International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4B� C�

ITU-R�WP4B

Systems, air interfaces, performance and availability objectives for FSS,BSS and MSS, including IP - based applications and satellite news gathering

Results:205 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 105 ]
Proposed liaison statement to ITU-D Study Group 2 Q.22/2 - Draft List of terminology on emergency telecommunications � France 2009-08-31
[ 104 ]
Proposed liaison statement to Working Party 6B - Study Group 4 SNG series of Recommendations � France 2009-08-31
[ 103 ]
Preliminary draft new Recommendation ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems � Korea (Republic of) 46-3/4 2009-08-24
[ 102 ]
Draft revision of Recommendation ITU-R S.1521 - Allowable error performance for a hypothetical reference digital path based on synchronous digital hierarchy � Korea (Republic of) 75-3/4 2009-08-24
[ 101 ]
Working document towards preliminary draft new Reports and/or Recommendations on reference network architectures, applications and performance, including QoS, for integrated systems operating within the mobile-satellite service in the 1-3 GHz bands � Korea (Republic of) 2009-08-24
[ 100 ]
Working document towards a preliminary draft new Report ITU-R M.[IP-MSS] - Reference system parameters for IP packet applications in the mobile-satellite service � Japan 287/4 2009-08-24
[ 99 ]
Working document towards a preliminary draft new Report or Recommendation - Impact of adaptive coding and modulation on availability objectives � Japan 73-2/4 2009-08-24
[ 98 ]
Working document towards a preliminary draft new Report on cross-platform model for satellite connection in support of cellular system � Japan 263-1/4 2009-08-24
[ 97 ]
Traffic control system for IP packet applications in satellite services � Japan 263-1/4 2009-08-24
[ 96 ]
Working document towards a preliminary draft new Report on cross layer based QoS provisioning in a satellite-terrestrial network in next generation network environment � United States of America 263-1/4 2009-08-28
[ 95 ]
Proposed modifications to the working document towards a preliminary draft new Recommendation / Report - Multi-carrier based techniques for satellite systems � Canada 46-3/4 2009-08-28
[ 94 ]
Draft list of terminology on emergency telecommunications � BR Study Group Department 2009-08-19
[ 93 ]
Liaison statement ITU-R Working Party 4B - Establishment of Focus Group on Future Networks (FG-FN) � Focus Group on Future Networks 2009-07-28
[ 92 ]
Summary notes on the BR workshop on the efficient use of the spectrum/orbit resource (Geneva, Switzerland, 6 May 2009) � Director, BR 2009-06-23
[ 91 ]
Liaison statement on new versions of the Access Network Transport (ANT) Standardization Plan and Work Plan � ITU-T SG 15 2009-05-20
[ 90 ]
Liaison statement on draft baseline text of G.hntreq "Requirements of transport functions in IP home network" � ITU-T SG 15 2009-05-20
[ 89 ]
Liaison statement to Working Party 4B - Study Group 4 SNG series of Recommendations � WP 6B 2009-05-13
[ 88 ]
Liaison statement to Working Parties 5C and 6B for action and to Working Parties 3M, 4B, 5A, 6A and 7D for information on WRC-11 Agenda item 1.13 � WP 4A 2009-05-11
[ 87 ]
Liaison statement to relevant ITU-R and ITU-T Study Groups and the ITU Coordination Committee for Vocabulary (CCV) regarding draft list of terminology on emergency telecommunications � ITU-D SG2 2009-05-07
[ 86 ]
Liaison statement to ITU-R Study Group 4 regarding an ITU-D Study Group 2 Report on Satellite Communications for Disaster Management � ITU-D SG 2 2009-04-30
[ 85 ]
+Ann.1-18
Report on the twenty sixth meeting of Working Party 4B - (Geneva, 22 - 29 April 2009) � Chairman, WP 4B 2009-04-29
[ 84 ]
Final List of Participants - Working Party 4B (Geneva, 22-29 April 2009) � Director, BR 2009-04-29
[ 83 ]
Liaison statement to Working Party 4B - Report on technical characteristics of the terrestrial component of an integrated system operating in the bands 1 525-1 559 MHz and 1 626.5-1 660.5 MHz � WP 4C 2009-04-24
[ 82 ]
List of documents issued � BR Study Group Department 2009-04-21
[ 81 ]
Working document on vehicle gateway platform � France 2009-04-15
[ 80 ]
Clarification about the appellation of networks using both satellite and terrestrial links � France 2009-04-15
