Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 215 ]
�
� |
Proposal for draft CPM text on WRC-12 Agenda item 1.11
�
� |
European Space Agency (ESA)
� |
� |
2010-06-02 |
|
[ 214 ]
�
� |
Assessment of spectrum requirements for future SRS missions operating under a potential new SRS allocation in the band 22.55-23.15 GHz
�
� |
European Space Agency (ESA)
� |
� |
2010-06-02 |
|
[ 213 ]
�
� |
Compatibility aspects between SRS missions and potential MSS systems in the bands 7 145-7 235 MHz and 8 400-8 500 MHz
�
� |
European Space Agency (ESA)
� |
� |
2010-06-02 |
|
[ 212 ]
�
� |
Compatibility assessment between SRS systems and Hibleo-type ISS systems in the band 22.55-23.15 GHz
�
� |
European Space Agency (ESA)
� |
� |
2010-06-02 |
|
[ 211 ]
�
� |
Proposed modifications to CPM texts on Agenda item 1.11 - Spectrum requirement for SRS and constraints on an SRS allocation
�
� |
Indonesia (Republic of)
� |
� |
2010-06-02 |
|
[ 210 ]
�
� |
Sharing study for Hibleo-type inter-satellite link in the 22.55-23.55 GHz band under WRC-12 Agenda item 1.11
�
� |
Japan
� |
� |
2010-05-31 |
|
[ 209 ]
�
� |
Sharing studies between SRS and MSS in the 7 145-7 235 MHz and 8 400-8 500 MHz bands under WRC-12 Agenda item 1.25
�
� |
Japan
� |
� |
2010-05-31 |
|
[ 208 ]
�
� |
Preliminary draft new Report ITU-R RS.[ESSENTIAL ROLE OBSERVATIONS] - The essential role and global importance of radio spectrum use for Earth observations and for related applications
�
� |
Rapporteur of Correspondence Group
� |
� |
2010-05-31 |
|
[ 207 ]
�
� |
Working document towards draft CPM text on WRC-12 Agenda item 1.24
�
� |
Korea (Republic of)
� |
� |
2010-05-31 |
|
[ 206 ]
�
� |
Working document towards Draft CPM Text on WRC-12 Agenda item 1.11
�
� |
Korea (Republic of)
� |
� |
2010-05-31 |
|
[ 205 ]
�
� |
Compatibility assessment of SRS (Earth-to-space) into HIBLEO-2 ISS in the band 22.55-23.15 GHz - Interference assessment of SRS into HIBLEO-2 ISS
�
� |
Australia
� |
� |
2010-05-25 |
|
[ 204 ]
�
� |
ITU-R Study Group 5 Recommendation to be brought to the attention of Study Group 7
�
� |
BR Study Group Department
� |
� |
2010-05-11 |
|
[ 203 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5C, 6B, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of tuning ranges for use by terrestrial electronic news gathering
�
� |
WP 6A
� |
� |
2010-05-04 |
|
[ 202 ]
�
� |
Liaison statement to Working Party 7B - Information for studies relatd to WRC-12 Agenda item 1.25
�
� |
WP 4C
� |
� |
2010-04-30 |
|
[ 201 ]
�
� |
Liaison statement to Working Parties 5A, 5C, 7A, 7B, 7C and 7D regarding potential candidate bands for BSS feeder links under WRC-12 Agenda item 1.13
�
� |
WP 4A
� |
� |
2010-04-30 |
|
[ 200 ]
�
� |
Liaison statement Working Party 7B (copy to Working Party 5C for information) - Parameters for compatibility studies between NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11
�
� |
WP 4A
� |
� |
2010-04-30 |
|
[ 199 ]
�
� |
Liaison statement to Working Party 5C with copy to Working Party 7B - Considerations on protection criteria for NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11
�
� |
WP 4A
� |
� |
2010-04-30 |
|
[ 198 ]
�
� |
Proposed revision of Recommendation ITU-R SA.1041-1
�
� |
European Space Agency (ESA)
� |
� |
2010-04-29 |
|
[ 197 ]
�
� |
Liaison statement to the relevant Working Parties of Study Groups 4, 5, 6 and 7 (copy to ITU-T Study Group 15 for information) - Further work on power line telecommunications
�
� |
WP 1A
� |
221-1/1
� |
2010-03-01 |
|
[ 196 ]
�
� |
Liaison statement to Working Parties 5C and 7B - Draft CPM text for WRC-12 Agenda item 1.6 - Resolution 955 (WRC-07)
�
� |
WP 1A
� |
� |
2010-02-18 |
|
[ 195 ]
�
� |
Draft Liaison statement to Working Parties 4A, 4C, 5A, and 6A (copy to Working Parties 5B, 5C, 7A, 7B, 7C and Study Group 3) on WRC-12 Agenda item 1.2
�
� |
WP 1B
� |
� |
2010-02-17 |
|
[ 194 ]
�
+Corr.1� |
Additional information for the preparation of the draft CPM Report to WRC-12
�
� |
Chairman, CPM-11
� |
� |
2010-01-22 |
|
[ 193 ]
�
� |
Liaison statement to Working Parties 3M, 7B and 7C - Progress of work on WRC-12 Agenda item 1.20
�
� |
WP 5C
� |
� |
2009-12-17 |
|
[ 192 ]
�
� |
Liaison statement to ITU-R Working Party 7B on technical information regarding studies between the space research service (space-to-Earth) and the aeronautical mobile service in the 37-38 GHz band
�
� |
WP 5B
� |
� |
2009-12-11 |
|
[ 191 ]
�
� |
Liaison statement - Sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz
�
� |
WP 5C
� |
� |
2009-12-08 |
|
[ 190 ]
�
� |
