Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 133 ]
�
+Ann.1� |
Report of CG work after 2017 meeting of Study Group 1 on preliminary draft new Recommendation
�
� |
Chairman, CG Mob.DF
� |
� |
2018-05-15 |
|
[ 132 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[POPULATION_COVERAGE] - Methods for estimating population coverage for public terrestrial broadcasting networks
�
� |
State Enterprise "Ukrainian State Centre of RF"
� |
� |
2018-05-11 |
|
[ 131 ]
�
� |
Proposed revisions to Report ITU-R SM.2356-1 - Procedures for planning and optimization of spectrum-monitoring networks in the VHF/UHF frequency range
�
� |
Russian Federation
� |
� |
2018-05-08 |
|
[ 130 ]
�
� |
Liaison statement to Working Party 1B (copy for information to Working Party 1C) - WRC-19 agenda item 9.1, issue 9.1.7
�
� |
WP 4A
� |
AI9.1
� |
2018-03-21 |
|
[ 129 ]
�
� |
Liaison statement to Working Party 1C (copy for information to Working Party 4C) - Preliminary draft new Recommendation ITU-R S.[GUIDELINES HARMFUL INTERFERENCE REPORTING] - Guidelines for reporting harmful interference to GSO satellite networks
�
� |
WP 4A
� |
� |
2018-03-21 |
|
[ 128 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 1C and 7C ) - Standards for broadcasting-satellite receiving equipment
�
� |
WP 4A
� |
� |
2018-03-21 |
|
[ 127 ]
�
� |
Revision of Recommendation ITU-R SM.329 - EMC/EMI in relation to IMT
�
� |
ATDI
� |
� |
2018-02-20 |
|
[ 126 ]
�
� |
Response liaison statement to ITU-T Study Group 5 - Copy to ITU-R Study Group 1 - Considerations of EMC/EMI in relation to IMT
�
� |
WP 5D
� |
� |
2018-02-13 |
|
[ 125 ]
�
� |
Liaison statement to Working Party 1C - Adjacent Channel Leakage Ratio (ACLR) measurements for IMT technologies
�
� |
WP 5D
� |
� |
2018-02-12 |
|
[ 124 ]
�
� |
Revision of ITU-R SM.329 Unwanted emissions of IMT-2020 systems; measurement bandwidth
�
� |
ATDI
� |
Q222/1
� |
2018-01-24 |
|
[ 123 ]
�
� |
Further information regarding Documents 1/108-1A/262-1C/122-5D/790, 5D/791 and 5D/792
�
� |
Director, BR
� |
� |
2018-01-12 |
|
[ 122 ]
�
� |
Liaison statement on proposals to Recommendation ITU-R SM.329 about unwanted emission test
�
� |
ITU-T SG 5
� |
� |
2017-12-19 |
|
[ 121 ]
�
� |
Liaison statement to Working Parties 1C, 4A and 7C - Standards for broadcasting-satellite receiving equipment
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 120 ]
�
� |
Liaison statement to CISPR and ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 4A, 4B and 7C) - Interference from broadcasting-satellite receiving equipment
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 119 ]
�
� |
Liaison statement to Working Parties 1C, 3L and 5B (copy to Working Parties 5A and 5C) - HF radio noise measurements at sea
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 118 ]
�
� |
Liaison statement to ICAO (copy for information to Working Parties 1C and 5B) - Development in CISPR/F subcommittee concerning interference from LED Lighting
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 117 ]
�
� |
Reply liaison statement to Working Parties 5D and 1C - Unwanted emissions of IMT-2020 systems utilizing active antenna systems and total radiated power
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 116 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Party 1C for information) - WRC-19 agenda item 9.1, issue 9.1.7
