Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 366 ]
�
� |
Liaison statement on the new version of the Access Network Transport (ANT) - Standards Overview and Work Plan
�
� |
ITU-T SG 15
� |
� |
2018-10-24 |
|
[ 365 ]
�
� |
Liaison statement on the new version of the Home Network Transport (HNT) - Standards Overview and Work Plan
�
� |
ITU-T SG 15
� |
� |
2018-10-24 |
|
[ 364 ]
�
� |
Liaison statement to Working Parties 1A and 1B on protection of sound broadcasting receivers from WPT systems
�
� |
WP 6A
� |
Q210/1, AI9.1
� |
2018-10-24 |
|
[ 363 ]
�
� |
Reply liaison statement to ITU-R Working Pary 1A (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart grid utility management systems
�
� |
WP 5D
� |
� |
2018-10-23 |
|
[ 362 ]
�
� |
Reply liaison statement on revision of Reocmmendation ITU-R SM.329 (reply to ITU-R Wroking Parties 1A and 5D) - Unwanted emissions in the spurious domain
�
� |
ITU-T SG 5
� |
� |
2018-10-19 |
|
[ 361 ]
�
� |
Liaison statement on EMC standards and limits - Further reports of disturbances to radiocommunication systems
�
� |
ITU-T SG 5
� |
� |
2018-10-17 |
|
[ 360 ]
�
(Rev.1)� |
Liaison statement on operation of short-range radiocommunication public access system supporting hearing aid systems
�
� |
European Telecommunications Standards Institute
� |
� |
2018-10-10 |
|
[ 359 ]
�
� |
Liaison statement on ITU inter-Sector coordinaton: ITU-R Working Parties 1A, 1B, and 1C versus ITU-T Questions
�
� |
ITU-T SG 5
� |
� |
2018-10-10 |
|
[ 358 ]
�
� |
Liaison statement on work being carried out under study in ITU-T Question 3/5
�
� |
ITU-T SG 5
� |
� |
2018-10-01 |
|
[ 357 ]
�
� |
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7D for information) - Preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
�
� |
WP 7A
� |
� |
2018-09-28 |
|
[ 356 ]
�
� |
Reply liaison statement to Working Party 1B (copy to Working Party 1A, for information) - Protection criteria for SFTS in relation to WRC-19 agenda item 9.1, issue 9.1.6
�
� |
WP 7A
� |
AI9.1
� |
2018-09-28 |
|
[ 355 ]
�
� |
Liaison statement to Working Party 1A - Countering interference from broadcasting-satellite receiving equipment into EESS (passive) remote sensors
�
� |
WP 7C
� |
� |
2018-09-28 |
|
[ 354 ]
�
� |
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 7B) - System parameter tables in Recommendation ITU-R SM.1448
and Appendix 7 (Rev.WRC-15) of the Radio Regulations
�
� |
WP 7C
� |
� |
2018-09-28 |
|
[ 353 ]
�
� |
Liaison statement on G.fast PSD boost for underground networks
�
� |
ITU-T SG 15
� |
� |
2018-09-05 |
|
[ 352 ]
�
� |
Working Party 1C for action - ITU Intersectoral response to ICNIRP - Public consultation of the draft ICNIRP guidelines on limiting EMF exposure (100 kHz to 300 GHz)
�
� |
ATDI
,
ORANGE POLSKA S.A.
� |
Q239/1
� |
2018-08-02 |
|
[ 351 ]
�
� |
Liaison statement on ITU Inter-Sector coordination
�
� |
ITU-R SG11
� |
� |
2018-08-03 |
|
[ 350 ]
�
� |
Response on liaison statement from the ITU-R on 'EMI standards for LED lighting'
�
� |
International Special Committee on Radio Interference
� |
� |
2018-07-24 |
|
[ 349 ]
�
� |
CISPR response to ITU-R WP 1A liaison statement Document 1A/TEMP/133
�
� |
International Special Committee on Radio Interference
� |
� |
2018-07-24 |
|
[ 348 ]
�
� |
Liaison statement to Working Parties 1A and 1C - Definition of and test methods for OTA unwanted emission of IMT radio equipment
�
� |
WP 5D
� |
� |
2018-07-11 |
|
[ 347 ]
�
� |
Liaison statement on new terms and definitions in ITU-T Study Group 20 work
�
� |
SCV
� |
� |
2018-07-09 |
|
[ 346 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 1C, 4A and 7C) - Countering interference from broadcasting-satellite receiving equipment into EESS (passive) remote sensors
�
� |
WP 4B
� |
� |
2018-07-06 |
|
[ 345 ]
�
� |
Liaison statement to Working Parties 1A, 5A, 5B and 6A (copy to Working Party 1B for information) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]
�
� |
WP 3L
� |
� |
2018-07-02 |
|
[ 344 ]
�
� |
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A,
5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448
and Appendix 7 (Rev.WRC-15) of the Radio Regulations
�
� |
WP 4C
� |
� |
2018-07-02 |
|
[ 343 ]
�
� |
Reply liaison statement to Working Party 6A (copy to Working Parties 1A, 5B and 7A) - Draft CPM text on WRC-19 agenda item 9.1, Issue 9.1.6
�
� |
WP 1B
� |
AI9.1
� |
2018-06-28 |
|
[ 342 ]
�
� |
Reply liaison statement to ITU-R Working Party 1A on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014)
�
� |
WP 5B
� |
� |
2018-06-20 |
|
[ 341 ]
�
� |
