Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 74 ]
�
+Ann.1-8� |
Report of the meeting of Working Party 1C (Geneva, 4 - 11 June 2013)
�
� |
Chairman, WP 1C
� |
� |
2013-06-11 |
|
[ 73 ]
�
(Rev.1)� |
Final list of participants - Working Party 1C (Geneva, 4-11 June 2013)
�
� |
Director, BR
� |
� |
2013-06-11 |
|
[ 72 ]
�
� |
List of documents issued (Documents 1C/36 - 1C/72)
�
� |
BR Study Groups Department
� |
� |
2013-06-03 |
|
[ 71 ]
�
� |
Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Groups 5 & 9 (copy to ITU-R Working Parties 1C and 5D for information) - Coexistence of wired and wireless communications systems - Revision of Recommendation ITU-T K.60
�
� |
WPs 5A, 5B and 5C
� |
� |
2013-05-31 |
|
[ 70 ]
�
� |
Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Group 15 (copy to ITU-R Working Parties 1C, 5D & 6A for information) - Coexistence of wired and wireless communications systems - Further developments on Recommendation ITU-T G.FAST
�
� |
WPs 5A, 5B and 5C
� |
� |
2013-05-31 |
|
[ 69 ]
�
� |
Results of the 20th RAG meeting (Geneva, 22 to 24 May 2013)
�
� |
Chairman, SG 1
� |
� |
2013-05-30 |
|
[ 68 ]
�
� |
Proposals for the preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY]
�
� |
MEDAV GmbH
� |
� |
2013-05-28 |
|
[ 67 ]
�
� |
Preliminary draft revision of Report ITU-R SM.2257 - Spectrum management and monitoring during major events
�
� |
Ukraine
� |
� |
2013-05-28 |
|
[ 66 ]
�
� |
Transmitters identification in a DVB-T SFN - The Italian experience
�
� |
Rai Way S.p.A.
� |
� |
2013-05-28 |
|
[ 65 ]
�
+Add.1-2� |
Report of the Correspondence Group on Technical identification of digital signals
�
� |
Chairman, CG -Digital Signals
� |
� |
2013-05-28 |
|
[ 64 ]
�
� |
Working document towards a preliminary draft new Report - Technical identification of digital signals
�
� |
China (People's Republic of)
� |
� |
2013-05-28 |
|
[ 63 ]
�
� |
Working materials towards a future output document on VHF/UHF spectrum monitoring station planning - A network cost-cutting measure in spectrum monitoring station planning
�
� |
China (People's Republic of)
� |
� |
2013-05-28 |
|
[ 62 ]
�
� |
Comments on working document towards a preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY]
�
� |
China (People's Republic of)
� |
� |
2013-05-28 |
|
[ 61 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION]
�
� |
Korea (Republic of)
� |
� |
2013-05-28 |
|
[ 60 ]
�
� |
Preliminary draft new Recommendation ITU-R SM.[SPECTRUM_MONITORING_EVOLUTION] - Spectrum monitoring evolution
�
� |
Korea (Republic of)
� |
� |
2013-05-28 |
|
[ 59 ]
�
� |
Preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY] - Test procedure for measuring DF accuracy
�
� |
Korea (Republic of)
� |
� |
2013-05-28 |
|
[ 58 ]
�
� |
Preliminary draft revision of Recommendation ITU-R SM.1537 - Automation and integration of spectrum monitoring systems with automated spectrum management
�
� |
United States of America
� |
� |
2013-05-24 |
|
[ 57 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[RADIO_VISUALIZING] - The radio source visualizing technology for spectrum monitoring
�
� |
Japan
� |
� |
2013-05-27 |
|
[ 56 ]
�
� |
Draft revision of Recommendation ITU-R SM.1837
�
� |
Rohde & Schwarz GmbH & Co. KG
� |
� |
2013-05-22 |
|
[ 55 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum Monitoring Evolution
�
� |
Chairman, CG on Spectrum Monitoring Evolution
� |
� |
2013-05-21 |
|
[ 54 ]
�
� |
Preliminary draft new Recommendation ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum Monitoring Evolution
�
� |
Chairman, CG on Spectrum Monitoring Evolution
� |
� |
2013-05-21 |
|
[ 53 ]
�
� |
Preliminary draft new Recommendation ITU-R SM[DF_ACCURACY] - Test procedure for measuring DF accuracy
�
� |
Chairman, CG on DF Accuracy
� |
� |
2013-05-17 |
|
[ 52 ]
�
� |
Results of the 19th RAG meeting (Geneva, 25 to 27 June 2012)
�
� |
Chairman, SG 1
� |
� |
2013-05-16 |
|
[ 51 ]
�
� |
Preliminary draft revision of Recommendation ITU-R SM.1051 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz
�
� |
United States of America
� |
� |
2013-05-10 |
|
[ 50 ]
�
� |
Liaison statement to ITU-T Study Group 5 and ITU-R Working Party 1A (copy to ITU-R Working Parties 1C, 5A, 5B, and 5C for information) - Coexistence of wired and wireless communications systems