�
� |
WP 1B
� |
AI9.1
� |
2017-12-08 |
|
[ 115 ]
�
� |
Liaison statement on Setting Environmental requirements for 5G/IMT-2020
�
� |
ITU-T SG 5
� |
� |
2017-11-23 |
|
[ 114 ]
�
� |
Liaison statement on information about work that is being carried out which is under study in ITU-T Q3/5, ITU-R and ITU-D
�
� |
ITU-T SG 5
� |
� |
2017-11-23 |
|
[ 113 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 1C, 3L, 5A and 5C - Working document towards a preliminary draft new Report ITU-R M.[HF NOISE AT SEA]
�
� |
WP 5B
� |
� |
2017-11-20 |
|
[ 112 ]
�
(Rev.1)� |
Liaison statement to ITU-R Working Parties 1A and 1C (copy to Working Parties 5D and 6A) - Interference to EESS (passive) sensors operating in the 1 400-1 427 MHz band caused by radiations at the intermediate frequency of satellite broadcast receiver equipment
�
� |
WP 7C
� |
� |
2017-10-31 |
|
[ 111 ]
�
� |
Liaison statement to ITU-R Working Party 1C - Concerning the revision of Recommendation ITU-R SM.1875-2 - DBV-T coverage measurements and verification of planning criteria
�
� |
WP 6A
� |
� |
2017-10-23 |
|
[ 110 ]
�
� |
Liaison statement to Working Party 1A on unwanted emissions of IMT-2020 systems utilizing active antenna systems (AAS) and total radiated power (copy to Working Party 1C for information)
�
� |
WP 5D
� |
� |
2017-10-13 |
|
[ 109 ]
�
� |
Proposed draft revision of Recommendation ITU-R SM.1054-0 - Monitoring of radio emissions from spacecraft at monitoring stations
�
� |
Germany (Federal Republic of)
� |
� |
2017-08-11 |
|
[ 108 ]
�
� |
Liaison statement to ITU-T Study Group 5, ITU-R Study Groups 1, 4, 5, 6 and their relevant Working Parties on ongoing collaboration
�
� |
ITU-D SG 2
� |
� |
2017-08-28 |
|
[ 107 ]
�
� |
Liaison statement on information about work being carried out under study in ITU-T Question 3/5
�
� |
ITU-T SG 5
� |
� |
2017-06-23 |
|
[ 106 ]
�
+Ann.1-18� |
Report of the meeting of Working Party 1C (Geneva, 13-20 June 2017)
�
� |
Chairman, WP 1C
� |
� |
2017-06-21 |
|
[ 105 ]
�
� |
Final list of participants - Working Party 1C (Geneva, 13-20 June 2017)
�
� |
Director, BR
� |
� |
2017-06-20 |
|
[ 104 ]
�
� |
List of documents issued (Documents 1C/39 - 1C/104)
�
� |
BR Study Groups Department
� |
� |
2017-06-13 |
|
[ 103 ]
�
� |
Implementation of Resolution 205 (Rev. WRC-15) "Protection of the systems operating in the mobile-satellite service in the frequency band 406-406.1 MHz"
�
� |
Director, BR
� |
� |
2017-06-09 |
|
[ 102 ]
�
� |
Report of Correspondence Group activities towards a preliminary draft new Report ITU-R SM.[SAT-MON]
�
� |
Chairman, CG on Satellite Monitoring
� |
� |
2017-06-09 |
|
[ 101 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[SAT-MON] - Measurement techniques and new technologies for satellite monitoring
�
� |
Chairman, CG on Satellite Monitoring
� |
Q 232/1
� |
2017-06-09 |
|
[ 100 ]
�
� |
Report of Correspondence Group activities on preliminary draft revision of Recommendation ITU-R SM.2355-0 on Spectrum Monitoring Evolution
�
� |
Chairman, CG on Spectrum Monitoring Evolution
� |
� |
2017-06-09 |
|
[ 99 ]
�
� |
Report of Correspondence Group activities on the revision of Recommendation ITU-R SM.1392-2 on essential requirements for a spectrum monitoring system for developing countries
�
� |