Liaison statement - Sharing analysis between non-GSO meteorological satellite systems operating in the space-to-Earth direction and fixed service systems in the band 7 850-7 900 MHz
�
� |
WP 5C
� |
� |
2009-12-08 |
|
[ 189 ]
�
� |
Liaison statement - Work on the revisions of Recommendations ITU-R F.1247, F.1249 and F.1509 in relation to the proposed preliminary draft revisions of Recommendations ITU-R SA.1275 and SA.1276
�
� |
WP 5C
� |
� |
2009-12-08 |
|
[ 188 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Party 7B) - Considerations on protection criteria for NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11
�
� |
WP 5C
� |
� |
2009-12-08 |
|
[ 187 ]
�
� |
Liaison statement to Working Party 7B (copy to WP 5C for information) - Draft new Recommendation ITU-R BT.[ENGUSER] - User requirements for digital electronic news gathering
�
� |
WP 6B
� |
� |
2009-12-08 |
|
[ 186 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7D and to the Working Party of the Special Committee - WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems
�
� |
WP 5C
� |
� |
2009-12-04 |
|
[ 185 ]
�
� |
Reply liaison statement to ITU-R Working Party 7B on sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz
�
� |
WP 5B
� |
� |
2009-12-01 |
|
[ 184 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems
�
� |
WP 6B
� |
� |
2009-11-20 |
|
[ 183 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5C, 6B, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems.
�
� |
WP 6A
� |
� |
2009-11-20 |
|
[ 182 ]
�
� |
Liaison statement to ITU-R Study Group 3 and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D on the progress of WRC-12 Agenda item 1.19
�
� |
WP 1B
� |
� |
2009-10-12 |
|
[ 181 ]
�
+Ann.1-14� |
Report on the September 2009 meeting of Working Party 7B with a view to its next meeting (June 2010)
�
� |
Chairman, WP 7B
� |
� |
2009-09-14 |
|
[ 180 ]
�
� |
Final List of Participants - Geneva, 8-14 September 2009
�
� |
Director, BR
� |
� |
2009-09-14 |
|
[ 179 ]
�
� |
Liaison statement to Working Parties 7B, 7C and 7D - Informations for studies related to WRC-12 Agenda item 1.25
�
� |
WP 4C
� |
� |
2009-09-09 |
|
[ 178 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2009-09-07 |
|
[ 177 ]
�
� |
Liaison statement to Working Party 7B - Information for studies related to WRC-12 Agenda item 1.25
�
� |
WP 4C
� |
� |
2009-09-04 |
|
[ 176 ]
�
� |
Compatibility of SRS earth stations that may use the band 22.55-23.15 GHz with HIBLEO-2 ISL in the band 23.15-23.55 GHz
�
� |
France
� |
� |
2009-09-01 |
|
[ 175 ]
�
� |
Working document towards draft CPM text on WRC-12 Agenda item 1.11
�
� |
France
� |
� |
2009-09-01 |
|
[ 174 ]
�
� |
Preliminary draft revision of Recommendation ITU-R SA.1276-1 - Orbital locations of data relay satellites to be protected from the emissions of fixed service systems operating in the band 25.25-27.5 GHz
�
� |
China (People's Republic of)
� |
� |
2009-09-01 |
|
[ 173 ]
�
� |
Preliminary draft revision of Recommendation ITU-R SA.1275-1 - Orbital locations of data relay satellites to be protected from the emissions of fixed service systems operating in the band 2 200-2 290 MHz
�
� |
China (People's Republic of)
� |
� |
2009-09-01 |
|
[ 172 ]
�
� |
Working document towards draft CPM text on WRC-12 Agenda item 1.12
�
� |
Korea (Republic of)
� |
� |
2009-09-01 |
|
[ 171 ]
�
� |
Compatibility assessment between SRS systems and ISS systems in the band 22.55-23.15 GHz
�
� |
European Space Agency (ESA)
� |
� |
2009-08-31 |
|
[ 170 ]
�
� |
Required sharing analyses for WRC-12 Agenda item 1.25
�
� |
European Space Agency (ESA)
,
EUMETSAT
� |
� |
2009-08-31 |
|
[ 169 ]
�
� |
WRC-12 Agenda item 7 - Modification to advance publication of information of a satellite network or system not subject to coordination procedure under Section II of Article 9 of the Radio Regulations
�
� |
France
� |
� |
2009-08-26 |
|
[ 168 ]
�
� |
WRC-12 Agenda item 7 - Examination of frequency assignments to an inter-satellite link of a geostationary space station communicating with a non-geostationary space station
�
� |
France
� |
� |
2009-08-26 |
|
[ 167 ]
�
� |
WRC-12 Agenda item 7 - Correction to the averaging bandwidth prescribed in Annex 2 of Appendix 4 to the Radio Regulations
�
� |
France
� |
� |
2009-08-26 |
|
[ 166 ]
�
� |
An analytical methodology to evaluate the interference to HIBLEO-2 and other NGSO inter-satellite services, caused by emissions from the SRS Earth stations
�
� |
Israel (State of)
� |
� |
2009-08-30 |
Results:315 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):