7B, 7D and 3M - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15) � WP 5B AI1.10 2017-11-20
[ 270 ]
Liaison statement to Working Party 3K (copy for information to Working Parties 3J and 3M) - Use of Modulation Error Ratio (MER) to assess ducting � WP 6A 2017-10-23
Results:419 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2019-08-23