Chairman, CG on Rec. ITU-R SM.1392-2
� |
� |
2017-06-06 |
|
[ 98 ]
�
� |
Working document toward a preliminary draft new Recommendation ITU-R SM.[ACLR FOR LTE]
�
� |
Colombia (Republic of)
� |
� |
2017-06-06 |
|
[ 97 ]
�
� |
Proposal for the revision of Report ITU-R SM.2356 - Planning of spectrum-monitoring networks - Procedures for planning and optimization of spectrum-monitoring networks in the VHF/UHF frequency range
�
� |
United States of America
� |
� |
2017-06-05 |
|
[ 96 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1600 - Technical identification of digital signals - Technical identification of digital signals
�
� |
United States of America
� |
� |
2017-06-05 |
|
[ 95 ]
�
� |
Editorial revision of Recommendation ITU-R SM.1600 - Technical identification of digital signals
�
� |
United States of America
� |
� |
2017-06-05 |
|
[ 94 ]
�
� |
Proposed modifications to the preliminary draft new Recommendation ITU-R SM.[STORAGE OF I/Q DATA] - Data format definition for exchanging I/Q data regarding spectrum monitoring
�
� |
Japan
� |
� |
2017-06-05 |
|
[ 93 ]
�
� |
Activity Report of the Correspondence Group on the development of a PDN Recommendation ITU-R SM.[STORAGE OF I/Q DATA] on a harmonized data format for the storage of I/Q data
�
� |
GEW Technologies (Pty) Ltd.
� |
� |
2017-06-05 |
|
[ 92 ]
�
� |
Revision of Recommendation SM.1875 and proposal for preliminary draft new Report ITU-R SM.[DVB-POP]
�
� |
British Broadcasting Corporation (BBC)
� |
� |
2017-06-05 |
|
[ 91 ]
�
� |
Working document toward a preliminary draft new Recommendation ITU-R SM.[MOB DF PERF] - Performance evaluation of Mobile DF units
�
� |
Egypt (Arab Republic of)
� |
� |
2017-06-04 |
|
[ 90 ]
�
� |
Monitoring of the MSS frequency band at 406 MHz: Proposed revision of Recommendation ITU-R SM.1051-3
�
� |
France
� |
� |
2017-06-02 |
|
[ 89 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM. - Practical estimation of electromagnetic and interference environment at the point of location of measurements in GNSS frequency bands
�
� |
Russian Federation
� |
� |
2017-06-02 |
|
[ 88 ]
�
� |
Hellenic telecommunication and post commission (EETT) - Working document toward a preliminary draft new Recommendation ITU-R SM.[MOB DF PERF] - Performance evaluation of Mobile (non-Fixed) DF units in operational environment
�
� |
Greece
� |
� |
2017-06-02 |
|
[ 87 ]
�
� |
Report of Correspondence Group activities on preliminary draft revision of Recommendation ITU-R SM.1875-2 on DVB-T/T2 coverage measurements and verification of planning criteria
�
� |
Chairman, CG on DVB-T coverage measurements
� |
� |
2017-06-02 |
|
[ 86 ]
�
+Ann.a� |
Report of Correspondence Group activities on preliminary draft new Recommendation ITU-R SM.[STORAGE OF I/Q DATA] on a harmonized data format for the storage of I/Q data
�
� |
Chairman, CG on Storage of I/Q data
� |
� |
2017-06-02 |
|
[ 85 ]
�
� |
Preliminary draft revision of Recommendation ITU-R SM.1392-2 - Essential requirements for a spectrum monitoring system for developing countries
�
� |
GEW Technologies (Pty) Ltd.
� |
� |
2017-06-02 |
|
[ 84 ]
�
� |
Proposed revisions to Report ITU-R SM.2355-0 - Spectrum monitoring evolution
�
� |
China (People's Republic of)
� |
� |
2017-06-02 |
Results:233 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):