Reply liaison statement to Working Parties 5D and 1A (copy to Study Group 1) - Unwanted emissions of IMT-2020 systems utilizing active antenna systems and total radiated power
�
� |
WP 1C
� |
� |
2018-06-12 |
|
[ 340 ]
�
+Ann.1-14� |
Report on the fifth 2015-2019 meeting of Working Party 1A (Geneva, 4-12 June 2018)
�
� |
Chairman, WP 1A
� |
� |
2018-06-12 |
|
[ 339 ]
�
� |
Final list of participants Working Party 1A (Geneva, 4-12 June 2018)
�
� |
Director, BR
� |
� |
2018-06-12 |
|
[ 338 ]
�
� |
Document brought to the attention of Working Party 1A
�
� |
Chairman, WP 1A
� |
� |
2018-06-04 |
|
[ 337 ]
�
� |
Liaison statement on considerations of EMC/EMI in relation to IMT
�
� |
ITU-T SG 5
� |
� |
2018-06-04 |
|
[ 336 ]
�
� |
Liaison statement on EMC standards and limits for multi-media equipment to CISPR and ITU-T Study Group 5
�
� |
ITU-T SG 5
� |
� |
2018-06-04 |
|
[ 335 ]
�
� |
List of documents issued (Documents 1A/260 - 1A/335)
�
� |
BR Study Groups Department
� |
� |
2018-06-04 |
|
[ 334 ]
�
� |
Report on CISPR activities from June to November 2017 - Including updated information for the period from November 2017 to May 2018
�
� |
Rapporteur, SG 1 RG on Liaison with CISPR
,
Rapporteur to CISPR on WPT issues
� |
� |
2018-06-01 |
|
[ 333 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L, 5B and 6A) - Applicability of Recommendation ITU-R M.1732 for use in studies undertaken in working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]
�
� |
WP 5A
� |
� |
2018-05-31 |
|
[ 332 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L and 6A) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz]
�
� |
WP 5A
� |
� |
2018-05-31 |
|
[ 331 ]
�
� |
Reply liaison statement to Working Parties 1A and 4C (copy for information to Working Parties 4A, 5D, 7B, and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations
�
� |
WPs 5A, 5B, 5C
� |
� |
2018-05-31 |
|
[ 330 ]
�
� |
Reply liaison statement to ITU-R Working Party 1A on preparations for WRC-19 agenda item 1.15 and the working document towards a preliminary draft new Report ITU-R SM.[275-450GHz_SHARING] (copy to Working Party 5A for information) - Input as related to WRC-19 agenda item 1.15 - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency ...
�
� |
WP 5C
� |
AI1.15
� |
2018-05-31 |
|
[ 329 ]
�
� |
Liaison statement to subcommittees H and F of the International Special Committee on radio interference and the International Electrotechnical Commission TC8
�
� |
WP 5B
� |
� |
2018-05-30 |
|
[ 328 ]
�
� |
Reply liaison statement to Working Party 1A (copy to Working Parties 1B, 3L, 5A, and 6A) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz]
�
� |
WP 5B
� |
� |
2018-05-30 |
|
[ 327 ]
�
� |
Recent developments concerning coexistence of wired telecommunication with radiocommunication systems
�
� |
Rapporteur, RG wired and radio
� |
Q236, Q221
� |
2018-05-28 |
|
[ 326 ]
�
� |
Proposed amendments to the working document towards draft CPM text for WRC-19 agenda item 1.15
�
� |
Canada
� |
AI1.15
� |
2018-05-28 |
|
[ 325 ]
�
� |
Proposed modifications to working document towards a preliminary draft new Report ITU-R SM.[275-450GHz_SHARING]
�
� |
Canada
� |
AI1.15
� |
2018-05-28 |
|
[ 324 ]
�
� |
Proposed modifications to working document towards a preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
�
� |
European Broadcasting Union
� |
� |
2018-05-28 |
|
[ 323 ]
�
� |
Proposed revisions to working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] (Contribution to ITU-R Working Party 1B with copy to Working Party 1A) - [Methodology for spectrum management of wireless power transmission (WPT)]
�
� |
European Broadcasting Union
� |
� |
2018-05-28 |
|
[ 322 ]
�
� |
This document has been withdrawn
�
� |
Germany (Federal Republic of)
� |
AI9.1
� |
2018-05-28 |
|
[ 321 ]
�
� |
Proposed draft new Report ITU-R SM.[275-450GHZ_SHARING] - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz
�
� |
Japan
� |
AI1.15
� |
2018-05-28 |
|
[ 320 ]
�
� |
Proposed draft CPM text or WRC-19 agenda item 1.15
�
� |
Japan
� |
AI1.15
� |
2018-05-28 |
|
[ 319 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[WPT.WIDE-BEAM.IMPACTS] - Impact study and human hazard issues for Wireless Power Transmission via radio frequency wide-beam
�
� |
Japan
� |
Q210/1
� |
2018-05-28 |
|
[ 318 ]
�
� |
Proposed revision of preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]
�
� |
Japan
� |
Q210/1, AI9.1
� |
2018-05-28 |
|
[ 317 ]
�
� |
Proposal on preliminary draft revision of Recommendation ITU-R SM.2110-0
�
� |
Japan
� |
Q210/1, AI9.1
� |
2018-05-28 |
Results:466 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):