[ 79 ]
Working document towards a preliminary draft new Report or Recommendation - Impact of adaptive coding and modulation on availability objectives � France 73-2/4 2009-04-15
[ 78 ]
Draft new Question ITU-R [HYBRID]/4 - System architecture and performance aspects on hybrid satellite and terrestrial systems � France 2009-04-15
[ 77 ]
Draft new Report ITU-R S.[TCPSAT] - Transmission control protocol (TCP) over satellite networks � France 236-1/4 2009-04-15
[ 76 ]
Draft revision of Recommendation ITU-R S.1711 - Performance enhancements of transmission control protocol over satellite networks � France 263-1/4 2009-04-15
[ 75 ]
Proposed modifications to the working document towards a preliminary draft new Recommendation on multi-carrier based multiple-access satellite systems and performance enhancement techniques � Canada 46-3/4 2009-04-14
[ 74 ]
Working document towards a preliminary draft new Recommendation on QoS for Voice Over IP (VOIP) transmission over satellite DVB-WiMAX network in the next generation network environment � United States of America 2009-04-10
[ 73 ]
Working document on current activities on transmission control protocols over satellite networks in Internet Engineering Task Force (IETF) � United States of America 2009-04-10
[ 72 ]
Working document towards a preliminary draft new Recommendation S.[MSS.INT-PERF] - QoS performance requirements for Integrated Systems operating within the mobile-satellite service in the bands 1 525-1 544 MHz, 1 545-1 559 MHz, 1 626.5-1 645.5 MHz and 1 646.5-1 660.5 MHz � United States of America 2009-04-10
[ 71 ]
Working document towards a preliminary draft new Recommendation - Key network performance elements for Integrated Systems operating within the mobile-satellite service in the bands 1 525-1 544 MHz, 1 545-1 559 MHz, 1 626.5-1 645.5 MHz and 1 646.5-1 660.5 MHz � United States of America 2009-04-10
[ 70 ]
Working document towards a preliminary draft new Recommendation - A reference network architecture for integrated systems operating within the mobile-satellite service in the bands 1 525-1 544 MHz, 1 545-1 559 MHz, 1 626.5-1 645.5 MHz and 1 646.5-1 660.5 MHz � United States of America 2009-04-10
[ 69 ]
Liaison statement on leading role of SG 2 on service definition � ITU-T SG 2 2009-04-08
[ 68 ]
Proposed modification to the working document towards a preliminary draft new Report or Recommendation on network architectures, applications and performance for integrated systems operating within the mobile-satellite service in the 1-3 GHz bands � Korea (Republic of) 2009-04-08
[ 67 ]
Proposed preliminary draft revision of Recommendation ITU-R S.1521 - Allowable error performance for a hypothetical reference digital path based on synchronous digital hierarchy � Korea (Republic of) 75-3/4 2009-04-08
[ 66 ]
Working document towards a preliminary draft new Recommendation/Report on multiple-access satellite systems and performance enhancement techniques � Japan 46-3/4 2009-04-07
[ 65 ]
Information on activities and output documents of ITU-T Focus Group ICTs & CC � Chairman ITU-T FG ICTs & CC 2009-04-02
[ 64 ]
Outdated references in the ITU-R Recommendations dealing with maritime and radiodetermination issues � Director, BR 2009-04-01
[ 63 ]
Liaison statement to Radiocommunication Study Groups and Working Parties � Chairman, CCV 2009-03-20
[ 62 ]
Response to Questionnaire from ITU-T Focus Group on ICT and climate change � Chairman, SG 4 2009-02-27
[ 61 ]
Liaison statement to all ITU-T, ITU-R and ITU-D SGs on request for multimedia contact person � ITU-T SG 16 2009-02-16
[ 60 ]
Liaison statement - Establishment of Focus Group on Future Networks (FG-FN) � ITU-T SG 13 2009-02-16
[ 59 ]
Establishment of Focus Group on Future Networks (FG-FN) � Chairman, ITU-T SG 13 2009-02-02
[ 58 ]
Liaison statement - Draft Recommendation G.hntreq � ITU-T SG 15 2008-12-18
[ 57 ]
Liaison statement - New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan � ITU-T SG 15 2008-12-18
[ 56 ]
Liaison statement to WP 4B on preliminary draft new Question ITU-R [HYBRID]/4 - System architecture and performance aspects on hybrid satellite and terrestrial systems � WP 5A 2008-12-03
Results:205 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2011-04-26