Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 503 ]
�
� |
Preliminary draft new Report F.[ENGTUNING RANGES]
�
� |
United States of America
� |
� |
2011-06-01 |
|
[ 502 ]
�
� |
Input on Annex 3 to the Chairman's Report (Doc. 5C/461) - Preliminary draft new Report ITU-R F.[ENGSHARE]
�
� |
United States of America
� |
� |
2011-06-01 |
|
[ 501 ]
�
� |
Proposed revisions to preliminary draft new Recommendation ITU-R F.[HAPS-GATEWAY] - Evaluation of interference from high altitude platform gateway links in the fixed service to conventional fixed wireless systems in the range 5 850-7 075 MHz
�
� |
United States of America
� |
� |
2011-06-01 |
|
[ 500 ]
�
� |
Working document towards a draft new Report ITU-R F.[FS-SDR] on the impact of software defined radio (SDR) and cognitive radio systems (CRS) on the fixed service
�
� |
United States of America
� |
� |
2011-06-01 |
|
[ 499 ]
�
� |
ENG Workplan
�
� |
United States of America
� |
� |
2011-06-01 |
|
[ 498 ]
�
� |
Preliminary draft new Report F.[ENGDEPLOYMENT]
�
� |
United States of America
� |
� |
2011-06-01 |
|
[ 497 ]
�
� |
Sharing study between haps gateway links and passive microwave sensors operating in the 6 425-7 075 MHz band for measurements over water
�
� |
France
� |
� |
2011-05-31 |
|
[ 496 ]
�
� |
Coexistence between fixed service operating in 71-76/81-86 GHz and the passive services (AI 1.8)
�
� |
France
� |
� |
2011-05-31 |
|
[ 495 ]
�
� |
Proposal for frequency bands for harmonization of tuning ranges for ENG use on a regional/worldwide basis (WRC-12 Agenda item 1.5)
�
� |
France
,
Germany (Federal Republic of)
,
Netherlands (Kingdom of the)
� |
� |
2011-05-31 |
|
[ 494 ]
�
� |
Proposal for consideration of development of a new ITU-R Question on fixed service use and future developments
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2011-05-27 |
|
[ 493 ]
�
� |
Review of ITU-R opinions relating to the scope of Study Group 5 (for consideration for Working Parties 5A and 5B for information)
�
� |
Chairman, SG 5
� |
� |
2011-05-26 |
|
[ 492 ]
�
� |
Liaison statement to Working Party 5C - Revision of Recommendation ITU-R F.1245-1
�
� |
WP 4A
� |
� |
2011-05-25 |
|
[ 491 ]
�
� |
Liaison statement to Working Party 5C - Draft revision of Recommendation ITU-R SF.675-3 "Calculation of the maximum power density (averaged over 4 kHz) of an angle modulated carrier"
�
� |
WP 4A
� |
� |
2011-05-25 |
|
[ 490 ]
�
� |
Liaison statement to Working Party 5C - Review of certain SF-Series Recommendations
�
� |
WP 4A
� |
� |
2011-05-25 |
|
[ 489 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Party 4C for information) - Consideration of draft revision of Recommendation ITU-R F.758-4
�
� |
WP 4A
� |
� |
2011-05-25 |
|
[ 488 ]
�
� |
Liaison statement to Working Pary 5C - Power flux-density (pfd) level for gateway links for high altitude platform stations (HAPS) in the frequency band 5 850-7 075 MHz
�
� |
WP 4A
� |
� |
2011-05-25 |
|
[ 487 ]
�
� |
Liaison statement to Working Party 5C - Statistical methodology for assessing the interference of the satellite services on a fixed service deployment
�
� |
WP 4A
� |
� |
2011-05-25 |
|
[ 486 ]
�
� |
Proposed revision of Report ITU-R F.2060 - Fixed service use in the IMT-2000 transport network
�
� |
Canada
� |
� |
2011-05-20 |
|
[ 485 ]
�
� |
Liaison statement to Working Parties 5A, 5B and 5C on compatibility studies between RDSS, MSS and other services in the 2 483.5-2 500 MHz band
�
� |
WP 4C
� |
� |
2011-05-20 |
|
[ 484 ]
�
� |
Liaison statement to Working Party 1A (copy to relevant Working Parties of Study Groups 4, 5, 7 and copy to ITU-T Study Groups 9 and 15 for information) - Further work on power line telecommunications
�
� |
WP 6A
� |
� |
2011-05-20 |
|
[ 483 ]
�
� |
Liaison statement to Working Party 1A (copy to relevant Working Parties of Study Groups 4, 5, 7 and copy to ITU-T Study Groups 9 and 15 for information) - Further work on power line telecommunications
�
� |
WP 6A
� |
� |
2011-05-20 |
|
[ 482 ]
�
� |
Protection of the terrestrial services -fixed, mobile and radiolocation- against radiation from PLT, 30-470 MHz
�
� |
Israel (State of)
� |
221/1
� |
2011-05-16 |
|
[ 481 ]
�
� |
Liaison statement to ITU-R Working Party 1A and its Rapporteur Group on PLT issues (copy to ITU-R Working Parties 3L, 4C, 5A, 5B, 6A and 7D and to ITU-T Study Groups 5 and 15) - Working Party 5A, 5B and 5C comments relating to PLT systems
�
� |
WPs 5A, 5B, 5C
� |
� |
2011-05-04 |
|
[ 480 ]
�
� |