�
� |
WP 6A
� |
� |
2013-05-08 |
|
[ 49 ]
�
� |
Preliminary draft revision of Recommendation ITU-R. SM 575-1 - Protection of fixed monitoring stations against interference
�
� |
Germany (Federal Republic of)
� |
� |
2013-04-30 |
|
[ 48 ]
�
� |
Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR)
�
� |
ITU-T FG-DR&NRR
� |
� |
2013-04-17 |
|
[ 47 ]
�
� |
Working materials towards a future output document on spectrum monitoring station planning - Planning of VHF/UHF spectrum monitoring networks in mountainous regions
�
� |
Kazakhstan (Republic of)
� |
� |
2013-03-28 |
|
[ 46 ]
�
� |
Work under study in ITU-T Question 7/5
�
� |
ITU-T SG 5
� |
� |
2013-02-15 |
|
[ 45 ]
�
+Add.1� |
Liaison statement - Study Group 5 activities related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks
�
� |
ITU-T SG 5
� |
� |
2013-02-15 |
|
[ 44 ]
�
� |
Working document towards a preliminary draft new Report - Procedures for planning and optimization of spectrum-monitoring networks in the VHF/UHF frequency band
�
� |
Russian Federation
� |
� |
2013-01-22 |
|
[ 43 ]
�
� |
Reply liaison statement on Recommendation ITU-R SM.1875 - DVB-T coverage measurements and verification of planning criteria
�
� |
WP 6A
� |
� |
2012-11-02 |
|
[ 42 ]
�
� |
Liaison statement on ITU-D Q. 23/1
�
� |
ITU-D SG 1
� |
� |
2012-08-16 |
|
[ 41 ]
�
� |
Liaison statement - Establishment of Focus Group on Disaster Relief Systems, Network Resilience and Recovery
�
� |
Chairman, FG-DR&NRR
� |
� |
2012-07-03 |
|
[ 40 ]
�
� |
Liaison statement to Working Party 1A (copy to Working Party 1C) - Question ITU-R 230-2/3 brought to the attention of Study Group 1
�
� |
WP 3L
� |
� |
2012-07-02 |
|
[ 39 ]
�
� |
Editorial revision of Annexes 1 and 2 to Recommendation ITU-R SM.1875 - DVB-T coverage measurement and verification of planning criteria
�
� |
Chairmen, SG 1 and WP 1C
� |
� |
2012-06-27 |
|
[ 38 ]
�
� |
Liaison statement to Working Party 4C (copy to Working Party 1C) - Report ITU-R SM.[406MHZIX]
�
� |
SG 1
� |
� |
2012-06-27 |
|
[ 37 ]
�
� |
Liaison statement to Working Party 3L (copy to Working Party 1C) - Question ITU-R 230-2/3 brought to the attention of Study Group 1
�
� |
WP 1A
� |
� |
2012-06-15 |
|
[ 36 ]
�
+Ann.1-5� |
Report of the meeting of Working Party 1C (Geneva, 6 - 13 June 2012)
�
� |
Chairman, WP 1C
� |
� |
2012-06-15 |
|
[ 35 ]
�
� |
Final list of Participants - Geneva, 6-12 June 2012
�
� |
Director, BR
� |
� |
2012-06-12 |
|
[ 34 ]
�
� |
List of documents issued
�
� |
BR Study Groups Department
� |
� |
2012-06-05 |
|
[ 33 ]
�
� |
Liaison statement to relevant Working Parties of Study Group 5 on further studies on cognitive radio systems (CRS) (copy for information to relevant Working Parties of Study Groups 1, 4, 6 and 7)
�
� |
WP 5A
� |
� |
2012-06-05 |
|
[ 32 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1600 Technical identification of digital signals
�
� |
Korea (Republic of)
,
THALES Communications
� |
� |
2012-05-30 |
|
[ 31 ]
�
� |
Resolution ITU-R 58 - Studies on cognitive radio systems
�
� |
Canada
� |
� |
2012-05-30 |
|
[ 30 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[MAJOR_EVENTS] - Spectrum management and monitoring during major events
�
� |
United Arab Emirates
� |
� |
2012-05-30 |
|
[ 29 ]
�
� |
Draft revision to the structure of preliminary draft new Report ITU-R SM.[MAJOR_EVENTS] - Spectrum Management and Monitoring During Major Events
�
� |
China (People's Republic of)
� |
� |
2012-05-30 |
|
[ 28 ]
�
� |
An introduction to the application of ICA (Independent Component Analysis) method for interference signal separation in radio monitoring
�
� |
Japan
� |
� |
2012-05-30 |
|
[ 27 ]
�
� |
Explanations for the working document towards a preliminary draft revision of Recommendation ITU-R SM.1753-1 - Methods for measuring radio noise
�
� |
Japan
� |
� |
2012-05-30 |
|
[ 26 ]
�
� |
Working document towards a preliminary draft new Report - Spectrum occupancy
�
� |
Korea (Republic of)
� |
� |
2012-05-30 |
|
[ 25 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R SM.[EVOLUTION_MONITORING_SYSTEM] - Evolution in spectrum monitoring systems
�
� |
Korea (Republic of)
� |
� |
2012-05-30 |
Results:174 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):