International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : SG01 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�SG01� C�

ITU-R�SG01

Spectrum Management

Results:185 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 85 ]
Liaison statement to ITU-T Study Group 13 Question 16/13 (copy to ITU-R Study Group 1 and for information to Working Parties 5A, 5B and 5C) � WP 5D 2013-07-22
[ 84 ]
+Ann.1
Summary record of the meeting of Radiocommunication Study Group 1 (Geneva, 12 June 2013) � Chairman, SG 1 2013-06-20
[ 83 ]
Final list of participants - Study Group 1 (Geneva, 12 June 2013) � Director, BR 2013-06-12
[ 82 ]
List of documents issued (Documents 1/46 - 1/82) � BR Study Groups Department 2013-06-11
[ 81 ]
(Rev.1)
Executive Report to Study Group 1 � Chairman, WP 1C 2013-06-11
[ 80 ]
(Rev.2)
Executive Report of the meeting of Working Party 1B (Geneva, 4 -11 June 2013) � Chairman, WP 1B 2013-06-11
[ 79 ]
(Rev.1)
Executive Report of the meeting of Working Pary 1A (Geneva, 4 - 11 June 2013) � Chairman, WP 1A 2013-06-11
[ 78 ]
(Rev.1)
Draft modification of Annex 2 to Recommendation ITU-R SM.1875 - DVB-T coveraage measurements and verification of planning criteria � WP 1C 2013-06-11
[ 77 ]
(Rev.1)
New Report ITU-R SM.[RADIO_VISUALIZING] - The radio source visualizing technology for spectrum monitoring � WP 1C 2013-06-11
[ 76 ]
Liaison statement to ITU-R Study Group 6 (copy to ITU-R Study Groups 1, 3, 4, 5, 7 and ITU-T Study Group 11) - Broadcasting terms and definitions � CCV 2013-06-11
[ 75 ]
(Rev.1)
Draft new Recommendation ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum monitoring evolution � WP 1C 235/1 2013-06-11
[ 74 ]
(Rev.1)
Draft modification of Recommendation ITU-R SM.1879-1 - The impact of power line high data rate telecommunication systems on radiocommunication systems below 30 MHz and between 80 and 470 MHz � WP 1A 2013-06-11
[ 73 ]
(Rev.1)
Draft new Question ITU-R [THz]/1 - Technical and operational characteristics of the active services operating in the range 275-1 000 GHz � WP 1A 2013-06-10
[ 72 ]
(Rev.1)
Modification of Report ITU-R SM.2153-3 - Technical and operating parameters and spectrum requirements for short-range devices � WP 1B 2013-06-10
[ 71 ]
(Rev.1)
Draft modification of Recommendation ITU-R SM.1541-4 - Unwanted emissions in the out-of-band domain � WP 1A 2013-06-10
[ 70 ]
(Rev.1)
Editorial modification of Recommendation ITU-R SM.329-12 - Unwanted emissions in the spurious domain � WP 1A 2013-06-10
[ 69 ]
(Rev.1)
New Report ITU-R SM.[PLT RAD-PSD] - Methodologies to relate radiation from PLT installations to PLT modem output - New Report ITU-R SM.[PLT RAD-PSD] - Methodologies to Relate Radiation from Power Line Telecommunication Installations to Power Line Telecommunication Modem Output � WP 1A 2013-06-10
[ 68 ]
(Rev.1)
Modification of Report ITU-R SM.2158-2 with regard to man-made noise - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz � WP 1A 2013-06-10
[ 67 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.1370-1 - Design guidelines for developing advanced automated spectrum management systems � WP 1B 2013-06-10
[ 66 ]
Draft terms of reference for the proposed Study Group 1 [CO]-Rapporteur[S] on the review of ITU-R Recommendations in the SM series for the database on ITU-R Recommendations � WPs 1A, 1B and 1C 2013-06-10
[ 65 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.575-1 - Protection of fixed monitoring stations against interference � WP 1C 2013-06-10
[ 64 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.1537 - Automation and integration of spectrum monitoring systems with automated spectrum management � WP 1C 2013-06-10