Liaison statement to Working Parties 4A, 5A, 5C, 7B and 7C (copied to Working party 3M for information) - Sharing studies related to WRC-12 Agenda item 1.25
�
� |
WP 4C
� |
� |
2011-05-04 |
|
[ 479 ]
�
� |
Liaison statement to Working Parties 4A and 5C - Consideration of draft revision of Recommendation ITU-R F.758-4
�
� |
WP 4C
� |
� |
2011-05-04 |
|
[ 478 ]
�
� |
Liaison statement to Working Party 1A (copied to Working Parties 5A, 5B and 5C for information) - Protection of IMT systems against radiation from PLT
�
� |
WP 5D
� |
� |
2011-04-20 |
|
[ 477 ]
�
� |
Reply liaison statement to Working Party 5C (copied to working party 5A for information) - Studies in support of WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems
�
� |
WP 5D
� |
� |
2011-04-19 |
|
[ 476 ]
�
� |
Liaison statement - New versions of the access network transport (ANT) standardization overview and work plan
�
� |
ITU-T SG 15
� |
� |
2011-04-11 |
|
[ 475 ]
�
� |
Result of the proposed suppression of Recommendations ITU-R SF.1482 and SF.1483
�
� |
Chairmen, SG 4 and SG 5
� |
� |
2011-04-01 |
|
[ 474 ]
�
� |
Result of the proposed adoption by correspondence of draft revision of Recommendation ITU-R F.758-4
�
� |
Chairman, SG 5
� |
� |
2011-03-29 |
|
[ 473 ]
�
� |
Liaison statement to ITU-R Working Party 5C
�
� |
ITU-D SG 2
� |
� |
2011-03-28 |
|
[ 472 ]
�
� |
ITU-R Study Group 6 Question to be brought to the attention of ITU-R Study Groups 1 and 5
�
� |
BR Study Group Department
� |
� |
2011-03-23 |
|
[ 471 ]
�
� |
Further encouragement of the liaison activity with other groups
�
� |
Chairman, SG 5
� |
� |
2011-03-22 |
|
[ 470 ]
�
(Rev.1)� |
Progress of the studies requested by WRC Resolutions and Recommendations (except those related to WRC-12 Agenda items)
�
� |
Chairman, SG 5
� |
� |
2011-03-15 |
|
[ 469 ]
�
� |
ITU-R Study Group 7 Recommendation to be brought to the attention of Study Group 5
�
� |
BR Study Group Department
� |
� |
2010-03-11 |
|
[ 468 ]
�
� |
ITU-R Study Group 7 Recommendation to be brought to the attention of Study Group 5
�
� |
BR Study Group Department
� |
� |
2011-03-11 |
|
[ 467 ]
�
� |
ITU-R Study Group 1 Recommendation SM.1541-3 to be brought to the attention of Study Groups 4, 5, 6 and 7
�
� |
BR Study Group Department
� |
� |
2011-02-07 |
|
[ 466 ]
�
� |
Liaison statement to Study Group 4 - Results of the Study Group 5 meeting (22-23 November 2010) (copied to Working Parties 4A, 5A and 5C for information)
�
� |
SG 5
� |
� |
2010-12-16 |
|
[ 465 ]
�
� |
Liaison statement to Working Party 5C - Development of a Handbook on propagation information for the prediction of interference and coordination distance
�
� |
WP 3M
� |
� |
2010-12-08 |
|
[ 464 ]
�
� |
Liaison statement to Working Party 5C - Propagation basis for the determination of long-term interference
�
� |
WP 3M
� |
� |
2010-12-08 |
|
[ 463 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Party 5C for information)
�
� |
WP 3J
� |
� |
2010-12-08 |
|
[ 462 ]
�
� |
This document has been withdrawn
�
� |
BR Study Group Department
� |
� |
2010-11-26 |
|
[ 461 ]
�
+Ann.1-33� |
Report of the sixth meeting of Working Party 5C (Geneva, 9 - 18 November 2010)
�
� |
Chairman, WP 5C
� |
� |
2010-11-18 |
|
[ 460 ]
�
� |
Final List of Participants - Working Party 5C (Geneva, 9-18 November 2010)
�
� |
Director, BR
� |
� |
2010-11-18 |
|
[ 459 ]
�
� |
Liaison statement to ITU-R Working Party 5C - WP 5B comments to be included in the combined WP 5A, 5B and 5C response to WP 1A relating to PLT systems
�
� |
WP 5B
� |
� |
2010-11-18 |
|
[ 458 ]
�
� |
Liaison statement to ITU-R Working Party 5C (copy to WP 5D for information) - WP 5A comments to be included in the combined WPs 5A, 5B and 5C response to WP 1A relating to PLT systems
�
� |
WP 5A
� |
� |
2010-11-17 |
|
[ 457 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Party 5C) - Propagation basis for the determination of long-term interference
�
� |
WP 3M
� |
� |
2010-11-16 |
|
[ 456 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2010-11-08 |
|
[ 455 ]
�
� |
Draft revision of Recommendation ITU-R F.1497-1 - Radio-frequency channel arrangements for fixed wireless systems operating in the band 55.78-59 GHz
�
� |
Iran (Islamic Republic of)
� |
� |
2010-09-29 |
|
[ 454 ]
�
� |
Outcome of the sixth meeting of the joint IMO/ITU Experts Group on maritime radiocommunication matters
�
� |
International Maritime Organization
� |
� |
2010-10-14 |
Results:603 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):