[ 63 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.1837 - Test procedure for measuring the 3rd order intercept point (IP3) level of radio monitoring receivers � WP 1C 2013-06-10
[ 62 ]
Draft revision of Recommendation ITU-R SM.1051-2 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz � WP 1C 2013-06-10
[ 61 ]
(Rev.1)
Modification of Report ITU-R SM.2257 - Spectrum management and monitoring during major events � WP 1C 2013-06-10
[ 60 ]
Work of the Correspondence Group on the Digital Dividend - Derivation and implementation of the "Digital Dividend" - a European perspective � British Broadcasting Corporation (BBC) 2013-06-05
[ 59 ]
CISPR response to Question ITU-R 210-3/1 brought to their attention � Director, BR 2013-05-31
[ 58 ]
Results of the 20th RAG meeting (Geneva, 22 to 24 May 2013) � Chairman, BR SG 1 2013-05-30
[ 57 ]
Proposal for work during the June 2013 meeting of Working Party 1B � Chairman, SG 1 CG on Digital Dividend Issues 2013-05-21
[ 56 ]
Results of the 19th RAG meeting (Geneva, 25 to 27 June 2012) � Chairman, SG 1 2013-05-16
[ 55 ]
Liaison statement on nomination of JCA-AHF representatives � ITU-T JCA-AHF 2013-05-14
[ 54 ]
Recommendation ITU-R SM. 329 - Editorial correction in English version � Israel (State of) 2013-04-25
[ 53 ]
Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR) � ITU-T FG-DR&NRR 2013-04-17
[ 52 ]
Liaison statement to ITU-R Study Groups 1, 3, 4, 5, 6 and 7 - ITU-R Study Groups Vocabulary Work � CCV 2012-11-16
[ 51 ]
Liaison statement from ITU-D Study Group 1 - Invitation to participate in and provide input to the work of the Correspondence Group on the Elaboration of a Working Definition of the Term "ICT" � ITU-D SG 1 2012-10-24
[ 50 ]
Liaison statement to Study Group 1 (copy to Working Party 1A) - Active services operating above 275 GHz � WP 7D 2012-10-10
[ 49 ]
Editorial revision of Annexes 1 and 2 to Recommendation ITU-R SM.1875 - DVB-T coverage measurements and verification of planning criteria � Chairmen, SG 1 and WP 1C 2012-06-27
[ 48 ]
Study Group 5 Recommendation ITU-R M.1581-4 to be brought to the attention of Study group 1 � SG 5 2012-06-27
[ 47 ]
Study Group 5 Recommendation ITU-R M.1580-4 to be brought to the attention of Study Group 1 � SG 5 2012-06-27
[ 46 ]
+Ann.1
Summary record of the meeting of Radiocommunication Study Group 1 (Geneva, 14 June 2012) � Chairman, SG 1 2012-06-18
[ 45 ]
Final list of Participants - Geneva, 14 June 2012 � Chairman, SG 1 2012-06-15
[ 44 ]
List of documents issued � BR Study Groups Department 2012-06-14
[ 43 ]
Executive Report of the meeting of Working Party 1B (Geneva, 6 - 13 June 2012) � Chairman, WP 1B 2012-06-13
[ 42 ]
Executive Report of the meeting of Working Party 1A (Geneva, 6-13 June 2012) � Chairman, WP 1A 2012-06-13
[ 41 ]
+Corr.1
Executive Report of the meeting of Working Party 1C (Geneva, 6 - 13 June 2012) � Vice-Chairman, WP 1C 2012-06-13
[ 40 ]
Draft revision of Question ITU-R 210-2/1 - Wireless power transmission � WP 1A 2012-06-13
[ 39 ]
(Rev.1)
Draft modification of Recommendation ITU-R SM.329-11 - Unwanted emissions in the spurious domain � WP 1A 2012-06-13
[ 38 ]
(Rev.1)
Draft editorial revision of Section 2.2 in Annex 1 to Recommendation ITU-R SM.1875 - DVB-T coverage measurements and verification of planning criteria � WP 1C 2012-06-13
[ 37 ]
Proposed suppression of Questions assigned to Working Party 1C � WP 1C 2012-06-13
[ 36 ]
Proposed suppression of ITU-R Recommendations assigned to Working Party 1C � WP 1C 2012-06-13
Results:185 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2015-10-23